SPS Winter stop Planning meeting (N06) 05/01/2011

Slides:



Advertisements
Similar presentations
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Advertisements

 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
CALENDAR YEAR PLAN JANUARY FEBRUARY MARCH APRIL MAY JUNE.
Magnet activities in SPS during EYETS
SPS Personnel Protection System Renovation Project
ALICE 5 o’clock meeting Wk 51.
Sophie Rogers School for Early Learning Closure Dates
Test beam check list Michael JECKEL EN-EA-EC.
Safety in the Neutrino Platform Hall
SPS LS1 Planning meeting (N019) 04/09/13
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
Injector De-cabling Project
Ethan & Fletcher’s Day Day of the week Time Date Day / Month / Year 12
LHC-TS3 Coordination meeting #3
SPS YETS 2015/2016 Planning meeting (No.14) 03/02/16
Installations, modifications, consolidation in 2005:
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the 45-year old PS magnets
SPS LS1 Planning meeting (No.34) 16/04/14
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
LHCb & EYETS
James Ridewood BE-OP-SPS
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
Alexander Herlert, CERN (PH-SME-IS)
BE-ICS work for SPS Safety Systems
Work Experience at ntc The Key Details.
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
13-block rotation schedule
Math Management Binder ©
PENISTONE SURGERY IN AN EMERGENCY CALL (01226)
Technical Stop #4 29th August - 2nd September 2011
MY FUNDAY.
DSC ChMC CSS update 11th December 2018
Emerald Coast Professionals Schedule
South Milford Pre-School Playgroup
System Restoration Coordinator Subcommittee Thursday February 28th
Experimental Areas – LS2 planning
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
No Warm-Up 5/19/17 Happy Friday!  We have 5 school days left this year! You can choose your seat today; if you move the seats around, please put them.
A. Herlert, CERN PH-SME-IS
Returning Speech Team Welcome to the Season!
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS Planning meeting for LS2 #16 Vacuum sectors situation
Monday, Mar. 26th 3rd , 4th, 5th, & 6th
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Equity Diversity & Inclusion Grant Midterm Project Status Report
Guidelines defined early Dec 2012
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
Powering and Safety day Underground access during powering tests
Commas in Dates WHERE DO THEY GO?!?.
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Presentation transcript:

SPS Winter stop Planning meeting (N06) 05/01/2011 David Mcfarlane SPS.Technical-Coordination@Cern.ch

Action items from last meeting Action item description Coordination Status Powering tests in TT60 Interlinked issue related to HIRADMAT planning. ONGOING. Awaiting dates from Christophe Mutin. Integration of the RAL patch panels in TA1 & TA2 David Hay is organising a coordination meeting in Jan 2011. ONGOING Lighting campaign dates for ECX4 & ECA4 to be scheduled CNGS planning & the availability of INEO required BHA4 crane maintenance Confirm dates and schedule SPS.Technical-Coordination@Cern.ch

SPS Key Dates Description Date End of Physics 6th December (18:00 Hrs) Access into BA7 7th December to 4th February Test of new CIS for MPS 7th and 8th December Access granted for TI2 & TI8 8th December Power cut for all of CERN at 7am followed by 2 days on interruptions 9th December Access to BA80/TDC2 From the 9th December (confirmation by RP) RP inspection of SPS 9th & 10th December Magnet patrol and High Voltage pulsing 13th & 14th December Access to BA2, BA3, BA4 & LSS6 15th December to 28th January Access BA1, BA5 & BA6 20th December to 28th January Xmas vacation 22nd December to 4th January (Inclusive) SPS.Technical-Coordination@Cern.ch

CV Water circuits (All water were cut on the 15th December) Area Date water can be available from BA1 21st January BA2 19th January ** BA3 Before Xmas BB3 BA4 12th January BA5 11th January** BA6 13th January** BA7 28th January TI2 TI8 ** These dates may be later due to magnets being changed in these areas. SPS.Technical-Coordination@Cern.ch

SPS Key Dates Description Date SPS closure (chain 1) 28th January (18:00 Hrs) SPS Ring Patrol & HV magnet test 31st January Startup tests for 2011 operation 1st to 7th February Test of new CIS for MPS BA7 closure 4th February Test DSO (chain 1) (Global system test ) 8th & 9th February Cold Checkout SPS - TT - TI 10th to 20th February SPS/TI2/TI8 start with beam 21st February SPS.Technical-Coordination@Cern.ch

Magnet change campaign Starting on Monday the 10th January, there will be a campaign to change 4 magnets in BA1 and 1 magnet in BA2. Magnets:- 10570, 10650, 12770, 13510, 20010 The magnets will be transported via BA3. During this week (week 2), Transport will have priority in BA3, BA2 and BA1. Starting on Monday the 17th January, there will be a campaign to change 1 magnet in BA5 and 1 magnet in BA6. Magnets:- 51510, 62510 The magnets will be transported via BA6. During this week (week 3), Transport will have priority in BA6 and BA5. The final magnet to be changed is in BA2. This will be start on Thursday the 20th January. (21810) This magnet has been left to last to allow radiation levels to drop. Access once again via BA3. During this day, Transport will have priority in BA3 and BA2. Details of these magnet changes are now in the planning. SPS.Technical-Coordination@Cern.ch

SPS.Technical-Coordination@Cern.ch

Planning (next 7 days) See planning SPS.Technical-Coordination@Cern.ch

Important information Make sure you have the correct safety equipment with you! Safety shoes Biocell Electronic dosimetre Helmet plus Light Access requests not required Useful Contact Numbers SPS Coordination Team David MCFARLANE- 164247 Franck BAIS - 165467 David HAY – 163317 Control Room SPS CCC – 77500 TI CCC – 72201 (to be used during the Xmas vacation) RP Christophe Tromel - 163199 Coordination Safety Emmanuel Paulat - 163870 SPS.Technical-Coordination@Cern.ch

SPS coordination website http://sps.web.cern.ch/SPS/ Next meeting Wednesday the 12th January 2011 Time: 14:00 Hrs Location:864-2-C17 SPS.Technical-Coordination@Cern.ch