ALICE Muon Tracking Upgrade

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ESS Program Plan and Schedule Update
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
University of Wisconsin
Cabling for LHCb Upgrade
TS2 preparatory meeting
From PS to SPS test beam 22/06/2017.
Update on the SVD construction
LIU Wire Scanner Milestones June 2017
NCCA / PCCA status and plannig Alice Upgrade
Working plan for 2017 Acquisition and Control Electronics
T1 status (a selection from EDR presentations)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
T1 Electronic status Conclusions Electronics Cards:
ProtoDUNE Installation Workshop - DAQ
CMS November Upgrade Week
G. Carboni for the Muon Group
ALICE Muon Tracking Upgrade EDR Answers
TTC System Status May 2007 System overview Production Status
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
CMS RPC Endcap RE1 Status Report
Christophe Beigbeder PID meeting
CMS Goal of the experiment
CMX scope and functionalities
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TSF Upgrade Project Overview Resources Plans and Timetable
HL-LHC upgrade at IPHC news
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
Calice Tile-HCal and Tail-catcher/Muon Tracker
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Plans for the 2004 CSC Beam Test
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

ALICE Muon Tracking Upgrade Engineering Design Review Planning May 5, 2017 Hervé Borel

Short and mid term MCH Planning Work in coming weeks in laboratory (May –June) Noise on DualSAMPA (Orsay / Saclay) Full chain read-out: DS345 + FLEX + SOLAR + GRORC (Saclay) DS345-v2 (Orsay) Test beam PS : 2 weeks (May 31 – June 13) One slat + Silicon Tracker  Noise on detector and spatial resolution Preparation of test beam with a dry run test at Saclay antenna at CERN SOLAR-v2 prototype (June – Sep) (Saclay) Layout starting mid May PRR SOLAR : Sep 2017  End October 2017 ? Electronic PCB for stations 1 and 2 Scheme design for station 1 and 2: started Small and long prototypes for station 1 SPS: 1 week (Sep 13-19)  spatial resolution

Manpower Coordination: Hervé Borel (Saclay), Sabyasachi Siddantha (Cagliari) DualSampa: (Orsay ) Design, layout: Khaing Mon Mon Tun-Lanoë, Gwenaël Brulin Tests : Christophe Suire Testbench (+ read-out fpga): Khaing Mon, Gwenaël, Beng Yun Ki Production: Khaing Mon Large PCBs (Orsay + Kolkata) Design, layout (quadrants of station 1: Orsay): Khaing Mon, Gwenael, Guillaume Noel Design, layout (quadrants of station 2: Kolkata + Aligarh): Lipy Das, Dwijendra Das, Arindam Das Production PCB for station 2: Sukalyan Chattopadhyay (Mamu) FLEX (stations 345) + cables (Cagliari) Design, layout, integration: Davide Marras, Mauro Arba Production: Mauro Arba, Corrado Cicalo SOLAR boards (Saclay) Design, layout, tests: Bernard Paul, Christophe Flouzat Production: Bernard Paul, new person (> June2017)

Manpower Chain Read-out (Saclay) CRU LV system Global integration Firmware, software: Christophe Flouzat (+ Alberto Baldisseri) CRU MCH CRU tests: Kolkata CRU MCH firmware: Christophe Flouzat (Saclay) LV system Re-design: Rony Kuriakose (Ithemba lab South Africa) HB Global integration HB, Sabyasachi Siddantha (Gudda) Installation of the different items Installation of cables Installation of optical fibres: contact with Giuseppe Simonetti Planning Manpower

Manpower Testbeam Installation In addition to the experts of each items: Andry Rakotozfindrabe (Saclay), Richard Pireddu, Carlo Puggioni(Cagliari) Installation Engineer, technicians, Physicists from each laboratory of MCH for stations 3,4,5  In addition to the laboratories already mentioned: - Ithemba Laboratory : Edith Zinhle Buthelezi, Rony Kuriakose, Siegfried Förtsch - SUBATECH Nantes: Hervé Carduner, Patrice Pichot - PNPI Gatchina: Evgeny Rostschin, Vladimir Ivanov Engineer, technicians, Physicists from Orsay for station 1 Engineer, technicians, Physicists from India (Kolkata + Aligarh) for station 2

General SAMPA Production Planning DualSAMPA + FLEX + SOLAR + …: to be mounted during LS2 MCH upgrade planning: Very dependent on SAMPA planning  has shifted a lot ! SAMPA whole mass production: 2018 SAMPA chip tested and ready for mounting: Nov-Dec 2018 SAMPA planning Original planning !! MPW2 submitted : Mach 2015 MPW3 submitted: Sep 2015 Mass production: 2016 SAMPA ready to be mounted: mid 2017 Present, realistic planning MPW3 submission: end April 2017 ( postponed) MPW3 packaged received: end Aug 2017 MPW3 on DualSAMPA boards: Oct 2017 MPW3 validation: Dec 2017

General SAMPA production Planning Final SAMPA submission: Jan 2018 Start final production: May 2018 SAMPA packaged batch 1 (33%) delivered: Beg Sep 2018 Robotic testing batch 1: beg Oct 2018 SAMPA packaged batch 2 (66%) delivered: Beg Oct 2018 Robotic testing batch 2: beg Nov 2018 SAMPA packaged batch 3 (100%) delivered: Beg Nov 2018 Robotic testing batch 3: beg Dec 2018 Remarks: batch 1 ≡ TPC batch ~ 6500 SAMPA; robotic testing by TPC Lund lab, presently for TPC chips  Discussion with Lund for testing SAMPA for MCH: MCH will use Lund testbench ; need MCH manpower (or extra budget) for the testing.  6 months for testing ! … but do not need all at the beginning

DualSAMPA production and installation Planning Need 19000 DualSAMPA including spares (16500 to be mounted in cavern) Populating DualSAMPA with SAMPA chips will follow SAMPA production testing PCB production can start earlier Production: start March 2019 – end March 2020 Work in cavern By half chamber: 9 slats (station 3) or 13 slats (stations 4&5): ~ 1000 DS ; 12 half chambers By quadrant: ~500 DS; 16 quadrants 20 opening days (1 month) of work on one half chamber (dismounting slats – replacing FLEX + cable + DS – remounting slats – SOLAR fixing cabling – 1st commissioning)  need teams from each lab ; one team (3-4 people) per week, each week  plan manpower ! Need : delivery of 1000 DS345 + 500 DS12 per month At least, 1 year of installation + 1st commissioning Earliest installation start: April 2019 (LS2 start: Jan 2019) End of installation : April 2020

SOLAR planning Need 624 SOLAR boards to be installed in the cavern (700 including spares) First prototype ready – used for tests EDR: May 5 Second prototype: Schematic finished Layout starting mid May Fabrication: June –July Tests: July – End Sep PRR SOLAR: Sep 2017  End October 2017 Submit SOLAR pre-production: Nov 2017 Pre-serie production: 25 Production: 1 month Validation with Automatic testbench: 3 month SOLAR Test bench: June – Oct 2017 Full Production: ~1 year from March 2018 - SOLAR produced & tested: Jan 2019

FLEX planning Design of all FLEX types: 4 months FLEX Production: in discussion with companies Planning is not an issue for FLEX