The Triathlon (Planning, Execution and Validation)

Slides:



Advertisements
Similar presentations
Micro Control Solutions Stability System II rev. 6.4
Advertisements

Orchard Harvest™ LIS Review Results Training
© 2013 The McGraw-Hill Companies, Inc. All rights reserved. Chapter 9 Tests, Procedures, and Codes.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
RPMS Package Optimizations
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Module 9 Configuring Messaging Policy and Compliance.
User Group Housekeeping in Gold. Regular routines make housekeeping easier.
FireRMS NEMSIS (Part 2) Presented by Laura Small FireRMS Quality Assurance.
CUG Request from 2010 and 2011 User Group Meetings Cortex User Group Meeting Portland, OR – 2012.
Chapter 8 Collecting Data with Forms. Chapter 8 Lessons Introduction 1.Plan and create a form 2.Edit and format a form 3.Work with form objects 4.Test.
Module 9 Configuring Messaging Policy and Compliance.
QuikTrac 5.5, a validated Motorola Software Solution, allows you to take your Host ERP screens and extend them out to fixed or mobile devices including.
Chris Wright Senior Systems Engineer, Lucity MOVING TO ONE DATABASE FOR SQL SERVER.
Database Design and Management CPTG /23/2015Chapter 12 of 38 Functions of a Database Store data Store data School: student records, class schedules,
LOS ANGELES COUNTY CONVERSION ACTIVITIES. LA Conversion Activities  Changing the current CMS Net functionality.  Adding enhancements to CMS Net web.
Munis Version 9.1 & 8.3 Sneak Peek System Administration.
Up-lementation to v4.5 Sue Hughes Director, SCC Implementation/Upgrades.
4.0.7 New Features Presented by Nicholas Felts. What version are you on? A or lower B C D.Live on E.Going to
SoftTotalQC® : Sporting New Features and Taking the Gold with Stronger Standards and Higher Performance! Presented by: Isis Smith, MLS(ASCP) SCC SoftTotalQC.
SoftReports – Ad hoc Reports Presented by Shireen Lakhan SoftReports LIS Trainer.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
Foreign Barcode.
ICD10 Hotfix Review EHR Transition Tools and Dual Coding
Make-Up Testing/Undo Student Test Submissions
Review of IT General Controls
For SoftROE (Recurring Order Entry)
Tissue Management Using SoftBank
Lesson 19: Configuring and Managing Updates
Archie Dennis New Features Archie Dennis
Installation The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the installation.
Introduction to the new robust security system from SCC.
Baylor Scott and White Health, NTD Melinda Doherty, Director LIS
Orchestra Pits Common and Not –So-Common SCC LIS Problems
SoftBank Enhancements
Consults.
Short Guide to SoftMic Supplemental Billing
Project Work Order Generator
Fast Draw Techniques SoftTotalQC Reports Showdown: Bang! Bang! Bang!
SoftReports - Patient Reports
Test Around the Clock Testing Revolutionized
Data-Basics Training & Support
SoftLab 4.5 Overview Archie Dennis.
NEW FEATURES SoftMic Version x Randy Carter SoftMic Specialist
Web-based MAP Help-Desk Training From the Technical Consulting Group
Basic Work-Flow with SQL Server Standard
Maestro Archie Dennis 1st Chair Carlos Padilla
INTEGRATED ELECTRONIC HEALTH RECORD SYSTEM
Mission SoftTotalQC: Navigating Your Quality Control Concerns
Installation The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the installation.
Avatar CWS 2015 New Features – Q2
Customization Guidelines for BMC Remedy IT Service Management 7.5
New Features – x Randy Carter Education Services
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
Trouble-shooting with MOM
Cyber Recruiter: Sneak Peak
iLab Training for VU Departments & Users of VUMC Core Groups
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Integrated Epidemiology Reports
C/S Windows Overview Nigel Pilsbury.
Customization Guidelines for BMC Remedy IT Service Management 7.5
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
New Product Line SoftMic
Presented by: Laurie Sapp Blood Services Product Analyst
Voyage into Validation
Upgrading to SoftLab Version X
iSecurity Password-Reset Training
New Features in Security Management
Presentation transcript:

