Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF

Slides:



Advertisements
Similar presentations
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
FSO Installation Free Space Optics The Practical Aspect.
HFT Safety --PXL detector September 26, Dana Beavis.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman AUTOMATIC AIR- CONDITIONING SYSTEM OPERATION 63.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
High Sensitivity Smoke Detection
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
PAST STATE  The high intensity of the solar radiation through the roof increases the warming-up in the hall over 30 °C = 86 °F  The high internal temperature.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
S A Griffiths CM42 June 2015 Electrical & Control.
Update on the PSB Cooling and Ventilation Systems
Teleconf ACS – FREIA 28th March 2017
CC LLRF SM18 test plan and BA6 infrastructure
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Objective 6.02 part 2: Recognize components of construction
CBETA Technical Review
Automotive Heating And Air Conditioning
General wiring drawing /
Service channels between Tracker and PP1
Update of MVD services and requests
Beam
Dielectric Oil Installations
VELO-installation meeting CERN, January 17, 2006
General wiring drawing /
Product Presentation January 2010.
Budget specification EHN1 Extension: Infrastructure (WG2)
General wiring drawing /
352MHz Klystron Control for the 3MeV Linac test stand
SR1 cleanroom extension
EHN1 Neutrino Installation Plans
CEDAR Detector Ventilation System Review
WP02 PRR: Master Oscillator and RF Reference Distribution
ADAGIO.
TEC assembly and commissioning at Lyon
STUB configuration Mats Pålsson
Door Heat Exchanger: Specification
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
Polarized 3He target installation
General wiring drawing /
Presentation transcript:

Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting LHC cage. Outside Reinforcements on the roof Honeycomb for air intake Honeycomb for air exhaust Tube for fire detection Plate for fire detection Feedtrough for coax cables Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Inside Honeycomb for air intake and exhaust Metallic plates bolted together with copper joints Coax entry via simple feed through The LHC Faraday Cage during assembly Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Size J.P. Billon-Grand Size 30700 x 3800 x 3000 (tolerances -100 +0) 40 racks 3 doors (900 x 2000 min) 16 patch panels for coax and fiber entry Check overall sizes Action: J.P. Billon-Grand, D. Stellfeld Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Cooling Yannic Body Position honeycombs Action: J.P. Billon-Grand, D. Stellfeld, Y. Body 4 diffusers 4 x 200x600 honeycomb for inlets 2 x 600x600 honeycomb for recycled air 3 x 600x600 honeycomb for extraction in the hall (motorized hoods) Temp set at 22 deg. Alarm at 25 deg. Mains off at 30 deg. Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Signal entry 16 patch panels, 3 models All located in the side facing klystrons Max size: 1100 x 400 including bolts Must not extend higher than 450 mm above concrete floor (being discussed with D. Parchet) Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Powering N .Dos Santos. See edms 1003296, June 2009 Pre-etude de l’installation et recommendation de materiel electrique pour la Cage de Faraday 2 circuits Tri-phase UPS Racks plus mains outlets 400 V/100 A (three phases plus neutral with independent ground line, TN-S network configuration before and after filter) Needed power: 30 kW (conservative) Circuit breaker piloted from temperature sensor Responsibility of contractant ends at the electric cabinet (AJFC) Mono-Phase unprotected Light only. 230V/20A Fluorescent tubes plus spots Needed power: 4 kW All under the responsibility of contractant Cable entry on the roof ? Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Inside Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Miscellaneous Fire detection: Aspiration Smoke Detection units on the outside (how many? Located where?), type SecuriRAS . Duct for aspiration pipe, 30 mm inner diam min (check). Foresee attachment plates on the outside of cage. Roof: shall support the weight of 2 persons plus tools (300 kg) to ease installation of the AC system Performances: 80 dB attenuation min at 352 MHz and 1 GHz How many aspiration ducts and where ? Action: J.P. Billon-Grand, D. Stellfeld, ? Julyl 26, 2010 Linac 4 coordination meeting

Linac 4 coordination meeting Calendar MS-3699 completed: 8 firms selected from D, CH, F, NL, UK and Finland Final drawing of the cage with all details. During Aug. (J.P. Billon-Grand, D. Stellfeld) Prepare IT-3699. August. Lazlo Abel (purchase), D. Stellfeld and P. Baudrenghien (Technical) 500 kCHF estimate + competitive tender -> no need for Finance Committee Circulate IT document around Linac4 management. Aug. Who? Send IT begin Sept Installation planned end March-begin April 2011 4 weeks installation Detailed drawing with position of posts, honeycombs, mains entry, smoke detector ducts,… Action: J.P. Billon-Grand, D. Stellfeld Is the metallic platform installed before or after the cage? Draft of IT-3699 in my public (user baudre) Julyl 26, 2010 Linac 4 coordination meeting