WT CALL – 04/10/2017 2017-10-04.

Slides:



Advertisements
Similar presentations
GSMP Local Community Network Enhanced Process Physical Meeting, San Diego Oct
Advertisements

Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011.
Welcome!! A Premier Event for OpenFlow/SDN. Estimate vs Demand EstimateDemand Registrations 600+ Tutorials Demos
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Microwave Radio Link YANG Data Model draft-ahlberg-ccamp-microwave-radio-link-00 IETF 95 - Buenos Aires – CCAMP WG Jonas Ahlberg (Ericsson)
ITU Liaison on T-MPLS Stewart Bryant
NCI CBIIT LIMS ISIG Meeting– July 2007 NCI CBIIT LIMS Consortium Interface SIG Mission: focus on an overall goal of providing a library of interfaces/adapters.
Collaboration Board Meeting 11 March 2016 Alberto Di Meglio CERN openlab Head.
Open Transport Config and Control Project Agenda and Notes
Welcome! Microsoft Dynamics NAV User Group (NAVUG)
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
ONF presentations to ETSI NFV Info Modelling Industry Status ONF Modeling Update 29 March 2016 Note that some points are related to the Multi-SDO Issues.
So what can I expect when I serve on a NEASC/CPSS Visiting Team?
District And Club database
ONAP Interface to External Controllers
Vendor Demonstrations
P802.1CM Time-Sensitive Networking for Fronthaul
5GCOM Report to Board# review and 2017/2018 objectives
ETSI NFV POCS and PLUGTESTS
Open Transport Config and Control Project Agenda and Notes
Open Transport WG Agenda and Notes
Open Transport Config and Control Project Agenda and Notes
Enterprise vCPE use case requirement
NG60 SG March 2015 Agenda Date: Authors: March 2015
ACCU meeting - D.Chromek-Burckhart – Users’ Office
Edgecore ASFvOLT16 VOLTHA Adapter and Driver Kim Kempf, Sr
ONAP – Centralised Parser Distribution Atul Purohit - Vodafone
Enterprise vCPE use case requirement
Gift Case Gijs Bos, Ana Stepić, Vlatko Klabučar, Damir Tomić,
Open Source Access Manager™ ONAP Proposal
WG Belgian Grid Implementation Network Codes.
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
Vertical Applications TAG
Documenting ONAP components (functional)
Executive Secretary Agenda Items March-2016-Plenary
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
11/30/2018 Approved Evaluator Training Provider on the Colorado State Model Evaluation System Application Process November 2016.
Casablanca Platform Enhancements to Support 5G Use Case Summary of Planned Enhancement Areas (TSC Review) 5G Use Case Team May 10, 2018.
ACTORS DESCRIPTION PNF
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
TTCN-3 Status Report.
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
Casablanca Platform Enhancements to Support 5G Use Case (Network Deployment, Slicing, Network Optimization and Automation Framework) 5G Use Case Team.
Next Generation V2X Study Group Jul 2018 Agenda
EXHIBITION CALENDAR SPRING 2019
ONAP 5G USE CASE ENHANCEMENTS
H2020 SCC Smart Cities & Communities Info Day Horizon 2020
May 2015 doc.: IEEE /0496r1 November 2017
IEEE OmniRAN TG July 2014 F2F Meeting
Welcome to Training at LAL
Casablanca Platform Enhancements to Support 5G Use Case Summary of Planned Enhancement Areas (TSC Review) 5G Use Case Team May 10, 2018.
WT CALL – 31/01/
5G Use Case Configuration & PNF SW Upgrade using NETCONF ONAP DDF, Jan 9, 2019 Ericsson.
WT INTEGRATION IN BROADER ARCHITECTURE - for discussion -
Southern Connecticut State University Core-CT
Passenger Mobility Statistics 21 May 2015
Item 2.2 of the agenda IT Working Group meeting 2016
EFSA’s dedicated support for SMEs
May 2015 doc.: IEEE /0496r1 November 2017
Device Management Profile and Requirements
Introduction to Models, Interfaces, Guidelines & Tooling from ONF Open Information Model & Tooling (OIMT) project and ONF Open Transport Configuration.
Casablanca Platform Enhancements to Support 5G Use Case Summary of Planned Enhancement Areas 5G Use Case Team May 10, 2018.
Casablanca Platform Enhancements to Support 5G Use Case Summary of Planned Enhancement Areas 5G Use Case Team May 10, 2018.
WT CALL – 26/9/
WT Activities F2F meeting London, March 2018.
Presentation transcript:

