ProtoDUNE – DSS Installation, Alignment and QA

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
How to center the top roller Current Situation The slider is not centered because the bottom slider was not placed at 6 o’clock ?!
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Manual Flo-tap Installation Instructions
Optical Manufacturing Solutions 1 Probe Assembly.
Click on this image to open the full PDF document.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Senior Design: Validation of Design December 15, 2008.
Installation. Indoor Unit Installation Typical Installation.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Planning for Proto-DUNE PD Installation and Cabling at CERN
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
Escalator Installation
MICE Partial Return Yoke Mechanical Design
INSTALLATION SEQUENCE
Endcap shielding senarios:
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
CPA Moment on the left is ~100*150kg/2.
TPC Support and Constraint TPC Support
Test box for ProtoDUNE SP – Integration Test
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
F&T Inc. OVERHEAD CRANE SAFETY.
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
SNS PPU Helium Vessel Design and Assembly
Neutron guide Shielding Concept
US-HiLumi – Shipping Post Assembly Status
Polarized 3He target installation
Presentation transcript:

ProtoDUNE – DSS Installation, Alignment and QA Dan Wenman ProtoDUNE Single Phase Installation Workshop April 19, 2017

Outline Installation Alignment QA Installation tools Beam Installation Driving the bridge beams DSS lateral constraint configurations Load Transfer Alignment Alignment of the bridge crane Alignment of the APA, CPA, EW QA Plans at PSL and Ash River Plans at CERN April 19, 2017 Dan Wenman | protoDUNE Installation

Nomenclature Coordinate System Top view of the DSS April 19, 2017 Dan Wenman | protoDUNE Installation

Installation Tools CERN PSL Overhead hoist outside the TCO for manipulating beams in the cleanroom 2 pallet jacks to transfer beams 2 lifting tripods that can reach the membrane floor Overhead crane Genie work platform (and/or scaffolding) for access to 9 support penetrations from inside. Blocking for installing bridge beam trolleys on runway beams. PSL Adapters for DSS survey targets Vernier Calipers Hardware for lifting and temporarily supporting the runway beams Two winches for pulling bridge beams Bridge beam pusher for final positioning of A, C, and E beams. General hand tools April 19, 2017 Dan Wenman | protoDUNE Installation

Beam installation - overview (more details in Bill Miller’s Installation talk) Runway beams are delivered to the cryostat through the TCO Runway beams are lifted through the DSS feedthru’s and temporarily supported and then connected to the DSS supports Bridge beams are lifted through the cable feedthru’s and mounted to the runway beams. April 19, 2017 Dan Wenman | protoDUNE Installation

Support rod lateral constraint hardware The support rods are supported from a spherical bearing have an adjustable constraint mounted to the bottom of the DSS inner tube. Design accommodates +/- 2cm of positional error in addition to 1cm for contraction at the bottom of the inner support tube April 19, 2017 Dan Wenman | protoDUNE Installation

Alignment of the runway beams Before Installing the beams, the DSS supports will be installed and adjusted to their nominal position and surveyed with respect to the south wall and the beam window. (Dummy DSS support for early survey?) Using the survey information, the lateral constraints on the bottom of the DSS support tube will adjusted to put the support points in proper x, y, and z position. 1cm clearance to accommodate thermal contraction of the TPC must be confirmed. Some of the DSS supports will be removed for runway beam installation, but constraint adjustment will be preserved. Mount survey adapter and target here April 19, 2017 Dan Wenman | protoDUNE Installation

Alignment of the runway beams To minimize work at height, the bridge trolleys could be clamped to the runway beams before lifting. April 19, 2017 Dan Wenman | protoDUNE Installation

Alignment of the bridge beam E 4x Etched reference marks To control the “x” location of the bridge beams, the guide rollers are adjusted to fit with minimal clearance to the runway beam. The location of runway beam to the reference end of the bridge beam will be set by measurement. To control the y dimension, etched referenced marks will be used. Bridge beam E is moved under the DSS runway supports near the final Beam E position and the midstream and down stream the guide rollers adjusted. Beam E is driven manually to the Beam C position and Beam A position to check for binding. Small adjustments of the lateral constraints are made if necessary. Beam E is temporarily mounted in its proper position. April 19, 2017 Dan Wenman | protoDUNE Installation

Alignment of the bridge beams A,B,C,D Beam A will be driven near beam E. The center and downstream bridge trolley position is verified and adjusted. The guide rollers will be adjusted for minimal clearance. Beam A will be driven to the Beam C position and Beam A position to check for binding. Small adjustments of the guide rollers will be made if necessary Beam A will be translated out of the way. This procedure is repeated for Beams B,C, and D April 19, 2017 Dan Wenman | protoDUNE Installation