The Triathlon (Planning, Execution and Validation) Converting to Lab v4.5 The Triathlon (Planning, Execution and Validation)

INTRODUCTION PURPOSE of this SESSION: to share our experience regarding 4.5 “Uplementations”. This Project is like a TRIATHLON: It’s a daunting undertaking. It’s NOT a SPRINT! You need to be in it for the long haul Some parts of it will seem easier to you than others You will be worn out when it’s done People will say that you are crazy

A Growing Community (4 were conversions from 4.0 to 4.5) 14 Clients are LIVE on 4.5: Baylor (TX) Copley Memorial Hospital (IL) Children’s Hosp. of Philadelphia (PA) Johns Hopkins Health System (MD) Mayo (MN) The Methodist Hospital (TX) Montefiore (NY) Mount Sinai (NY) Northshore (IL) Ochsner Health System (LA) Rush University Medical Center (IL) Warde Clinical Laboratory (MI) University Health System (TX) University of Michigan (MI) 5 Clients are currently converting: Univ. of California San Diego (CA) University Hosp.and Health Sys. (OH) Atlantic Health System (NJ) Kindred (KY) Christiana Care Health System (DE) 4 New Clients are implementing: Capital Health Medical Center (NJ) Temple University Health System (PA) National Jewish Hospital (CO) PathWest (Australia) (4 were conversions from 4.0 to 4.5)

Project Planning The move to 4.5 is NOT just an upgrade designed differently, set up differently and works differently Don’t underestimate the effort Other application upgrades will be required Will probably require new or upgraded hardware Requires adequate staff – estimated to be about half of the allotment for the original implementation. Requires adequate time – typically 16-20 months from contract signing Some workflows WILL change Staff education and training is a critical component. Do not assume end users know how the new system will work.

Project Planning HARDWARE / SYSTEM CONSIDERATIONS Typically, a conversion to 4.5 is done on new hardware. Make sure this is evaluated prior to starting the project Servers – Adequate number for workflow. To date, most 4.5 clients have needed to have multiple instances of some servers (RBS, Autoreporting, Label) for enhanced performance. Web logic is required and must be configured correctly PROJECT MANAGEMENT CONSIDERATIONS Project will be run by the Implementation Dept. using Implementation Team Complex Activation Planning – remember BB patient data is converted while Lab/Mic patient data is not. Consider Barcode and Order Wheel numbering in the new environment

Project Planning LIVE © 2015 SCC Soft Computer. All rights reserved. Q1 Q2 Q3 Q4 Q5 Q6 New CPUs, Install SFW, convert setups SYSTEM PREP LIVE LAB/MIC, BB File Build / Process Flows Train Instrument Testing Super User Validation End User HIS Spec Coding Testing, Validation Int.Testing GIS Train File Build/Test Cases/Process Flows Testing / Validation End User AR IMPLEMENTATION (IF you don’t already have it) Train File Build / Process Flows Super User Validation End User © 2015 SCC Soft Computer. All rights reserved.

Project Execution DATA CONVERSION SCC programming will do the data conversion and will provide a guide outlining items that need to be checked following the conversion. Database structure in 4.5 is different in many areas. All setup and functionality should be reviewed. They may require addition or modification of setup, modification of current workflows, or choices made to retain previous setup/workflow. Plan Execute Validate

Major 4.5 Setup Changes Specimen Model – is integral to many of the 4.5 changes Container setup – common file with GIS Label characteristics for collection and processing (++ and **) Instructions for splitting labels Workstation flags Modification of GRID hosparams and settings to include barcode column where available. Previous MMT different in 4.5. Hosparams: many moved to Settings / Definitions Call List: Ability to define call routing per clinic, define own categories, etc. Call List monitoring report for missed calls is available and should be scheduled for automatic notification at every client site. Call List Configuration and Settings/Definitions for most setup. All hosparams are obsolete

