Presented by Li Gang Accelerator Control Group

Slides:



Advertisements
Similar presentations
V4 Status and Workshop Report CSS, DISCS, an V4 team.
Advertisements

Paul Chu FRIB Controls Group Leader (Acting) Service-Oriented Architecture for High-level Applications.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS V4 Support to Physics Application, Data Acquisition, and Data Analysis L. Dalesio, Gabriele Carcassi, Martin Richard.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
9-12 Oct 2000PCaPAC 2000, DESY Hamburg Epics to TINE translator Matthias Clausen, DESY Hamburg Phil Duval, DESY Hamburg Zoltan Kakucs, DESY Hamburg.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
14 Nov. 2000EPICS Workshop - Oak Ridge1 DESY SCADA Experience Matthias Clausen DESY/ MKS-2.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview Bob Dalesio, Control Group Leader 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLSII Physics Applications – Applying V4 The Control Group – presented by Bob Dalesio Taiwan EPICS Meeting, June 2011.
IRMIS 2 Overview Andrew Johnson Computer Scientist, AES Controls.
BROOKHAVEN SCIENCE ASSOCIATES High level applications and EPICS control GUOBAO SHEN NSLS-II, Control Group May 4 th, 2009.
MASAR Service Guobao Shen Photon Sciences Department Brookhaven National Laboratory EPICS Collaboration Workshop Oct 05, 2013.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
FAIR Accelerator Controls Strategy
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview Bob Dalesio, Control Group HLA Review for NSLS-II Project April
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
11 CLUSTERING AND AVAILABILITY Chapter 11. Chapter 11: CLUSTERING AND AVAILABILITY2 OVERVIEW  Describe the clustering capabilities of Microsoft Windows.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Development Plan V4 Team – presented by Bob Dalesio EPICS Meeting October 12, 2010.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
EPICS EPICS Collaboration Meeting Argonne June 2006 IOC Redundancy: Redundancy Monitor Task EPICS Meeting - Redundancy Argonne, June 16, 2006 Matthias.
Connecting LabVIEW to EPICS network
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Normative V4 Team – presented by Bob Dalesio EPICS Meeting October 7, 2011.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Development Plan V4 Team – presented by Bob Dalesio EPICS Meeting October 7, 2011.
MicroTCA Development and Status
PVSS an industrial tool for slow control
Operations Machine Simulator.
BaBar Transition: Computing/Monitoring
Accelerator control at iThemba LABS
Laboratorio per dottorandi 2017 Particle Accelerators Control System
PLC-based control systems at SOLEIL - ICALEPCS 2017
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
ATF/ATF2 Control System
The ILC Control Work Packages
Magnet Safety System for NA61/Shine
Physical Architecture Layer Design
University of Technology
EPICS Version 4 Abstract:
COntrol, Data Access and Communication System for ITER
EPICS: Experimental Physics and Industrial Control System
Operation of Target Safety System (TSS)
Commissioning the European XFEL cryogenic system and best practice
Channel Access Concepts
Presentation transcript:

Presented by Li Gang Accelerator Control Group CEPC-Control Presented by Li Gang Accelerator Control Group 2018/5/17

Survey of Control Software Redundant technology Overview Survey of Control Software Redundant technology Post mortem technology based on event timing system Prototype of MPS 2018/5/17

Overview: Challenges from CEPC Super Large Scale: around 53.6 km in circumference V∙S LHC  27-kilometre ring FECs and Devices: CEPC more V∙S LHC 2,000 FECs and 85,000 controlled devices  High reliability && high availability Overall faults analysis : Power supplies, cryogenics, injections, SRFs, vacuum ,etc=> protection strategies 2018/5/17

Overview: Requirement of control Overall information; Monitoring and recording; Fault diagnostics; Global && local controls; Automatic process control, feedback; Sequence control; Prevention of dangerous action Timing system Machine protection

Overview: Performance of control Reliability; Flexibility, scalability and maintainability,; Cost effective; Fast development; Ease of use (developers and users) Documentation/support 2018/5/17

Overview: control subsystem Center control system: data server, data archiver, etc Control network Timing system Machine Protection System Vacuum control system Temperature Monitoring system。 Post Mortem Power supply control system Video Monitoring system Others 2018/5/17

Survey of Control Software PVSS: CERN, 50 years, Commercial product from ETM company, Austria Some features • Human-machine interface (process visualization) • Devices described as data points (DP), device properties as data point elements (DPe) • Control device access • Alarm handling (display, filtering, etc.) • Archiving and trending , etc 2018/5/17