Location of APA, CPA, EW mount points The location of the mount points for the APA, CPA, and EW is etched on to the bottom of the bridge beams. The bow of the bridge beams will be measured and adjustments to the mount points canl be made, if necessary, to compensate for bow in the bridge beams. April 19, 2017 Dan Wenman | protoDUNE Installation

Driving of the loaded bridge beams The first beam to be loaded and mounted in its final position is Beam A. This beam will be pulled by two winches and then pushed into final position by two manually driven pushers. After beam A and E are connected to the runway beam, the remaining beams will be moved by pulling or pushing on the downstream end. Pulling a full length bridge beam on one end is being set for testing at Ash River April 19, 2017 Dan Wenman | protoDUNE Installation

DSS constraint during first phase of installation Note: BB-A and E are bolted to 3 runway beams Top view of DSS BB-E DH-3 DH-6 DH-9 North Drift BB-D Beam DH-5 DH-2 DH-8 BB-C Fully constrained RB-1 RB-2 RB-3 South Drift Constrained in x BB-B Constrained in y y DH-1 DH-4 DH-7 BB-A x Dan Wenman | protoDUNE Installation April 19, 2017

DSS constraint After south drift is deployed Note: BB-A and BB-C are bolted to 3 runway beams Top view of DSS BB-E DH-3 DH-6 DH-9 North Drift BB-D Beam DH-5 DH-2 DH-8 BB-C Fully constrained RB-1 RB-2 RB-3 South Drift Constrained in x BB-B Constrained in y y DH-1 DH-4 DH-7 BB-A x Dan Wenman | protoDUNE Installation April 19, 2017

DSS constraint for deploying north drift FC’s Note: BB-A, BB-C, and BB-E are bolted to the runway beams Top view of DSS BB-E DH-3 DH-6 DH-9 North Drift BB-D Beam DH-5 DH-2 DH-8 BB-C Fully constrained RB-1 RB-2 RB-3 South Drift Constrained in x BB-B Constrained in y y DH-1 DH-4 DH-7 BB-A x Dan Wenman | protoDUNE Installation April 19, 2017

Load Transfer - Bridge beam to runway beam The bearings in the bridge trolleys are alloy steel and become brittle and are not suitable to carry loads at cryogenic temperatures. The bridge beams are positioned as described earlier then connected to the runway beams with bolts. These bolts lift the bridge beam and off loads the trolleys. These trolleys are difficult to remove and are designed as clean trolleys and can be left in place. April 19, 2017 Dan Wenman | protoDUNE Installation

Load Transfer – APA to bridge beam The APA trolleys are standard trolleys and are not suitable for cryogenic service. Pair of trolleys deliver the APA to position. The APA mount assembly is mounted to the bridge beam and postioned as defined by the etched reference marks. The APA support rod is adjusted to Transfer the load to the APA mount. The APA trolleys are disconnected from the APA, the center bolt is loosened and the lifting straps are rotated horizontal to allow for the trolley to be removed.. April 19, 2017 Dan Wenman | protoDUNE Installation

Load Transfer – CPA to bridge beam The CPA trolleys share the same attachment point as the fixed support point and one trolley support one half pitch CPA Like the APA trolleys they are modified versions of standard trolleys that are not suitable for cryogenic service. The CPA trolley delivers the CPA to positions as defined by the etched reference April 19, 2017 Dan Wenman | protoDUNE Installation

Load Transfer – CPA to bridge beam The CPA support, which part of the trolley, is mounted to the beam The trolley side plate assemblies can then be removed one at a time. April 19, 2017 Dan Wenman | protoDUNE Installation

DSS QA Plans Beams will conform to ASTM A6 for dimensional tolerances and with material compliance and test reports per EN 10204 3.1. Beams and DSS components will be dimensionally inspected at PSL DSS hangers will be load tested individually at 1.25% with a dummy load. The DSS assembly will be leaked checked to 1.0E-9 atm-cc/s by vendor. Bridge beam, APA, and CPA trolleys will be certified for load ratings by trolley vendor. Bridge beam trolley components are being tested for purity. Driving loaded bridge beams from one end will be tested at Ash River. All DSS components will be delivered clean and wrapped to maintain cleanliness 4. April 19, 2017 Dan Wenman | protoDUNE Installation

DSS QA Plans Survey –at CERN Testing –at CERN Survey the APA, CPA, and EW mount points? Survey the APA, CPA and EW after installation? Testing –at CERN The maximum load times 1.25% will be applied and this load will be exercised through the range of the bridge crane. Leak checking of DSS flange? April 19, 2017 Dan Wenman | protoDUNE Installation

Backup slides April 19, 2017 Dan Wenman | protoDUNE Installation

Plan View Upstream Beam Left Midstream Beam Left Downstream Beam Left Beam Right Midstream Beam Right Downstream Beam Right Beam Left = BL Beam Right = BR Upstream = US Midstream = MS Downstream = DS