An-Najah National University Faculty of Engineering Civil Engineering Department
Analysis of El-jaroshia WaterDistribution Network-Tulkarm/Palestine
Submitted to: Dr.Amaal hudhud
Prepared by: Essam Salamah Jamal Sosa
Introduction To The Project Chapter one Introduction To The Project
*Definition of water. *The source divide into on ground(surface water) and underground (ground water). *The volume of water in the world and its distribution. *Water in Palestine. *The effect of the Israel occupation on the water in Palestine.
*Water general problems Water resource in Palestine *
Chapter Two: Methodology
*The aim of the project. *The main task of the project.
Chapter three: Study Area
General discription of the study area. Meteorology : 1. climate. 2 *General discription of the study area. *Meteorology : 1.climate. 2.tempreture. 3.humidity. 4.rainfall.
Chapter four: EPANET MODEL
What is epanet. Network components: 1. pipes. 2. pumps. 3. nodes. 4 *What is epanet . *Network components: 1.pipes. 2.pumps. 3.nodes. 4.valves. *Population. *Water consumption.
*Water demand. *Minor losses.
Chapter five: Existing Water Supply Network
Description of the existing water supply network *Description of the existing water supply network. *Water network problem evaluation: 1.qunntity evaluation. 2.quality evaluation. Steps of analyzing network: 1.meeting with doctor and decide what area we want to study.
2.go to the municipal of tulkarm (water department) and getting the plan of al-jaroshia AutoCAD and we obtained a contour map . 3.we go to statistics department and have some information about al-jaroshia as population and we connect with some friends in al-jaroshia to know more details.
After that we start the work in these steps: 1 *After that we start the work in these steps: 1.We merge the contour map with AutoCAD map to know the elevation of all nodes. 2.Dr.ammal advise us to use DFX program. 3.We create excel sheet and put all information and calculation of network as you see in the excel sheet .
4.We began to work in Epanet by insert all information on nodes as elevations and demands and adjust the length of pipes and diameter. 5.Finally, we did run for Epanet and had this information as you will see in appendix.
Chapter six : Result and Conclusion
Refernce -Tulkarm municipality(Eng:basel jarar,Eng:khaled abu saafya) -Statistics department. -Internet site: WWW.ARIG.NET WWW.PALSEEK.COM -Previous projects -Tulkarm agriculture department