CONS and HL-LHC day Analysis of needs from BE-CO

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Natick Public Schools Technology Update January 14, 2008 Dennis Roche, CISA Director of Technology.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
CERN IT Department CH-1211 Genève 23 Switzerland t Communication Services Projects & Services During LS2 F. Chapron IT/CS 29 th and 30 th.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
CLIC Controls – for the CDR Mick Draper Accelerator Control group, CERN.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 CERN IT Department CH-1211 Genève 23 Switzerland t Risk of network incident during the last LHC run CERN, 10 January 2013
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
V4.
BE-CO YETS 2015/2016 Planned BE-CO tasks during the YETS 2015/2016
CONS and HL-LHC day Analysis of needs from TE-EPC
SMR 21/09/2017 P. Fessia.
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
Update on the Critical Path of the PS Booster Schedule for the EYETS
EYETS Works EN-EL [ FC excluded ]
Status and Plans for InCA
Brief Status SPS Prototype PSB Prototype Installed in LS1
East Hall under construction
LIU Wire Scanner Milestones June 2017
Injector De-cabling Project
CV PVSS project architecture
AD consolidation activities in LS2
EC Activities Status for the LIU
AWAKE proposals for BE/BI
the high-voltage network of CERN ToMORROW
LV Safe Powering from UPS to Clients
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
Installation Plan Checklist
HL Consolidation Day Analysis of needs from BE-ICS
Overview & baseline of LS2 and roadmap for CRG
LIU Wire Scanner Series Costs
Public Employees Retirement Association Infrastructure Upgrade
Public Employees Retirement Association Infrastructure Upgrade
Department of Licensing HP 3000 Replatforming Project Closeout Report
Customer Overview Pack – July 2018
Customer Overview Pack – July 2018
Experimental Areas – LS2 planning
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Presentation transcript:

CONS and HL-LHC day Analysis of needs from BE-CO Mick Draper BE-CO 26/09/2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 1 LHC WorldFIP Repeater Consolidation 200 CONS 2017 2 WorldFIP Master boards 600 2017-2018 3 GMT distribution renovation (Repeaters + cabling) 2017-2019 4 OASIS 627 2016-2019 5 Video Distribution System 205 2016-2017 6 Accelerator Database Servers and Storage 380 2016-2018 P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 1 LHC WorldFIP Repeater Consolidation 200 CONS 2017 Replace “end-of-life” hardware WorldFIP used to control many critical systems, Power converters, QPS and Cryo. Should not depend on out-of-date h/w This activity has been completed; the repeaters were installed in (E)YETS and TS or during unplanned stops Should not depend on out-of-date h/w P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 2 WorldFIP Master boards 600 CONS 2017-2018 Replace unreliable old, unsupported Alsthom cards with new BE-CO ones Have seen recent problems on WorldFIP network with freezes of Kontron Front-End computers Impossible to diagnose Boards now designed and drivers developed. Production will start soon to be ready for installation in LS2 Should not depend on out-of-date h/w P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 3 GMT distribution renovation (Repeaters + cabling) 600 CONS 2017-2019 Remove obsolete electronics (>20 years old); no spares nor new boards Running a critical system based on obsolete hardware is a risk 90% PS, 5% SPS and 5% LHC Installed during YETS and then finish in LS2 Should not depend on out-of-date h/w P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 4 OASIS 627 CONS 2016-2019 This request has two parts: Renovation of the VXI multiplexors. This has been 80% completed Renovation of the OASIS triggering network using White Rabbit. This will be done in LS2. Should not depend on out-of-date h/w P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 5 Video Distribution System 205 CONS 2016-2017 This request has now been completed Video decoders/encoders installed throughout the complex. New screens installed in CCC and old screens recuperated for satellite control rooms. Should not depend on out-of-date h/w P. Fessia, 5 July 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget Funding (CONS/HL-CONS) % Budget to be allocated in the years 6 Accelerator Database Servers and Storage 380 CONS 2016-2018 This request is in progress: Increase storage for the accelerator databases supporting the ACCCON, ACCMEAS, ACCLOG and LASERDB databases Warranties extended until 31/03/2018. P. Fessia, 5 July 2017

New requests in view of HL-LHC installation (to meet HL-LHC goals) P. Fessia, 5 July 2017

New requests for conversion of LHC into HL-LHC Item n. Description Budget request Budget to be allocated in years (from-to) Priority (1-3) 1 top 3 low 1 Renovation of Technical Network Routers 2.3MCHF 2019-2020 P. Fessia, 5 July 2017

ITEM: TN Router renovation Rational of the request Total Budget request 2.3 MCHF + 1 FSU (80kCHF) Budget to be allocated in years 2019-2020, Procurement starts in 2019 and installation before the end of LS2 in 2020. Material budget request No personnel request. Consequences of suppression of request on HL performance: Risk of network downtime. Consequences of delay of request to LS4 or later. Critical equipment not under warranty. Would depend on old “retired” equipment for spares. P. Fessia, 5 July 2017

TN Router renovation This comes from the network experts in the IT Department. They point out that the Technical Network (TN) Routers have already reached their "end of sale" in 2015 and by 2020 they will reach "End of support".  In addition, the current setup is not tolerant to a router failure (no redundancy). So the proposal by IT is to replace the existing routers by state of the art network devices and modify the TN architecture (doubling up routers and installing extra fibres) to support router redundancy. While doubling the current bandwidth available to TN services. The cost of this consolidation is estimated at 2.3MCH for routers and fibres plus 1 FTE of FSU effort for the installation work. P. Fessia, 5 July 2017