GPS Pedometer.

Slides:



Advertisements
Similar presentations
Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
Advertisements

Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Dec I/O Laboratory Development Industrial Review Board Presentation December 12 th, 2001 Cpr E 211 Microcontroller Evolution.
Wireless Stereo Audio Communicator for Television Use Dec /10/2002 Team Members: Advisors/Clients: Matthew Hamilton Dr. John Lamont Eric Hagen Prof.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
Inventory Control in Stores Dec05-09 Team: Jeff Benson Frederick Brown Christopher Reed Brian Wagner Date: December 6, 2005 Client: ISU Senior Design Program.
Tree Nursery Inventory Barcode System Abstract A hardware and software solution will be designed and built for Hynek Tree Farms to allow them to keep track.
Operating Environment To be used indoors Stored indoors End Product and Deliverables Handheld Device Computer Monitor Wireless Printer Central Computer.
WCBI Team Information Team number: Client: Faculty Advisors: Technical Advisors: Team Members: May02-11 Square D Company (Greg Wiese) Glenn Hillesland.
Team Members: Nahiyan Ali Shrabantee Chatterjee Vaibhav Kumar Alex Weigel Tao Zeng Advisor: Dr. Mani Mina Client: Senior Design Dr. Gregory Smith.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Paint Heat Lamp Power and Control System Team Members: Sui Kwan Ng Vincent Ong Raymond Sidharta Joseph L. Vetter September 18, 2003 Client: H & S Autoshot.
EE 491 Project Presentation May07-04 – PDA Based UAS Remote Video Terminal Team Members: Devin Carney Jonathan Farmer Matt Henkes Rene Rios Faculty Advisor:
Project: May Project Team Members: Edward McDowell, EE Richard Mott, EE / Econ Faculty Advisors: Dr. John.
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
Abstract Introduction Project Requirements Resources Proposed Approach and Consideration Closing Summary General Information Faculty Advisor Dr. Gerald.
Smart Digital Valve Control Simulator May April 25, 2001 Client: Client: Fisher Controls Intl. Inc. Contacts: Contacts: Patrick Ryan and Jeff Seyller.
Optical Encoder for a Game Steering Wheel May Team members Sam DahlkeCpr E Peter FecteauCpr E Dan PatesEE Lorenzo SubidoEE Advisors Dr. James Davis.
Abstract Proposed Approach Solution Development Project Requirements Estimated Resources Other Resources Financial Resources Project Schedule Computer.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
Radio-Controlled Duck Decoy May April 30 th, 2003 Team Members: Faculty Advisors: Jason Freerksen Prof. Robert Weber Kooi-Tjek Lau Prof. Clive Woods.
Alternative Lower Cost Hearing Aid Dec03-10 Client: Herb Harmison Advisor: Edwin Jones Jr. Team Members: Hassan Qureshi Hamdan Al-Mehrezi Trong Do Nathan.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure the evidence is.
Multiple Robot Network Team May Clients: Brian Johnson, Shayne Schiltz, and Amy Wilmeth April 26, 2001.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
CYBERSIM Dec Client: Information Assurance Center Advisor: Dr. Doug Jacobson Group Members: Ryan ApplegateCprE Saddam KhattakCprE Dan NguyenCprE/JLMC.
Senior Design Laboratory Design Dec 05-01
Defining Procedures for Decision Analysis May & Engr A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph.
Introductory Client: Herb Harmison 2692 Meadow Glen Road Ames, IA Faculty Advisor: Edwin Jones Jr. Team Members: Hassan Qureshi CprE Hamdan Al-Mehrezi.
Viking Pump Flow Manager - Phase 2 Senior Design May
EE 491 Project Presentation May07-04 – PDA Based UAS Remote Video Terminal Team Members: Devin Carney Jonathan Farmer Matt Henkes Rene Rios Faculty Advisor:
The group will focus on the design of a “smart” device. This includes researching the best method of design and fabricating the design to create a working.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Wireless Appliance Controller TeamClientFaculty AdvisorStudent Members sdmay03-20 Senior DesignDr. Arun SomaniDonny PrabowoBenjamin Taylor Todd RoushKheng-Hin.
Abstract Inexpensive ultrasonic tape measures are available that can only measure perpendicular distances to fairly large, flat surfaces. Complex environments.
Cybot and OSCAR Elementary School Tutorial Dec02-03 December 10, 2002 Client: Electrical and Computer Engineering Department Advisors: Dr. Lamont, Dr.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Device Interface Board for Wireless LAN Testing
MAY LEGO ENVISON SYSTEM Team members: Brennan Beavers (CprE) Justin Goers (CprE) Erin Isvik (CprE) Roger Rathje (CprE) Client: Toying with Technology.
M.E.L.V.I.N. Electronic Voting System for a Legislative Body May /07/02.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Equations for Ecademy Client: ISU Computation Center Faculty Advisor: Dr. Robert Anderson Technical Advisor: Dr. Pete Boysen Team Members:  Tim Arganbright,
A Secure Wireless Interface between Personal Digital Assistants (PDAs) Team Dec02-07 Client:Motorola.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
Software Engineering, COMP201 Slide 1 Software Engineering CSE470.
Mathematical Teaching Software System Ames Community Schools (ACS) has been concerned with their student’s performance in problem-solving on nationally.
Economic Dispatch of Combined-Cycle Units
Globey’s World K-6 Teaching Application Support and Software Ongo-08b
Personnel Effort Budget
Dec03-11 Portable Gas Safety Sensor December 9, 2003
Multiple-Output, Variable-Output DC Power Supply - Phase 2 May 04-08
A Secure Wireless Interface between Personal Digital Assistants (PDAs)
Software Support Framework
Planetarium Resuscitation Ongo-06 May 1, 2002
Garage Parking Indicator
Campus Locator – Definition Phase (May04-04)
Java Embedded Network Intrusion Security
Personnel Effort Budget
Globey’s World Ongo-08b Abstract End-Product Description Introduction
End-Product Description
Introduction Members: Robert E. Meyer III Dan Phan-Quoc Kieu Michael T. Riley Andrew Siefer Advisors: Dr. J. W. Lamont Dr. R. E. Patterson III Client:
Automated Printed Circuit Board Development
Globey's World Abstract Design Requirements Introduction
Statistical Golf Analyzer
Planetarium Resuscitation Ongo-06 February 14th, 2002
Power Market Game.
Ocular Prosthesis Team Members: Adam Lee, EE Faculty Advisors:
Presentation transcript:

