Jamestown 2007 Anniversary Celebration

Slides:



Advertisements
Similar presentations
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Advertisements

Eastern Virginia Airport I. Introduction The Eastern Virginia Airport System Study (EVASS) was an analysis designed to help the Commonwealth identify a.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
TransLink’s role in supporting Cycling in Greater Vancouver ProWalk/ProBike 2004 Gavin Davidson, Program Manager, Bicycle Planning Greater Vancouver Transportation.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
Disaster Evacuation – Emergency Response I. Introduction The objective of this network is to ensure that operational transportation policies, protocols,
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Regional Priority Bus Transit Conference June 24, 2009.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
City and County of San Francisco Mayor’s Transportation Task Force: Draft Findings and Recommendations Presentation from the San Francisco Controller’s.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Hampton Roads Third Crossing I. Introduction VDOT, in cooperation with the Federal Highway Administration (FHWA) is proposing to construct a new bridge-tunnel.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
INTRO- DUCTION April 13, 2016 Park City Council Summit County Council.
The Partnership between Transportation and Technology Jennifer Mitchell, Director Department of Rail and Public Transportation ITSVA Conference.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Chelan County Transportation Element Update
Integrating Transit and Highway Solutions In High Volume Corridors
32 Transportation Midway City 2016 General Plan
Project Overview – Phase 1
Title of Presentation Bike Sharing System CE 635 Huang Liu.
Future Interstate 11 Kevin Verre
NGTA Halton Planning and Public Works Committee
Major Projects in Development
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Free MetroRide Travel Time and Reliability Improvements
Draft Transportation Element September 6, 2017
Transportation Engineering
San Mateo Countywide Transportation Plan update
Comprehensive Transportation Plan
Transport and Climate Change: Priorities for World Bank-GEF Projects
SANDY SPRINGS CITY COUNCIL MEETING
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Victor Valley Subarea Expenditure Plan
Chapter 5. The Transportation-Planning Process
Transportation Task Force Mission and Vision
Transportation Engineering Wrap-up of planning February 2, 2011
Lyle Parkway to SR 540 (Winter Lake Road)
Coordinating And Prioritizing Multimodal Transportation Projects
School of Civil Engineering
Design Criteria CTC 440.
D Line Project Overview
Southern Bridge Project Brown County Executive
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MPO Board Presentation
Transit Financials - Round Table Discussion
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Chicago to Council Bluffs-Omaha
MD 355 FLASH Phase 2 Study Results
Presentation transcript:

Jamestown 2007 Anniversary Celebration I. Introduction Jamestown 2007 is planned to be a collection of more than 100 events, major and small, that will commemorate the 400th Anniversary of the establishment of the first permanent English settlement in North America on the shores of the James River in 1607. These events are anticipated to take place between the fall of 2006 and the spring of 2008 across the Commonwealth of Virginia. The vast majority of these activities are likely to be relatively small in size and localized in scope. Most events that are planned to take place in the Historic Triangle (Jamestown- Williamsburg-Yorktown) area will likely create somewhat busier than average peak visitation levels. The recommended transportation plan consists of the following basic elements: • Highway Improvements; • Park-and-Ride Facilities; • Local Transit and Ferry Services; and • Intercity Transit Services. II. Need and purpose of multimodal system The 400th anniversary commemoration of the settling of Jamestown in 2007 will bring thousands of additional tourists to this area. These improvements will ease traffic concerns during the commemoration, but will also serve to address long-term congestion issues in the future. The recommendations in this plan reflect the following objectives: Minimize the congestion impacts of the anticipated events on the regional highway system; Maximize the convenience, safety, and reliability of alternative transportation services for a relaxed and pleasurable visitor experience; and Miinimize impacts to the local community by physically separating visitor from local traffic as much as possible. IV. Integration plan The recommended transportation plan consists of the following basic elements: Highway Improvements, Park-and-Ride Facilities, Local Transit and Ferry Services, and Intercity Transit Services. SR 199/SR 31 Highway Cost: The total project is expected to cost about $31.8 million. Source: VDOT Other Transportation Costs: The table below presents the distribution of estimated costs by year. Capital expenditures for bus purchases corresponding to transportation plans for Williamsburg Area Transport and the Colonial Parkway begin in 2004. With the exception of funding for continued planning and coordination, most other costs are incurred in 2006 or 2007. III. Rationale for selected alternative - Route 199/Route 31 Improvements include: * Completing the expansion and beautification of the Route 199 corridor to a four-lane facility * Route 31 improvements at the Route 199 intersection, a congested location in the City of Williamsburg * Reconstructing the Route 359 access to Jamestown Settlement and Jamestown Island to enhance access and traffic flow during the 400th anniversary celebration. - Shuttle Buses * Help provide adequate support for the generally higher levels of “everyday” visitation anticipated for 2007. * This service would provide a direct, smooth connection between the intercity travel modes and the shuttle service. - Ferry Service * Up to four ferries can be operated simultaneously. The Plan recommends that this maximum potential level of service be operated during peak events. - Bicycle Element * This plan recommends the completion of several critical links in the regional bikeway system plan