WP3 INERTIA Local Control and Automation Hub

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
FixtureFinder: Discovering the Existence of Electrical and Water Fixtures Vijay Srinivasan*, John Stankovic, Kamin Whitehouse University of Virginia *(Currently.
ITIL: Service Transition
Lecture 13 Revision IMS Systems Analysis and Design.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
Chapter 8 Object Design Reuse and Patterns. Object Design Object design is the process of adding details to the requirements analysis and making implementation.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Introduction to Software Project Estimation I (Condensed) Barry Schrag Software Engineering Consultant MCSD, MCAD, MCDBA Bellevue.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Identifying “Best Bet” Web Search Results by Mining Past User Behavior Author: Eugene Agichtein, Zijian Zheng (Microsoft Research) Source: KDD2006 Reporter:
Power Guru: Implementing Smart Power Management on the Android Platform Written by Raef Mchaymech.
Quality Is in the Eye of the Beholder: Meeting Users ’ Requirements for Internet Quality of Service Anna Bouch, Allan Kuchinsky, Nina Bhatti HP Labs Technical.
September 2003, 7 th EDG Conference, Heidelberg – Roberta Faggian, CERN/IT CERN – European Organization for Nuclear Research The GRACE Project GRid enabled.
Using Blog Properties to Improve Retrieval Gilad Mishne (ICWSM 2007)
Profiling: What is it? Notes and reflections on profiling and how it could be used in process mining.
OrbEEt Project Introduction <Location>, <Date> Presenter
edTPA: Task 1 Support Module
Task T6.2 Tertiary Buildings infrastructures installations
Task T6.2 Tertiary Buildings infrastructures installations
WP2 - INERTIA Distributed Multi-Agent Based Framework
WP3 INERTIA Local Control and Automation Hub
ITIL: Service Transition
User Profiling and Ambient UIs
WP3 Local Control and Automation Hub,
IOT – Firefighting Example
T1.3 Pilot Sites Survey and Audit,
Conclusions & Recommendations
By Wilmer Arellano Spring 2010
Task 2.5: Holistic Flexibility Models (M10 - M24)
WP4 - INERTIA Aggregators Monitoring, Management and Control Hub
WP3 INERTIA Local Control and Automation Hub
[WP1] T1.2 User and Business Requirements
[WP1] T1.2 User and Business Requirements
Seminar On Energy Audit Submitted To: Submitted By:
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
Engineering Design - A general approach.
T1.3 Pilot Sites Survey and Audit, Peeter Kool CNet Svenska AB
WP2 INERTIA Distributed Multi-Agent Based Framework
Dissemination Activities Report
WP3 - INERTIA Local Control and Automation Hub
Fundamentals of Information Systems, Sixth Edition
Simulation.
Project Management Status
Outline Introduction Standards Project General Idea
WP3 - INERTIA Local Control and Automation Hub
WP1 – Smart City Energy Assessment and User Requirements
Project Management Status
WP2 INERTIA Distributed Multi-Agent Based Framework
WP2 - INERTIA Distributed Multi-Agent Based Framework
WP1 - INERTIA Framework Requirements, Specifications and Architecture
WP3 Local Control and Automation Hub,
Work Package 3 Data Management
WP6 Pilot Set-up, Model Calibration and Assessment
OptiFrame WP1: Project Management
System Control based Renewable Energy Resources in Smart Grid Consumer
WP5 INERTIA Integration & Lab Testing
WP1 INERTIA Framework Requirements, Specifications and Architecture
Process Scheduling B.Ramamurthy 9/16/2018.
Process Scheduling B.Ramamurthy 11/18/2018.
Process Scheduling B.Ramamurthy 2/23/2019.
Process Scheduling B.Ramamurthy 2/23/2019.
Measurement and Prediction of Dynamic Density
Process Scheduling B.Ramamurthy 4/11/2019.
Process Scheduling B.Ramamurthy 4/7/2019.
Uniprocessor scheduling
DeltaV Neural - Expert In Expert mode, the user can select the training parameters, recommend you use the defaults for most applications.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

WP3 INERTIA Local Control and Automation Hub Task 3.4 Multi-Sensorial Activity Flow Detection & Modelling in controlled environments CERTH-ITI

Task Progress / Main Achievements Occupancy Extraction Multi-sensorial occupancy extraction algorithm based on Hidden Markov Model (HMM) Number of occupants as the HMM hidden state, estimated periodically Pre-Processing Component: Handles sensor events, prepares the input for the HMM, monitors time-related functions

Task Progress / Main Achievements Inputs: - Installed sensor events from monitored spaces - HMM model Output: Estimated occupancy per monitored space Publish an Occupancy_Change event if occupancy is changed in one space

Task Progress / Main Achievements Preliminary indicative results with simulated input data simulated sensor data for a small office 1 double BEAM sensor at the door 1 PIR (motion) sensor Observations BEAM count number (0-3) PIR activation (0,1)