Survey of Control Software 2018/5/17

Survey of Control Software EPICS: 40years, more than 150 labs or companies,, Some features 2018/5/17

How does EPICS do ? Process Variables: Power Supply 04/05/13 How does EPICS do ? Channel Access Client Channel Access Client Channel Access Client Channel Access Client Channel Access Server Process Variables: Power Supply Computer Interface S1A:H1:CurrentAO S1:P1:x S1:P1:y S1:G1:vacuum Beam Position Monitor Computer Interface Vacuum Gauge Computer Interface Let’s take an example: Suppose you had a particle accelerator to control. Among many other things, 10

EPICS Version 4 Production HLA Client PVAccess/CAC MMLT Client Scripting HLA Client Control System Studio PVAccess / CAC Completed Early Development Being Extended PVAccess/CAC PVAccess/CAC Ethernet PVAccess PVAccess PVAccess PVAccess/CAC PVAccess/CAC PVAccess/CAC Middle Layer Servers Model Server Lattice Server Channel Finder Svr Multi-Channel Arrays Svr Save/Compare Restore Svr Magnet Conv, Response Matrix, Dispersion, etc…. Elegant/Tracy SQL SQL Serves orbit, magnets, any array of channels SQL RDB IRMIS IRMIS Distributed Front-Ends PVA Diagnostics CAS Power Supplies PVA CAS PVA RF CAS Vacuum PVA CAS PVA Utilities etc.., CAS Diag & PS PVA CAS Physical Device Physical Device Physical Device Physical Device Physical Device LS2 Simulation Supporting the next generation of scientific control systems.

Survey of Control Software TANGO: 15 institutes, European TANGO Controls is a software toolkit : for connecting things together + building control systems + integrating systems The TANGO community meetings take place each year alternately in one of the 15 institutes members of the TANGO consortium.  They group together all the members of the community with the developers. They present the last technical progress and agree on the development strategy and roadmap 2018/5/17

Survey of Control Software 2018/5/17

Survey of Control Software DOOCS: DESY, German,  European XFEL Distributed Object Oriented Control System 2018/5/17

Other Possibilities… 2018/5/17

Redundant technology A user facility with high demands for 99.8% efficiency The control system may not fail ● Possible scenarios: ⇒Cold stand by ( switching ‚on demand‘; i.e. for maintenance) ⇒ Hot stand by ( seamless switch of IOC‘s) Hardware maintenance Software maintenance Installing new system-/ application- Software 2018/5/17

Redundant technology 2018/5/17

Post mortem analysis based on event timing system Timing and Synchronization are very IMPORTANT everywhere. Global system. Possibility to integrate post mortem analysis into event timing system. Software infrastructures including database are under evaluation

Post mortem analysis based on event timing system Timing Master timing feedback Timing Distribution feedback feedback timing feedback timing timing Timing Receiver Timing Receiver Timing Receiver timing feedback timing feedback timing feedback Data Acquisition Data Acquisition Data Acquisition

Prototype of MPS Fast-MPS: Prevention of dangerous action Response time : < a few tens of microseconds  High availability: redundant hardware Predefined interfaces: relays, optical ports …

Prototype of MPS redundant hardware 2018/5/17

Fast-MPS (Main Board) UART Opt. transceivers/ RocketI/Os/6 Gb net Extended IOs/64 Lamp indicators/8 FPGA/XC6SLX 100T-3FGG900 CPU/ Loongson 2F VME P1/P2 VME J1/J2 22 22

经费预算 Prototype and development International academic exchange 0.75M 服务器4*3、前端设备23、仪器32(信号源、示波器) 电子学及配件8 International academic exchange 0.25M/5-6 persons(3Dr+4) 2018/5/17

参加人员 2018/5/17 编号 姓名 性别 职称 学位 单位名称 电话 电子邮件 身份证号码 每年工作时间(月) 是否光源 1 雷革 女 研究员 博士 高能所 leige@ihep.ac.cn 6 是 2 金大鹏 男 jindp@ihep.ac.cn  否 3 李刚 高工 硕士 li75gang@ihep.ac.cn 否 4 赵卓 zhaozhuo@ihep.ac.cn 5 徐广磊 xugl@ihep.ac.cn  3  是 刘智 学生 博士在读 liuz@ihep.ac.cn 10 7 乔予思 qiaoys@ihep.ac.cn 2018/5/17

Thank colleagues from control group and others from accelerator center Thank international control experts from other institutes 2018/5/17