Current FRRS Language & Explanation of Posted Data

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Market Trials Update NATF June 1, 2010.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Distributed Generation Registration June 30, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
14 Minute Ramp Period Testing Workshop June 30, 2009.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Public 1 Future Ancillary Services Team (FAST) and Technical Advisory Committee (TAC) Workshop ERCOT Staff July 25, 2014.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
UFLS Survey Explanation
Market Trials Update NATF March 2,
TAC Report to the ERCOT Board
Appeal of PRS Rejection of NPRR 667
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
RTDF Overview of Data Analysis & Status of “Consesus Items”
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
Principles of Participation in Real-Time Co-optimization
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
Market Notice Regarding Off-line Units
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Current FRRS Language & Explanation of Posted Data ERCOT Operations Planning June 10th, 2016

ERCOT Nodal Protocol References Business Practice Manual References Agenda ERCOT Nodal Protocol References Business Practice Manual References

ERCOT Nodal Protocol References

ERCOT Nodal Protocol References From the ERCOT Nodal Protocols (link) 3.16 Standards for Determining Ancillary Service Quantities (8) The maximum MW amount of capacity from Resources providing FRRS-Up is limited to 65 MW. ERCOT may reduce this limit if it believes that this amount will have a negative impact on reliability or if this limit would require additional Regulation Service to be deployed. (9) The maximum MW amount of capacity from Resources providing FRRS-Down is limited to 35 MW. ERCOT may reduce this limit if it believes that this amount will have a negative impact on reliability or if this limit would require additional Regulation Service to be deployed.

ERCOT Nodal Protocol References 3.17.1 Regulation Service (1) Regulation Up (Reg-Up) Service is a service that provides capacity that can respond to signals from ERCOT within five seconds to respond to changes from scheduled system frequency. The amount of Reg-Up capacity is the amount of capacity available from a Resource that may be called on to change output as necessary to maintain proper system frequency. A Generation Resource providing Reg-Up must be able to increase energy output when deployed and decrease energy output when recalled. A Load Resource providing Reg-Up must be able to decrease Load when deployed and increase Load when recalled. Fast-Responding Regulation Service Up (FRRS-Up) is a subset of Reg-Up Service in which the participating Resource provides Reg-Up capacity to ERCOT within 60 cycles of either its receipt of an ERCOT Dispatch Instruction or the detection of a trigger frequency independent of an ERCOT Dispatch Instruction. ERCOT dispatches Reg-Up by a Load Frequency Control (LFC) signal. The LFC signal for FRRS-Up is separate from the LFC signal for other Reg-Up. continued…

ERCOT Nodal Protocol References (2) Regulation Down (Reg-Down) Service is a service that provides capacity that can respond to signals from ERCOT within five seconds to respond to changes from scheduled system frequency. The amount of Reg-Down capacity is the amount of capacity available from a Resource that may be called on to change output as necessary to maintain proper system frequency. A Generation Resource providing Reg-Down must be able to decrease energy output when deployed and increase energy output when recalled. A Load Resource providing Reg-Down must be able to increase Load when deployed and decrease Load when recalled. Fast- Responding Regulation Service Down (FRRS-Down) is a subset of Reg-Down Service in which a participating Resource provides Reg-Down capacity to ERCOT within 60 cycles of either its receipt of an ERCOT Dispatch Instruction or the detection of a trigger frequency independent of an ERCOT Dispatch Instruction. ERCOT dispatches Reg-Down by an LFC signal. The LFC signal for FRRS-Down is separate from the LFC signal for other Reg-Down.

ERCOT Nodal Protocol References 6.5.5.2 Operational Data Requirements (2)(q) Reg-Up and Reg-Down Services participation factors represent how a QSE is planning to deploy the Ancillary Service energy on a percentage basis to specific qualified Resource(s). The Reg-Up and Reg-Down Services participation factors for a Resource providing Fast Responding Regulation Up Service (FRRS-Up) or Fast Responding Regulation Down Service (FRRS-Down) shall be zero; and