Task Progress / Main Achievements Acoustic Sensor Tests Logging noise levels in kitchen Investigate correlation between noise level and occupants density occupancy detection (empty-occupied) is quite accurate Occupancy density extraction not so accurate Around 180th sec, people arrived for lunch (We observe intense variations in noise levels)

Task Progress / Main Achievements Integration of sensors using Arduino Pair of Pressure mats (binary input) at doors- to count occupants entering/leaving space Arduino Uno R3 with WiFi Shield for wireless data transmission Data collection and storing to DB [SensorID, DateTime, Value] Double-beam sensors integration in progress in a similar manner Double Beam Sensors Arduino Pressure Mats

Task Progress / Main Achievements Occupancy Prediction Investigation of alternative methods and mathematical models Prototype development extending functionalities and implementing additional algorithmic approaches based on the Semi-Markov Model Evaluation of the performance of the various algorithmic methods implemented so far using real occupancy data (2 weeks) from Kinect cameras collected from pilot sites Evaluation metrics: total NRMSE (general) and weighted NRMSE (more relevant to the INERTIA concept) Results so far show that INERTIA prediction in most cases is far better than historical average and respective Open Reference Models

Task Progress / Main Achievements Data test installations for data gathering Kinect Cameras Cameras have already been installed in CERTH premises (developers office, kitchen, rest area) to acquire more data for testing and evaluation purposes Data from Kinect cameras will be used in some cases as ground truth for the validation of the other occupancy extraction methods Combinations of occupancy sensors to be installed: Pressure mats / Double beam + PIR (available through the alarm system) Pressure mats / Double beam + PIR + Acoustic + CO2 PIR + Acoustic PIR + Acoustic + Electric appliances usage detection through smart plugs

Allocation of work among partners Interfacing with other components TUK: Initial discussions for interfacing with IAM Initial example services have been implemented for testing Define XSD schemas for all services needed CNet: Provide access to LinkSmart Define way to publish and subscribe to events Store real-time values (occupancy extraction, occupancy prediction??)

Critical issues towards Task’s completion Pending / foreseen issues Real-time occupancy extraction changes stored to LinkSmart Event Manager Other components will request current occupancy per space from LinkSmart (not IAM) LinkSmart will automatically store occupancy to IAM (to be used for historical purposes) Raw sensor events from a double beams sensor may be too fast to be logged with accurate time. Perhaps it is preferable to process single raw events at the lowest level (Arduino) and directly get the entry/exit event.

Critical issues towards Task’s completion Pending / foreseen issues Occupancy prediction Define prediction scenarios (e.g. normal operation, demand response) Will be produced by Occupancy Component automatically on a regular basis (e.g. per 1 to 15 minutes?) Will also be asked by the Holistic Flexibility Component and passed directly to it? Event for prediction change passed to Event Manager – actual data stored in LinkSmart or IAM? Exported XML will consist of occupancy prediction per space / zone for a few hours after current time (e.g. 2 hours) / whole remaining day / next day? values per minute

Deliverable D3.3 Deliverable D3.3 Ambient User Interfaces, User Behavioural Profiling and Activity Flow Framework Combined with T3.5 Table of Contents available Initial version available with inputs from HYPERTECH on “UI and User Profiling sections” CERTH will fully provide “Activity Flow Framework” section Planning: Intermediate version by end of August Peer review version by mid of September

Deliverable D3.3 TOC – Activity Flow Framework section 1. Occupancy Extraction Framework 1.1 Introduction 1.2 Analysis of available occupancy detection systems 1.3 Selection of optimal multi-sensor systems in the scope of INERTIA 1.3.1 Identification of different tertiary building rooms and zones 1.3.2 Methodology for testing different multi-sensor installations per identified rooms/zones 1.3.3 Prototype implementation for evaluation of different occupancy extraction algorithms 1.4 Analysis of CERTH pilot test results 1.5 Conclusions on best fitted business scenarios in the scope of INERTIA 2. Activity Flow Modelling and Occupancy Prediction Framework 2.1 Introduction 2.2 Available occupancy prediction methods 2.3 Selected methods and algorithmic approaches in the scope of INERTIA 2.3.1 Implementation of selected approaches 2.3.2 Incorporation of scheduling information/ Open Reference Models 2.4 Experimental results for framework evaluation 2.5 Conclusions 3. ANNEX: Sensor detailed description

Planning for next efforts Occupancy Extraction Sensors foreseen for pilot installation (i.e. PIR, Pressure mats, Double Beam Sensors, Acoustic, CO2 ) to be implemented, tested and fully supported be prototype Initial accuracy validation per sensor combination Improve algorithm’s sensor modelling methods based on results Initial progress on Individual Extraction using RFID Occupancy Prediction Incorporate scheduling information (typical and dynamic) Acquire more data from pilot premises (from Kinect cameras and other sensors) towards better assessment of the different approaches Use more specific and INERTIA oriented evaluation metrics Add individual prediction support (based on RFID extraction)