ASAS Thematic Network ASAS Operational Improvements -Dream or Reality:- The Impact on the Controller Anthony Smoker - IFATCA ASAS-TN First Workshop Rome.

Slides:



Advertisements
Similar presentations
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Advertisements

1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS-TN - Rome, 2003 ASAS Thematic Network 1 st Workshop Rome April 28-30, 2003 AN OPERATOR’S POINT OF VIEW.
Airborne Separation Assistance System Thematic Network An Overview Bill Booth, EUROCONTROL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
2005 International Federation of Air Traffic Controllers’ Associations Anthony Smoker IFATCA ASAS-TN2 Second Workshop Roma, 3rd-5th April 2006.
Continuous Climb Operations (CCO) Saulo Da Silva
HCI in Safety-Critical Applications: ATC Systems Aslan Neishaboori.
The pilots view on ASAS A highlevel perspective on ASAS by a pilot with ASAS expertise knowledge. Presented at the ASAS Thematic Network Workshop 07OCT.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OHA CARE-ASAS Activity 3: ASM Time-Based Sequencing OHA.
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
Study Continuous Climb Operations
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
1 CoSpace Experimental results on sequencing & merging Karim Zeghal ASAS Thematic Network, Second workshop 6-8, October 2003, Malmö, Sweden.
27 June Human Factors and Safety: Rapporteur and Session Chair Reports.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Using Human Component Mapping TO ANALYSE & INTEGRATE HUMAN FACTORS ISSUES & RECORDS WITH RAILWAY HAZARD LOGS 1 Dr. Amanda C. Elliott, Simon Macmull & Harry.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS Thematic Network First Workshop Outcome Eric Hoffman 6-8th October Malmö.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Discussions Summary ASSTAR - Crossing & Passing session.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASAS TN2 Final Seminar Paris, April 2008 LEGAL ASPECTS OF ASAS Dr. Francis SCHUBERT Head Corporate Development / skyguide.
ASSTAR Overview Jean-Marc Loscos, DSNA
Good practices abroad / Cyprus case The OiRA implementation
Workshop on preparations for ANConf/12 − ASBU methodology
LO1 - Analyse the impact and influence which the macro environment has on an organization and its business strategies 1. P1 Applying appropriate frameworks,
Chris Shaw, EUROCONTROL Experimental Centre
Continuous Climb Operations (CCO) Saulo Da Silva
ASSTAR Oceanic Session Summary
Fredrik Barchéus, KTH Lena Mårtensson, KTH Anthony Smoker, IFATCA
OPTIFRAME : Project Overview
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Implementing the NHS KSF Action Planning and Surgery Session
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Human Factors and Safety: Rapporteur and Session Chair Reports
ASSTAR Project Overview & User Forum Objectives
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2.
Objectives of the Workshop
First Workshop ASAS Benefits - Dream or Reality?
Passing on your experiences
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS Thematic Network ASAS Operational Improvements -Dream or Reality:- The Impact on the Controller Anthony Smoker - IFATCA ASAS-TN First Workshop Rome April 2003 ASAS-TN Rome 29th-IV-2003

ATCEUC The contents of this presentation also represent the views of the ATCEUC, whose representative is unable to attend this seminar. ASAS-TN Rome 29th-IV-2003

Dream or Reality? For many controllers, ASAS has the potential to be a “bad dream” – why? What will be the effect of ASAS on controllers? – technical concerns and practical considerations ASAS-TN Rome 29th-IV-2003

Controllers and ASAS History: “ASAS” style concepts have been around for many years – IEE 1961 etc Generally there is a poor record of implementation of advanced technical systems into ATC - leads to concern and a legacy The needs of the controller are often secondary to implementation – compromise and understanding of the controller task – “Cinderella effect” Human in the system used as fallback for poor system design or technical shortcomings Differing interpretations of procedures ASAS-TN Rome 29th-IV-2003

The IFATCA View “It is arguable that the concepts have a potential to improve the safety and productivity of the ATM system” IFATCA welcomes the change from “assurance” to “assistance” Several areas of concern: many that involve the “impact” on the controller ASAS-TN Rome 29th-IV-2003

IFATCA – Procedural and technical Concerns Visual Separation: ICAO rule changes Responsibility for separation – there remain uncertainties in certain situations Workload impact of “new tasks” - negative or positive effects, task scheduling etc Airspace organisation and: design – rigid discrimination to achieve full ASAS benefits? ASSAP – identification of traffic Intent information ASAS-TN Rome 29th-IV-2003

IFATCA Concerns – Practical considerations - 1 How many aircraft can be transferred for ASAS ops at anyone time, and retain system resilience to perturbation? Will flight-deck workload limit the extent of tactical instructions or the controllers tactical freedom? Complexity of multiple clearances to achieve system goals System failure More  ASAS-TN Rome 29th-IV-2003

IFATCA Concerns – Practical considerations - 2 Military traffic Transfer of traffic from sector to sector operating on “ASAS” type clearances Practical application – common pilot understanding ASAS-TN Rome 29th-IV-2003

Wider Issues Don’t forget that controllers have other tasks than separation to fulfil There are lots of other ”tools” e.g. MTCD, AMAN, DMAN, all competing for controller workload resources! What are the limitations of ASAS – in a control sense? ASAS concepts must be embedded into a holistic concept of operations ASAS-TN Rome 29th-IV-2003

Conclusions ASAS is here, but then it has been a long time in coming! There is a long way to go. There is much that we simply do not know about ASAS in operation THE IFATCA vision, might perhaps be that ASAS should be just another tool in the controller “box of tools” – please ask us ASAS-TN Rome 29th-IV-2003

Conclusions – cont’d Please try to appreciate that controllers are system users as well, not just system providers, and that we have our own set of user requirements to make ASAS work. Moreover, many controllers simply do not understand why there is a need for ASAS, and there is a need to ensure that they are engaged fully in it’s development ASAS-TN Rome 29th-IV-2003