More Major 4.5 Setup Changes Security Management Increased permission class functionality, Longer Initials, Must use roles and printer roles Possibly remove Review requirement. Whether copy from old 4.0 or set to new default – should be checked to know if/when want to review. Billing: All billing is done in SoftAR, Bill or Bill+. Most fields regarding billing and reports are removed from SoftLab. SQLs: Reports will have to be recreated in 4.5. If SCC originally created the SQL you use, SCC will convert it. If you created the SQL, you will need to recreate it. System File Check: Reports are in SoftReports within Tools menu

Interfaces HIS / EMR interfaces (both inbound and outbound (ESBRR)) will be re-written, starting with the specification process. Be very specific about what you expect. Plan appropriate resources for these interfaces, and adequate time for delivery, testing and validation. Interface OEHIS parameters are now in configuration file in HISOE. SCC Interface specialists will have to set these. Use of HIS Patient types. Instead of posting to a MISC field, there is a specific db field for this patient type. OE_normal and HIS config may need to be modified to use this field. MOM: Especially for investigating orders going to/from GIS and for results going to HIS, MOM console is used

Interfaces Robotics – interfaces are now in DMI Dead space for instrumentation was previously taken from container setup, now defined in workstation setup. Each robotic interface should be thoroughly tested for changes in configuration. Reference labs setup and use. Each reflab must be set up as a Location with specific characteristics in Additional Information (interfaced and non-interfaced). All use Tasklist now Instrument Interface Setup check conversion to new Translation Table and Result Adjustment Rule tables used in 4.5. Add containers to Translation table and review flags. QC setup differences

Multisite Tables Not all the same tables from 4.0.x are there anymore! Depot table replaced by Ordering Location/Collection Center table (OLCC) More information available Time zone can be entered Adding “site” is critical. Test Catalog – if pulling the test catalog from outside of OE, the site associated with the terminal’s OLCC will be used. Instant Report headers/logos. In 4.0, there were dedicated autorep servers for each site. In 4.5, regardless of what site they are logged in to, autorep will pull the report Logo/header based on the site attached to the OLCC for the order Best workflows including having regular OLCCs AND having specific OLCCs for departments in the lab (for tracking purposes). OLCC still must begin with same first letter as region, but can have up to 11 characters; 5 characters is recommended if SoftBANK is present Environment Setup Table – just FYI – only lists environment numbers and what they are generally associated with. Doctor HIS setup table removed.

Microbiology Micro rules need to be reviewed Review existing auto-resulting worklists. There is now new setup available in 4.5.4 that allows one single worklist to be defined with various intervals at which to update (eliminating the need for multiple auto-resulting worklists). Old worklists should be removed from setup and the print scheduler should be adjusted accordingly. Review defined Epi runs - both in Epi reports and any defined on scheduler. Review call procedure. Micro calls can now be triggered via rules. It may require rules to be defined. Review flagging of significant or critical results. Delta checking between orders can now be defined via SDR rules. Review gram stain/culture cancel policy; automatic cancellation of tests can be performed based on the result of another test. Integrated Epi reports for both Lab and Micro

And Remember… Patient data will not be converted, but will be stored in an archive database, accessible from many screens. You will also need to determine what Quick Access Bridges to their 4.0 system they would like to have available from the Tools option in Lab/Mic. Removal of old setup is important. The 4.0 system and patient information will not be accessible in anything other than for viewing and printing from the 4.5 system. Therefore, old files can be removed to remove clutter and allow future use of previously used IDs. SCC can remove most of these by a script.Items to consider removing include: Inactive and expired canned messages Inactive tests – include updates to templates and reports Expired reference ranges Inactive Lab RBS rules and Micro rules. Other inactive setup files may be removed; Doctors, Drugs, Organisms, Keypads, Templates

Validation Plan Execute Validate System Validation plan – including test scripts for testing scenarios, Unit testing and Integrated testing . Leave adequate time for validation and integrated testing. Assume everything in your system needs to be validated Plan Execute Validate