Roadmap for ARIES APEC Frank Zimmermann, Giuliano Franchetti

Slides:



Advertisements
Similar presentations
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
Advertisements

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 XBEAM Steering Meeting.
European Network for Novel Accelerators (EuroNNAc2): WP7
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Johannes Gutleber CERN Directorate of Accelerators & Technology September 22, 2015 H2020 EUCard3 Reliability & Availability Task RAMS Training Topic.
EXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5 Frank Zimmermann EuCARD-2 Kick-Off Meeting CERN13 June 2013 many thanks to Giuliano Franchetti,
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
Introdcution to Workpackage/Activity Reflection D. Schulte.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
‘Toward TIARA’ Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
What is ATTRACT? A proposal has been made to the European Commission (EC) for a dedicated EC-funded program to develop new (ionizing) radiation sensor.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
WG2: Beam Dynamics, Optics and Instrumentation – Summary
Kick Off Meeting Largs, Scotland
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
FCC-ee Interaction Region design
ICE SECTION The coolest place to be! Elias Métral
New Materials for Extreme Thermal Management – PowerMat: Task 17.2
Access to material testing facilities (WP10)
Updating the Regulation for the JINR Programme Advisory Committees
The European Strategy for Particle Physics
eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5
Kickoff close-out Joerg Jaeckel, Mike Lamont, Claude Vallée.
European Network for Novel Accelerators (EuroNNAc2): WP7
Accelerator Research and Innovation for European Science and Society
Materials for extreme thermal management (PowerMat)
Beam Dynamics meets Vacuum, Collimations, and Surfaces
EDM kick-off meeting Introduction
Energy calibration issues for FCC-ee I. Koop, BINP, Novosibirsk
Accelerator Reliability Information System
XBEAM Strategy Workshop
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Future Collider Projects at CERN
nuSTORM and the Physics Beyond Colliders workshop
Beam Pipe Meeting Introduction
ILC/CLIC e+ generation working group
Project Coordination Group (PCG) for the implementation of the MSFD
eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5
EuCARD-2 WP5 XBEAM & WP1 EuCAN
CLIC damping rings working plan towards the CDR
A High Intensity Neutrino Oscillation Facility in Europe
High Energy High Intensity Hadron Beams
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Presentation transcript:

Roadmap for ARIES APEC Frank Zimmermann, Giuliano Franchetti Col.legi Major Rector Peset, Valencia

Accelerator Performance and Concepts APEC WP 6 Network-Activity

Description The APEC network comprises 5 scientific tasks, addressing both presently important as well as far-future topics, with an emphasis on beam quality and performance control.. The tasks relate to Beam Quality in Hadron Storage Rings and Synchrotrons, with particular importance for FAIR, the HL-LHC upgrade, and FCC-hh; Reliability and Availability of Particle Accelerators, in numerous fields of application; Improved beam stabilization, covering impedance models, impedance reduction, electron-cloud mitigation, and feedback systems; Beam Quality Control in Linacs and Energy-Recovery Linacs, addressing novel aspects of multi-turn systems in view of MESA, LHeC and FCC; Far-future concepts and their “feasibility”, including crystal applications, photon colliders, and gravitational waves in accelerators, and the delivery of a final white list of ranked options. APEC is the successor of the earlier networking activities EuCARD-2 XBEAM, EuCARD- AccNet, and CARE-HHH. It is building on the foundations laid in the past with a reoriented and forward looking scope.

Impact APEC will connect separate communities and projects confronting similar challenges (for example, FAIR and the LHC in task 2; ESS, LHC, light sources and medical accelerators in task 3; MESA, LHeC, ALICE, TU Darmstadt, and Berlin PRO in task 5) so as to foster the exchange of ideas, joint progress and the development of synergies. APEC aims at improving the performance of the next generation of accelerators and colliders, at advancing the design of the “next next” generation of accelerators, and at investigating and ranking options for the long- term future. APEC will provide important input to the next update of the European Strategy for Particle Physics expected in 2019.

