Neutrino Projects 18-3-2016.

Slides:



Advertisements
Similar presentations
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
Advertisements

U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
LBNE Europe in LBNE Alfons Weber University of Oxford STFC/RAL.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
The meeting in Paris: The agenda has been built and optimized.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Greetings to Veljko from Fermilab December 9, 2010.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
European design study on Neutrinofacilities - Euronu within FP7.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
CERN Neutrino Platform 4 th April, 2014 FNAL M.Nessi.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
TTdF – EPS Conference Manchester (UK), July 2007 Neutrino hiererchy from atmospheric and beta beam neutrinos with high density magnetised detectors [1]
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
Long-Baseline Neutrino Facility LBNF LBNF Project C. J. Mossey, LBNF Project Director 49 th Annual Fermilab Users Meeting 16 June 2016.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
CERN Neutrino Platform 10 th January, 2014 ICFA, Neutrino European Meeting A.Ferrari, M.Nessi, P.Sala.
/18 N eutrino E xperiment with S pectrometer S i n E urope Search for sterile neutrinos at CERN G. Sirri INFN Bologna on behalf of the NESSiE Collaboration.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Accelerator R&D for Future Neutrino Projects
Future Trends in Nuclear Physics Computing Workshop
More results from the OPERA experiment
CERN Neutrino Project 26th November, 2013 M.Nessi.
News and brief overview of Beamline plans for the next few months
nuSTORM at Fermilab D Adey
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
John Womersley Super-B Workshop Oxford May 2011
Ways to industry participation in CLIC 24th October, 2017
CTF3 Collaboration Technical Meeting January 2008
What is ATTRACT? ATTRACT (breAkThrough innovaTion pRogrAmme for deteCtor / inrAstructure eCosysTem) A proposal from CERN to the European Commission (EC)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
nuSTORM and the Physics Beyond Colliders workshop
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
Future physics at nuSTORM
CNGS Project Overview Konrad Elsener.
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
SOLID Collaboration Meeting
Presentation transcript:

Neutrino Projects 18-3-2016

Mandate “Rapid progress in neutrino oscillation physics, with significant European involvement, has established a strong scientific case for a long-baseline neutrino programme exploring CP violation and the mass hierarchy in the neutrino sector. CERN should develop a neutrino program to pave the way for a substantial European role in future long-baseline experiments. Europe should explore the possibility of major participation in leading long-baseline neutrino projects in the US and Japan.”

Our interpretation no n beams at CERN ! n beams in the US and in Japan A structure at CERN to foster an active involvement of Europe and CERN in the US and Japanese new facilities  Neutrino Platform as a project at CERN

n future landscape (oscillation physics) Neutrino Platform at CERN SBN (short baseline) T2K LBNF/DUNE

n future landscape (oscillation physics) LAr technology Neutrino Platform at CERN SBN (short baseline) T2K LBNF/DUNE

n future landscape (oscillation physics) Neutrino Platform at CERN 6 Projects presented to the SPSC and approved: NP01: WA104, ICARUS as far detector for SBN NP02: WA105, demonstrator + engineering prototype for a double ph. TPC NP03: PLAFOND, an generic R&D framework NP04: ProtoDUNE, engineering prototype for a single phase TPC NP05: Baby Mind, a muon spectrometer for the WAGASCI experiment at T2K ArgonCube : a modular TPC R&D 2-3 in the pipeline SBN (short baseline) ~ 5-6 MCHF/ project (CERN) T2K LBNF/DUNE

n future landscape (oscillation physics) Neutrino Platform at CERN CERN, CIEMAT Madrid, ETH Zurich, Gran Sasso Science Institute, IFIC Valencia, IN2P3, including IPNL, LPNHE, LAPP, APC, OMEGA, INFN Bari, INFN Bologna, INFN Lecce, INFN LNF Frascati, INFN LNGS, INFN Milano, INFN Milano Bicocca, INFN Napoli, INFN Padova, INFN Pavia, INFN Roma, Institut de Fisica d’Altes Energies (IFAE) Barcelona, Institute College of London, IRFU CEA Saclay, Lancaster University, National Center for Nuclear Research Otwock, NTUA Athens, Ruder Boskovic Institute Zagreb, STFC Rutherford Appleton Laboratory, Università di Bari, Università di Bologna, Università di Padova, Università di Roma ‘La Sapienza’, Università di Salento , University of Bern, University of Cambridge, University of Geneva, University of Glasgow, University of Jyvaskyla, University of Liverpool, University of Manchester, University of Oulu, University of Oxford, University of Sheffield, University of Sofia, University of Sussex, University of Warwick, UST Cracow SBN (short baseline) T2K LBNF/DUNE European Institutions who are signing n Platform MOU addenda (today 49)

Large prototyping activities for LBNF/DUNE CERN provides Civil Engineering and Infrastructure, ….. investment for the future also for other applications

Single phase protoDUNE Single phase LAr TPC Operational in 2017, SPS calibration beams in 2018 Active volume ~ 7x7x6 m3

Double phase protoDUNE Double phase LAr TPC Operational in 2017, SPS calibration beams in 2018 Active volume 6x6x6 m3

Large prototyping activities for LBNF/DUNE To learn about: - Large cryostats of a new generation (LNG carrier technology) ~1000 tons LAr - Very pure cryogenics at the ppt level, large plants - New technologies for LAr Time Proportion Chamber technology (single phase, double phase) - Large data sets (similar to LHC-heavy Ions) - New photon detector technologies (large area SiPM arrays?), interesting for other applications (space, dark matter, telescopes,…) - Large size detector engineering integration - Automatic patter recognition (new in the community !) - Team/Collaboration building in the Neutrino Community At CERN ~ 300 Collaborators involved, ~100 from USA

Step by step (LAr TPCs) …. the large scale is a big and new challenge 4 x

LBNF infrastructure: Excavation and 5 caverns 4 cryostats LAr proximity cryogenics N2 external cryogenics US-DOE: Excavation and 5 caverns N2 external cryogenics International: 4 cryostats (1 funded) LAr proximity cryogenics

LBNF : LAr cryostat and cryogenics Proximity cryogenics mezzanine This is the list of the requirements that have an impact of the CF work. READ. Full list is available here. CERN design

The LBNF Beamline and its high intensity proton beam Facility designed to run at initial beam power of 1.2 MW and it is upgradeable to 2.4 MW Proton beam extracted from Fermilab’s Main Injector in the range of 60 – 120 GeV every 0.7 – 1.2 sec with pulse duration of 10 ms Not to scale 3D model of the primary proton beamline Protons per cycle: 1.2 MW era: 7.5x1013 2.4 MW era: (1.5-2.0)x1014 To SURF Embankment The beam lattice points to 79 conventional magnets: 25 dipoles, 21 quadrupoles, 23 correctors, 6 kickers, 3 Lambertsons and 1 C magnet MI-10 Beam size at target tunable between 1.0-4.0 mm

Possible International contributions Cryostats construction LAr cryogenics plants Beam components 2 Detectors equivalent (i.e. 1/2+1/2+1/2+1/2) Near detector design and construction Computing software infrastructure Physics simulation and data analysis Project management Strong overlap with EU-industry

LBNF/DUNE – Construction Summary

Unique opportunity to rebuild a strong European Neutrino community Immediate physics potential with the exploitation of the short baseline at FNAL and the T2K new near detector Major contribution to the infrastructure of LBNF (European consortium with CERN) Design and construction of new large detector prototypes Generic R&D on new detectors and data handling Participation in the construction, commissioning and physics exploitation of the new high intensity facility in the US and in Japan