WT CALL – 04/10/2017 2017-10-04

AGENDA Administrative and organizational Model PoC 4.1

ADMINISTRATIVE AND ORGANIZATIONAL Some feedbacks from Timon on collaborator status “Collaborator status is tied to companies making demonstrable contributions to a particular project. Collaborators need to submit an application for recognition (and to propose future work items to the TST). These applications go to the project TST, and also require ONF approval” Proposal to discuss model aspects in alternate weeks: Ethernet & MW model in WT call Calendar: Week 40 (Wednesday 4/10): MW model in WT call Week 41 (Wednesday 11/10): Ethernet model (detailed parameter) in WT call Week 42 (Wednesday 18/10): MW model in WT call

ADMINISTRATIVE AND ORGANIZATIONAL (2) FACE TO FACE MEETING FOR TAPI AND OTIM during CORD build event: Nov 6-10, 2017, Google Facility: Quanta Cloud Technology (QCT), 1010 Rincon Circle, San Jose, CA 95131 OTCC & OIMT meets at event venue on Tue-Thu and at ONF office on Mon/Fri Co-located with CORD Build Summit Registration: http://cordbuild.org/ (Free for ONF members) Agenda Wednesday morning: TAPI presentation; this will be on the CORD Build agenda Wednesday afternoon: track for TAPI and Core IM; this will be on the CORD Build agenda Tuesday and Thursday we have a large room for us to work; this will NOT be on the CORD Build agenda Science fair stand for demo, 2 hours per day at lunch time on Tuesday, Wednesday, & Thursday

MODEL --> Reference LINK to Mantis tool: http://tr532.bugtracker.openmicrowave.com/   NEW: 0000023 (25/9): ODU HW and FW versions: Versions of the ODU Hardware and Firmware shall be available for reading. Other topics for model extension (proposed last week): Point to multipoint (already tracked as 0000009) Distributed antenna System (DAS)  currently used in RAN access. Needed to extend the model to cover radio access. This could be applicable to transport once self-backhauling will be applied (5G meshed network architecture).

PoC 4.1 Scope of the PoC: retrieve of the inventory through AAI interface (ONAP architecture) from ODL SDN Controller. On southband the Equipment model and inventory model is requested from equipment vendors. Round-table about possible participation of the vendors attending the call: Ceragon: no official position yet (11/10 to be checked) NEC: under evaluation remote connection participation. Nokia: need to check Ericsson: We would prefer to concentrate on further enhancements in definitions and implementations and propose to show the planned content of PoC 4.1 within PoC 5. ZTE: possibility to participate from remote labs SIAE: no official position yet (11/10 to be checked) Note that the participation can be also remote, connecting equipment to the SDN CTRL located in DTAG (used for the 4th PoC). IP tunnel will be needed to connect. ONAP: ongoing the ONAP meeting in Paris: see the following slides: https://rs.opennetworking.org/wiki/download/attachments/265093121/5G%20RAN%20Slicing%20and%20Optimization%20Framework%20v5.pptx?api=v2

PoC 4.1

PoC 4.1

SUM-UP Reference interface Interface extensions requested Extensions in other components Extensions in SDN WT controller equipment and inventory AAI Not on southbound (equipment model to be implemented) no Adapter between ONF equipment model and AAI alarms DCAE Adapter between ONF model and DCAE upload of configuration ?? configuration statistics

THANK YOU