Task 6.1. Coordination and communication - Coordination of network tasks, interface with other work packages - Dissemination of network results through public presentations and articles - Monitoring task progress, contractual compliance and use of resources Task 6.6: Far Future Concepts & Feasibility - Analysis of the potential of crystals for charged-particle bending or particle acceleration - Development of advanced photon colliders, including gamma-gamma and photon-nucleon colliders - Assessment of advanced muon-collider concepts without ionization cooling - Assessment of the potential use of large storage rings for gravitational wave detection or generation - Assessing and ranking a basket of future concepts with regard to “future feasibility” and physics cases - White list of ranked future options Task 6.2. Beam Quality Control in Hadron Storage Rings and Synchrotrons - Compilation and classification of processes causing performance degradation - Ranking of the identified mechanisms according to their relative importance - Identification and prioritization of mitigation approaches - Interfacing with Technology JRAs (electron-lenses, thin films, etc.) Task 6.3. Reliability and Availability of Particle Accelerators - Establish standard body of RAMS knowledge for particle accelerator application - Compile and rank existing RAMS standards, methods and practices in major laboratories - Analysis of optimal RAMS characteristics for particle accelerator systems - Spreading the identified best RAMS practices in order to introduce a common baseline - Assess the feasibility of an Open Data Infrastructure for accelerator reliability Task 6.5. Beam Quality Control in Linacs and Energy Recovery Linacs - Expand synergies between proposed future ERL projects and operating or soon-to-be-commissioned linacs/ recirculating linacs and ERLs in Europe - Establish a parameter database for the various facilities - Examine innovative and alternative ERL approaches - Work out synergies between linac developers and source developers for optimum beam quality - Identify outstanding open questions and develop prioritized R&D guidelines Task 6.4. Improved Beam Stabilization - Review existing strategies & methods for beam-impedance assessments and impedance models - Propose and evaluate novel methods to reduce accelerator impedance - Identify or develop strategies for electron-cloud mitigation at future accelerators - Conceptual design of advanced beam feedback systems for future machines

Task 6.2. Beam Quality Control in Hadron Storage Rings and Synchrotrons (CERN, GSI) Within the framework of an initial workshop, the task will compile and classify the processes causing performance degradation in past, existing and planned facilities (LHC, SPS, SIS18, SIS100, RHIC, Tevatron). The identified mechanisms will be ranked according to their relative importance for future machines (HL-LHC, FAIR, FCC-hh). At the first workshop also a European working group with representatives from several institutions will be formed to steer the activities. In later workshops this working group will identify and prioritize the mitigation approaches. Some of these events will be jointly organized with some of the technology JRAs, e.g. to assess measures like electron-lenses, thin-film coatings, etc. - Compilation and classification of processes causing performance degradation - Ranking of the identified mechanisms according to their relative importance - Identification and prioritization of mitigation approaches - Interfacing with Technology JRAs (electron-lenses, thin films, etc.)

Kick-off workshop Following workshop/meetings Processes responsible Of beam degradation Space charge Beam-beam Optics EU-working group Joint event with JRAs IBS Resonances …..

13/2/2017 G. Franchetti

The PS Nominal tune in “resonance free” region Tune spread necktie from space charge extends by ~0.30 in the vertical plane for LHC beams Spread fits tightly between integer resonance and 6.25 structure resonance

HIRFL

Task 6.3. Reliability and Availability of Particle Accelerators (CERN, HIT) Highly reliable operation becomes ever more critical for future energy-frontier machines as well as many applications (e.g. accelerator-driven systems, hadron therapy). Through workshops and expert discussions the network will at first compile Reliability, Availability, Maintainability, Serviceability (RAMS) methods and practices at major and representative particle-accelerator facilities, create an inventory, and apply some ranking. Further analysis will then allow defining an optimal RAMS characteristics for particle accelerator systems. The identified best RAMS practices will be communicated to the partner institutes as well as to the entire accelerator community in order to introduce a common RAMS baseline. The feasibility of an Open Data Infrastructure for accelerator reliability will be assessed through topical workshops and expert exchanges. - Establish standard body of RAMS knowledge for particle accelerator application - Compile and rank existing RAMS standards, methods and practices in major laboratories - Analysis of optimal RAMS characteristics for particle accelerator systems - Spreading the identified best RAMS practices in order to introduce a common baseline - Assess the feasibility of an Open Data Infrastructure for accelerator reliability

Modelling Concept Accelerator Complex Phase dependent failures Year schedule Year schedule Machine studies Physics production Technical stop Cycle Cycle Accelerator Complex Modelling Concept Phase dependent failures rates and repairs A. Apollonio

Task sub-steps Difficulty Requirement Establish standard body of RAMS knowledge for particle accelerator application 10 global Compile and rank existing RAMS standards, methods and practices in major laboratories Analysis of optimal RAMS characteristics for particle accelerator systems Spreading the identified best RAMS practices in order to introduce a common baseline 11 Global (reputation) Assess the feasibility of an Open Data Infrastructure for accelerator reliability 9 Interdisciplinary