ERCOT Nodal Protocol References 8.1.1.2.1.1 Regulation Service Qualification (6) A QSE may also qualify a Resource to provide Fast Responding Regulation Up Service (FRRS-Up), Fast Responding Regulation Down Service (FRRS-Down), or both. In addition to the test criteria described in paragraph (5) above, ERCOT shall verify the following capabilities through testing: (a) The Resource will be required to demonstrate that it can deploy within 60 cycles of either (i) receipt of a deployment signal from ERCOT, or (ii) a deviation of frequency in excess of +/-0.09 Hz from 60 Hz. (b) Upon deployment, the Resource will be required to demonstrate that it can sustain the deployment for a minimum of eight minutes at a minimum level of 95% and a maximum level of 110% of the proposed maximum capacity obligation. (c) ERCOT shall use the Resource’s high-resolution recorded frequency and MW output data to determine whether the Resource met its performance obligations during the test. (d) On successful demonstration of the above test criteria, ERCOT shall qualify that the Resource is capable of providing FRRS and shall provide a copy of the certificate to the QSE and the Resource. (e) A QSE representing a Resource qualified to provide FRRS shall not offer to provide more FRRS than the maximum capacity obligation that the Resource is qualified to provide, as shown in the certificate provided to the QSE and the Resource.

Business Practice Manual References ERCOT and QSE Operations Practices During the Operating Hour

Business Practice Manual References From ERCOT and QSE Operations Practices During the Operating Hour; Section 3.5 Regulation Ancillary Service (link) Resources providing Fast-Responding Regulation Service (FRRS-Up and FRRS-Down) are dispatched by the ERCOT Load Frequency Control (LFC) system, and Resource specific instructions are sent to Resources with FRRS responsibility over the ERCOT WAN via ICCP. The ERCOT LFC determines the required amount of Regulation control to each Resource carrying FRRS based on the Responsibility amount telemetered by the Resource. The FRRS-Up and FRRS-Down instructions are NOT based on participation factors, and the participation factor for a Resource with FRRS-Up and FRRS-Down should be zero. Responsibilities for FRRS-Up and FRRS-Down are separate. Only Resources qualified to provide FRRS are allowed to telemeter an FRRS Responsibility. FRRS energy from a Generation Resource is always provided to the ERCOT System as price taker energy. This means that the portion of the Generation Resource’s EOC corresponding to the capacity reserved for Regulation Service is never available to SCED for economic dispatch. continued…

Business Practice Manual References ERCOT will deploy FRRS Resources according to the following deployment logic: Deployment by Dispatch Instruction: ERCOT may deploy FRRS Resources for up to two minutes when frequency reaches a deviation of more than +/- .03 Hz from the 60 Hz nominal system frequency. If the frequency deviation increases to more than +/- .05 Hz within the same frequency excursion (a single excursion is deemed to end when frequency deviation from 60 Hz decreases to +/- .01 Hz or less at any point and does not increase beyond .01Hz in the same direction of deviation within 12 seconds of reaching +/- .01 Hz, or when frequency deviation exceeds +/- .01 Hz in the direction opposite the excursion for which FRRS had been deployed), then ERCOT may require deployment for an additional two minutes. If frequency deviation further increases to more than +/- .09 Hz within the same frequency excursion, ERCOT may require deployment for an additional two minutes. If the deployment obligation is extended due to a frequency excursion reaching a greater frequency deviation threshold, any deployment time remaining under the previous threshold will not be added to the deployment. For purposes of FRRS deployed by Dispatch Instruction, ERCOT will not require additional deployment if frequency deviation decreases to a lower threshold before returning to a threshold already reached during the same deployment. continued…

Business Practice Manual References Deployment by Trigger Frequency: It is expected that each Resource with an FRRS Responsibility deploy 100% of its FRRS Responsibility within 60 cycles of a frequency deviation of more than +/- .09 Hz from the 60 Hz nominal system frequency. LFC will issue an Instruction, but this will be used only for the purpose of determining when to terminate the deployment. Each Resource shall remain deployed until recalled by ERCOT. Termination of Deployment: ERCOT shall initiate termination of any deployment whenever frequency deviation is equal to or less than +/- .01 Hz for more than 12 continuous seconds, whenever frequency deviation exceeds +/- .01 Hz in the direction opposite the excursion for which FRRS was previously deployed, or until the maximum deployment time (as described above) has been reached. In all cases, ERCOT will release Resources from deployment through a Dispatch Instruction in 3 steps. In each step, ERCOT will release an additional 1/3 of the originally obligated capacity for each Resource by sending a deployment instruction reflecting the reduced obligation. Each step will follow the previous step by no fewer than 12 seconds. continued…

Business Practice Manual References Subsequent Deployment: ERCOT may initiate a new deployment at any time following the complete recall of FRRS, except that ERCOT will not initiate a new deployment during any single frequency excursion for which FRRS has previously been deployed. However, FRRS Resources must automatically re-deploy during a single excursion if frequency deviation begins to exceed +/- .09 Hz after recall of a preceding deployment.