Jaak Lippmaa HIP, Helsinki University

Slides:



Advertisements
Similar presentations
M. Ruspa - FP420 meeting, DESY 18/05/06 1 G4 simulation: where are we? Marta Ruspa on behalf of Alexander Zokhin FP420 Collaboration Meeting DESY 18 th.
Advertisements

ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Very Forward Detectors Workshop on beam position monitoring and detector alignment.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 MicroPot Prototype Work in Progress Jaak Lippmaa Helsinki Group, Helsinki Institute of Physics, University of Helsinki CERN, February, 2006.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
LHCb VErtex LOcator & Displaced Vertex Trigger
27-28 March, CERNFP420m Brainstorming on Mechanics1 FP420m DETECTOR MECHANICS Jaak Lippmaa HIP, Helsinki University Mikk Lippmaa ISSP, Tokyo University.
Difference between Roman Pots and VELO Very forward tracking is typically done using detectors located in Roman pots. They are far away from the interaction.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
19 April 2007J.Pater - FP420 Alignment1 FP420 Detect off-momentum protons at 420m from the interaction point, due to e.g. diffractive events in ATLAS/CMS.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
BL SAXS End Station (Small Angle X-ray Scattering)
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Gennaro Ruggiero CERN, PH Depart. Planar Edgeless Detectors for the TOTEM Experiment On the behalf of the TOTEM Collaboration
TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting.
Convergence in Proton Reconstruction Algorithm and final reference tests of Roman pots before installation in LHC Ayah Massoud Penn State University Supervisor:
Roman Pots and Microstations based on talk by Jaak Lippmaa Helsinki CERN 2005.
Mike AlbrowFP420 – May Timing and Pile-up Considerations 1 Pile-up in trigger and pile-up off-line (HLT) very different issues. Here I consider.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
Developing Radiation Hard Silicon for the Vertex Locator
BEAM LOSS MONITORING SYSTEM
Introduction Status before the 2009 run Results from the 2009 run
First data from TOTEM experiment at LHC
Four OTR Tasks.
Components for the Machine-Interface Regions
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Upgrade Strategy for the Experimental Vacuum Systems
BEAM LOSS MONITORING SYSTEM
Equipment of experiments directly interfering with the beam operation
Cryomodule Assembly Plan
Status of CMS-PPS timing detectors
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Breakout Session SC3 – Undulator
Presentation transcript:

Jaak Lippmaa HIP, Helsinki University Helsinki Scenario Jaak Lippmaa HIP, Helsinki University DESY fp420m meeting 17-19 May, 2006

Summary of open topics Types of detector inserts Detectors in secondary vacuum Preferably a thin window to reduce showering Alignment of detector stations to each other and the BPMs Detector station supports Detector cooling Detector retraction in emergencies DESY fp420m meeting 17-19 May, 2006

Design considerations Definitely go for perpendicular detector inserts with thin (200 μm or less) steel windows – minimum interference with beam shield – we need appropriate RF simulation Try to use window designs investigated and tested by TOTEM Roman Pots or the window proposed by Andrew Moving the other beam pipe away is really worth considering for secondary vacuum access to detectors Adapt TOTEM or ATLAS RP detector cooling solution for fp420 stations – we have similar thermal loads Radhard stepper motors should be picked from appropriate LHC hardware baseline design report Pneumatic or vacuum operated failsafe mechanism to eliminate beam dump requests from risk analysis matrix. Beam dump requirement remains in case beam hits detector Four separate stations provide redundancy DESY fp420m meeting 17-19 May, 2006

Alignment The problem is nothing is rigid and fixed if we want to achieve 10 μm positioning accuracy of detector blocks over the length of 10 m Perpendicular detector inserts have better geometry for alignment measurements – detector inserts can be calibrated separately from chambers Detector plane position co-ordinates needed for “garage” position and “data taking” position plus any variations during data taking – we would prefer optical dynamic position monitoring to ensure accurate tracks Detector positioning should rely on BPM data during Closed Orbit beam stage. Beam Loss Monitors should be monitored as well. Where are the BLM locations near 420 m??? “our” BPM cost is lower since we can use four warm “Button Feedthrough Pickups” mounted on a 6-way cross Laser alignment should provide monitoring in X,Y plane from the BPM location on the beampipe to determine relative positions of different detector blocks to each other and the BPM Accurate relative positions of assembled detector chambers can be measured by using pulsed wire and dummy pickup electrodes mounted in dummy detector windows together with optical calibration. Separately calibrated detector blocks can then be inserted after bakeout without compromising the optical position monitoring system DESY fp420m meeting 17-19 May, 2006

That’s all for now Simulation data is needed before new drawings can be made, especially the RF environment around the beam We may have solved the relative alignment/positioning problem, but further research is needed before demonstration. The system provides continuous monitoring of X,Y co-ordinates of all stations and the BPM with 3-5 micron accuracy over the 25 mm travel range Quartic needs a different chamber/window which means the last station is probably a hybrid SiQuartic station DESY fp420m meeting 17-19 May, 2006