Task 6.4. Improved Beam Stabilization (INFN) Charged particle beams can become unstable due to an electro-magnetic interaction of the beam with vacuum-chamber resistivity and discontinuities, characterized in terms of machine impedance, or due to an interaction with an electron cloud building up inside the vacuum chamber. This networking task will compile and review the existing strategies and methods for beam-impedance assessments and impedance models. Through expert discussions and with the help of a dedicated post-doc student, it will review and propose novel methods to reduce accelerator impedance, such as special coatings. The task will also identify or develop strategies for electron-cloud mitigation at future accelerators. If the impedance or electron cloud cannot fully be suppressed, feedback systems are needed for beam stability. The task will also work on a conceptual design of advanced beam feedback systems for future machines. A workshop gathering experts on the electromagnetic interaction between a particle beam and its surrounding environment will review the activities and progress in theory, simulations, bench and beam-based measurements. - Review existing strategies & methods for beam-impedance assessments and impedance models - Propose and evaluate novel methods to reduce accelerator impedance - Identify or develop strategies for electron-cloud mitigation at future accelerators - Conceptual design of advanced beam feedback systems for future machines

Existing methods For assessment of Beam impedance, and Impedance model Mitigation Strategies (coatings, etc.) Feedback systems

 Task 6.5. Beam Quality Control in Linacs and Energy Recovery Linacs (JGU) There have been no multi-pass energy recovery linacs in operation yet, while several are being proposed or under construction, especially in Europe (MESA, LHeC, BerlinPRO). This task will organize joint workshops involving future Energy Recovery Linacs (ERL) projects and operating or soon-to-be-commissioned linacs/recirculating linacs and ERLs in Europe in order to develop synergies. A parameter database for the various facilities will be compiled. Innovative and alternative ERL approaches, e.g. ones involving FFAG arcs, will be explored through a topical workshop. Synergies between linac developers and source developers for optimum beam quality will be worked out in one or two other major workshops of this task, possibly covering electron linacs as well as proton linacs. Based on the results of the networking events a set of prioritized R&D guidelines will be formulated. Task 6.5. Beam Quality Control in Linacs and Energy Recovery Linacs - Expand synergies between proposed future ERL projects and operating or soon-to-be-commissioned linacs/recirculating linacs and ERLs in Europe - Establish a parameter database for the various facilities - Examine innovative and alternative ERL approaches - Work out synergies between linac developers and source developers for optimum beam quality - Identify outstanding open questions and develop prioritized R&D guidelines

L Merminga, FEL 2005 F. Hug

CBETA @ Cornell (FFAG Demonstrator): bERLin Pro: L Merminga, FEL 2005 F. Hug

Task 6.6: Far Future Concepts & Feasibility (CERN, INFN) This task will organize or co-organize at least four specific workshops on (1) crystal applications for bending and acceleration, (2) advanced photon colliders, including gamma-gamma and photon-nucleon colliders, (3) advanced muon-collider concepts especially ones without ionization cooling, and (4) the potential use of large storage rings for gravitational wave detection or generation. This task is breaking new grounds. A dedicated PhD student will contribute exploratory studies on some of the aforementioned topics, including advanced muon collider concepts and gravitational waves at large hadron storage rings. A final workshop will help assessing and ranking a basket of future concepts with regard to “future feasibility” and physics cases, and prepare for the final deliverable, that is a white list of ranked future options. - Analysis of the potential of crystals for charged-particle bending or particle acceleration - Development of advanced photon colliders, including gamma-gamma and photon-nucleon colliders - Assessment of advanced muon-collider concepts without ionization cooling - Assessment of the potential use of large storage rings for gravitational wave detection or generation - Assessing and ranking a basket of future concepts with regard to “future feasibility” and physics cases - White list of ranked future options

Raffaele Tito D’Agnolo

Derivation of the longitudinal equations from first principles, is a Taks of 6.6

Crystal accelerators Acceleration in Continuous Focusing Channel V. Shiltsev Funneling with crystals

Deliverables D6.1 : Ranking of performance degrading mechanisms for hadron storage rings and synchrotrons [28]. Compilation and classification of the processes causing performance degradation in past, existing and planned facilities (Task 6.2) D6.2 : Report on optimal RAMS characteristics for particle accelerators [36]. Compilation of a list of Reliability, Availability, Maintainability and Serviceability (RAMS) methods and practices in different laboratories and definition of optimal RAMS characteristics for particle accelerator systems (Task 6.3) D6.3 : Summary of novel methods to reduce accelerator impedance [36]. Compilation and review of existing strategies and methods for beam-impedance assessments and impedance models (Task 6.4) D6.4 : Report on outstanding open questions and prioritized R&D guidelines for Energy Recovery Linacs [44]. Compilation of a parameter database for various facilities including innovative and alternative Energy Recovery Linacs (ERL) approaches. Formulation of guidelines for the design of ERLs (Task 6.5) D6.5 : White list of ranked far-future accelerator options [46]. Assessment and ranking of several future concepts with regard to “future feasibility” and physics cases, including a summary report (Task 6.6)

Welcome to