GPS Pedometer

GPS Pedometer Dec 02-09 Presented: 11/14/02 Client: Senior Design Group Members Dan Luchsinger Charles Thomas Dave Myers Joey Kremer Faculty Advisors C. “Jolly” Triska Glenn Hillesland Technical Advisor Robert Weber

Overview Problem Statement Design Objectives End Product Description Assumptions and Limitations Technical Approach Milestones Budgets

Overview Cont. Risks & Risk Management Lessons Learned Recommendations For Future Work Summary Questions

Problem Statement The objective of this project is to develop a non-athletic track-oriented pedometer that would sell commercially for no more than $100. Its features include: A distance calculation based upon global position satellite (GPS) data. Elapsed time measurement. Average speed in miles per hour.

Design Objectives Design Functionality Design Constraints -Provide fairly inexpensive, accurate and interactive pedometer for people who exercise outdoors. Design Constraints -Software cost will be less than $100 -Weigh less than 1.5 lbs -Compact dimensions Intended Users / Uses -Runners, cyclists, rollerbladers, canoers -Display elapsed time, distance traveled, average speed, and total calories burned

End Product Description The GPS Pedometer is a combination of a GPS receiver connected to a Palm PDA, via a data cable. The Palm PDA contains software that is implemented using Java to interact with the user. The developed software will retail for less than $100.                                               

Assumptions and Limitations The user already owns a PDA and GPS Receiver The software is limited to serial port based Palm PDA’s Weather will not affect the unit The GPS Pedometer will not be dropped from a great height The software for the GPS Pedometer will retail for less than $100 The unit must be lightweight GPS resolution is at best 6.1 feet

Technical Approach Hardware Software - GPS receiver - Palm m105 PDA - Serial port connections Software - Java interpreter on Palm OS - Interactive software prompts user for weight, age, sex, and activity

Technical Approach

Milestones Display GPS data on PC Connect GPS receiver and PDA Complete Java code Complete GPS Pedometer implementation

Financial Budget Parts Estimated Cost Actual Cost 2 GPS receivers $250 $0 PDA $150 $106 Data Cable $35 $8 Poster $50 Bound Project Plan $10 Totals $495 $174

Personnel Effort Budget Team Member Estimated Effort Actual Effort Dan Luchsinger 170 Hours 112 Hours Charles Thomas 175 Hours 105 Hours Dave Myers 180 Hours 123 Hours Joey Kremer 106 Hours Totals 695 Hours 446 Hours

Risk and Risk Management Loss of a team member Failure to procure equipment donations Unable to receive accurate GPS data Failure to meet design expectations

Lessons Learned Communication is essential Time management is important Meet Weekly Have Fun

Recommendations for Future Work Add additional customized features -Incorporate sound features -Add power-saving schemes Create software for all PDA models

Summary 

Questions?