Daniel Calcoen TE-MPE-EP

Slides:



Advertisements
Similar presentations
Adaptive Re-use of the Former Denmark Hospital. Tom Stevens H+H Architects.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
10 years of Entrepreneurship policy in the European Union Anders N. Hoffmann, Ph.D. Director of Enterpreneurship and Innovation.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
OECD and the Evolution of Entrepreneurship Policy Université du Québec à Trois-Rivières Anders Hoffmann, Ph.D. Creative Director, FORA Ministry of Economic.
SPS vacuum modification G.Vandoni SPS vacuum modification, 1.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Public Transportation Business Plan Workshop on Regional Planning June 14, 2005.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
I PSA SCIENTIA POTESTAS EST Knowledge is power Bilgi Güçtür (Sir Francis Bacon – 1597)
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Transport & Handling of Detectors TAN Workshop S. Prodon –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
OECD World Forum “Statistics, Knowledge and Policy”, Palermo, November
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Extraction and beamline progress B.Goddard TE/ABT.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
ELENA installation progress F. Butin / ELENA collaboration.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Report Technical Director Storage-Ring-Installation Completed
The Steering Board for MPE projects and its activities
Cabling for LHCb Upgrade
Upgrade of the DYPB racks : the Organization and the Logistics
TE-MSC activities in SPS during LS2
Equipment simplified model SMR UR safety
TE-MPE LS1 review Vision from EN-EL(CF)
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Looking back on 2014 and Perspectives for the MPE Group in 2015
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
M.Jonker CTC MPO-WG status
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
ELENA Technical Coordination
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
SPS activities during LS2 TE-EPC (Power Converter Group)
Powering from short circuit tests up to nominal
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
The 11T cryo-assembly: summary of design and integration aspects
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
Magnet electrical and hydraulic (dis)connections for coating
مديريت كارورزي پزشكي اجتماعي.
Hopewell Valley Regional School District
DS Collimators TE-MSC-CI
HL-LHC - WP15 modifications Coffrets Prise C4L8
Radiation Working Group RADWG
Presentation transcript:

Daniel Calcoen TE-MPE-EP DYPQ Upgrade Daniel Calcoen TE-MPE-EP Knowing is not enough, you must apply; willing is not enough, you must do. Es ist nicht genug, zu wissen, man muß auch anwenden; es ist nicht genug, zu wollen, man muß auch tun. Johann Wolfgang von Goethe July 07 2016

Outline Where the information is … What is DYPQ … DYPQ Upgrade Project … Conclusion July 07 2016 1 of 173

Where the information is … July 07 2016 2 of 172

Where the information is … July 07 2016 3 of 151

Where the information is … July 07 2016 4 of 113

Where the information is … July 07 2016 5 of 97

Where the information is … July 07 2016 6 of 73

Where the information is … July 07 2016 7 of 69

Where the information is … July 07 2016 8 of 61

What is DYPQ… July 07 2016 9 of 52

What is DYPQ… the name July 07 2016 10 of 51

What is DYPQ… the name July 07 2016 11 of 50

DYPQ Upgrade Project In order to maintain and improve the dependability of protection for the LHC Main Quadrupole Magnets, the TE-MPE group proposes to remove 392 DYPQ racks from the LHC tunnel, do an upgrade of their functionality, re- and install them back in the machine (+10 fully prepared spares). A lot of people is involved! We count on you! July 07 2016 12 of 48

Time line DYPQ Upgrade Q 1 2 3 4 L o n g S h u t d w ( ) 6 7 8 9 6 7 8 9 test on LHC (M4) tunnel test (M9) tunnel, move out (M6) interface (M1) review (M3) reception of last part (M5) IST/HWC (M10) workshop (M7) protoype (M2) tunnel, move in (M8) DYPQ Upgrade July 07 2016 13 of 47

DYPQ Upgrade Project What this specific project do NOT do several new elements : cables, DQLPU TYPE B, DQHDS, DQLIM, DQLPR (projects in hands of Jens and Joaquim) overall budget (in hands of Bruno) July 07 2016 14 of 36

DYPQ Upgrade Project The challenges of this specific project are: documentation (procedures, interfaces, contracts) July 07 2016 15 of 33

DYPQ Upgrade Project The challenges of this specific project are: coordination and logistics (space for storage and workshop, transport, radioprotection, LS2 program) July 07 2016 16 of 31

DYPQ Upgrade Project The challenges of this specific project are: workshop activities July 07 2016 17 of 25

DYPQ Upgrade Project The challenge of this specific project are: manpower and LHC tunnel activities (removal, reconnection) July 07 2016 18 of 20

Conclusion Now you start to know what all this DYPQ thing is about DYPQ Upgrade Program DYPQ Upgrade Project DYPQ-EP Project DYPQ-EE Project July 07 2016 19 of 19