VINES – THE OVERLOOKED RESTORATION TECHNIQUE

Slides:



Advertisements
Similar presentations
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Advertisements

DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
At the Jewett Lignite Mine. the re-establishment of the stream system that existed prior to disturbance… the re-establishment of the stream system that.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Delaware River Keeper Caio Costa and Andrew Wirstiuk.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Chicago Wilderness: An Ecosystem Management Plan Katy Berlin Shelly Charron Lisa DuRussel NRE 317 April 11, 2001.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
National Forest Projects West Virginia GIS Conference June 7 – 10, 2010 Huntington, WV Marshall University West Virginia GIS Conference June 7 – 10, 2010.
Name of presenter Date of presentation.  To help preserve and protect Wisconsin’s over 15,000 lakes and 86,000 miles of rivers.
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
Hancock Springs A natural lab for studying the roles of physical habitat, nutrient availability, and non-native species to inform river restoration John.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
1 Gas Pipeline Monitoring in the Delaware River Watershed.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
Watershed Management Muhammad Dilshad Habib 2004-ag-1414
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
National Forest System Grazing Objectives 1.Manage range vegetation to protect basic soil and water resources, provide for ecological diversity, improve.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Students type their answers here
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
Adapting to Climate Change: Using the Green to Beat the Blues Roberta Clowater Executive Director Canadian Parks and Wilderness Society - New Brunswick.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Riparian Zones A riparian zone is a vegetated area (a "buffer strip") near a stream which helps shade and partially protect a stream from the impact of.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
FLR Hierarchical Logic
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
Challenges Facing Riparian Ecosystems
Collaborative Conservation of Critical Delaware River Watershed Land
Economic Study for Watts Branch Stream Restoration N. E
Module 1: Welcome and Overview
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Salmon Spawning Habitat and Sediments
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Depot Park, Clarkston West Bank Restoration.
Presentation transcript:

VINES – THE OVERLOOKED RESTORATION TECHNIQUE

SITE 2-A: BANK STABILIZATION TO PROTECT STATE HIGHWAY RT SITE 2-A: BANK STABILIZATION TO PROTECT STATE HIGHWAY RT. 209, BUSHKILL, PA. DELAWARE WATER GAP NATIONAL RECREATION AREA NATIONAL PARK SERVICE PROJECT CONSTRUCTED SEPTEMBER 14-26, 2009

CONSTRUCTION BUSHKILL CR-SITE 2-A PIX BY DERRICK 9-18-2009 WILDLIFE ON SITE !! His twin had just crossed. Derrick scared this one by yelling “BEAR”... “Based on the interagency publication, Stream Corridor Restoration: Principles, Processes, and Practices, this introductory training covers: Stream corridor ecosystems and their components Ecological processes, structure & functions Characterization and analysis of stream corridors Development of a restoration plan Design, implementation, monitoring, and Integrated, iterative, adaptive, flexible approaches”. CONSTRUCTION BUSHKILL CR-SITE 2-A PIX BY DERRICK 9-18-2009

VINES – THE OVERLOOKED RESTORATION TECHNIQUE Use vines for aesthetics, habitat, & temperature mitigation (reduction in thermal heat transfer from stone structures). For this project one 9 inch long cutting of Virginia Creeper was planted every 5 ft along the top of the stone wall.

1 YEAR LATER-BUSHKILL CR-SITE 2-A - DERRICK 9-12-2010 1 YEAR LATER-Looking @ BW #7 & great first year growth of Virginia Creeper on stacked stone wall. 1 YEAR LATER-BUSHKILL CR-SITE 2-A - DERRICK 9-12-2010

1 YEAR LATER-BUSHKILL CR-SITE 2-A - DERRICK 9-12-2010 1 YEAR LATER-Looking DS @ planted Virginia Creeper vines on stacked stone wall. Great vine growth for first year 1 YEAR LATER-BUSHKILL CR-SITE 2-A - DERRICK 9-12-2010

1 YEAR LATER-Close-up of vines on stone wall. 1 YEAR LATER-BUSHKILL CR-SITE 2-A - DERRICK 9-12-2010

Cleophus Speed Elvis Derrick, note ear on big paw to left This river engineering is really exciting stuff…