10/2017_Storage Capacity Auction_SW Spread Price Based Product

Slides:



Advertisements
Similar presentations
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Advertisements

© Copyright 2010, The NASDAQ OMX Group, Inc. All rights reserved. UK FINANCIAL FUTURES SOLUTION FOR SECURE AND PROMOTE OBLIGATED PARTIES.
1 Valuation and Hedging of Natural Gas Storages Ali Sadeghi March 2011.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Foreign Exchange Foreign Exchange Market Exchange Rate Appreciation/Depreciation Effective Exchange Rate Trade Weighted Dollar Real Exchange Rate Interbank.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Regulatory Update Questar Gas Company Annual Account Management Customer Meeting Barrie L McKay September 16, 2014.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Central European Gas Hub OTC DEVELOPMENT Volumes Traded in July 2009: 1.78 bcm Churn rate in 2009 at 2.91 on average 1475 nominations per.
Market design and market power in wholesale electricy markets Guido Cervigni IEFE-Bocconi University, Milan CEEM – Summer School on Economics of electricity.
Stogit.it Injection Phase Changes in force from 1 st April 2014 Crema, 13 th March 2014.
Transfer & Trades Special Transmission Workstream
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Chapter Nine Foreign Currency Transactions and Hedging Foreign Exchange Risk McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
CEC Workshop January 24, 2003 January 24, 2003 Chris Price Market Development Wild Goose Storage Inc.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Auction Format and Fiscal Terms New York Task Force Meeting April 28,
Inflation Report August 2016 A monetary policy package to support the UK economy.
Enron Energy Outlook Interested in global energy market statistics and projections? View online or download in Adobe ® Acrobat.onlinedownload.
Washington Gas Winter Preparedness Paul S. Buckley - Director, Rates & Reg Affairs Nimmie S. Hickman - Manager, Gas Planning September 22, 2004.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Fuel Cost Components for Resource Mitigation
Fuel Cost Components in the Fuel Adder
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
Customer Select Supply/Storage
Fuel Cost Components in the Fuel Adder
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
The Value of Flexibility*
10/2017_Storage Capacity Auction_Fixed Price Based Product
Gas Storage in Northwest Europe
Fuel Cost Components in the Fuel Adder
Transparency Project GRI NW Region
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
The Currency Market: Lecture 2
Entry Capacity Overrun price calculation
Txho/10627 HLP089.PPT DSWG LaaR Update May 13, 2005.
Capacity Market – Introduction & Illustration
Putting the Energy into e-commerce™
26th IG meeting 23th January 2014
Storage Market in CEE- National and regional stock check
Allocation of Capacity in Portugal Under the New Regulation
Market Overview 31 March 2016 year.
Market Overview 31 March 2017 year.
CMP Transparency Requirements
APEx Conference 2016 October 12-14, Medellin Panel 1 – Value of Markets and Future Development Presenter: Restricted.
Allocation of Capacity in Portugal Under the New Regulation
Customer Select Supply/Storage
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
41st IG meeting 24th January 2017
AB “Energijos skirstymo operatorius” Financial results for 6 months of
Warmup John’s billing cycle started on Aug 4th. His beginning balance was $ He had the following transcations: Aug 10 spent $54.96 Aug.
Day-ahead market coupling
Intraday cross border continuous market and optional Intraday auctions
41st IG meeting 24th January 2017
Transmission Workgroup June 7th 2012
EURELECTRIC transparency requirements
Entry Capacity Transfer and Trade
DAILY CAPACITY PUBLICATION
Intraday cross border continuous market and optional Intraday auctions
Information Provision for Transitional Exit Capacity
PRISMA General Information
Stefan Leedham Transmission Workstream 2nd November 2006
Technical Committee Meeting March 18, 2016
Group of NTS entry/exit points Types of gas transmission services
2019 Natural Gas Outlook Oregon Public Utilities Commission
Presentation transcript:

10/2017_Storage Capacity Auction_SW Spread Price Based Product MND Gas Storage a.s. September, 2017

Auction bundle - Basic data Capacity 110 GWh Max. withdrawal rate 2 800 MWh/day Max. injection rate 2 050 MWh/day Contract duration 1 - 5 storage years (start 1.4.2018) Network Operator Net4Gas Type of Product Fast 50/70 Multicycle Financial Deposit 0,15 EUR per each requested MWh (max. 16 500 EUR)

Storage Fee_SW Spread based PU = SW Spread + K; PU … unit price €/MWh/storage year SW Spread … determined during the index period and inserted into the formula. The spread is determined for each day of this period for which the required forward quotations at NCG market are published in ICIS European Spot Gas Markets (ESGM) SW Spread = (Bid NCG winter + Offer NGC winter)/2 – (Bid NCG summer + Offer NCG summer)/2; SW SpreadMIN = 1,20 €/MWh From the sum of the SW spreads determined each day (according to the price formula) the rounded arithmetical average is then calculated. SW Spread average is rounded for 2 decimal numbers, where 0,01-0,05 = 0,05 and 0,06-0,09 = 0,1 Index period: November 2017 – March 2018 K … represents a progression coefficient according to storage capacity auction result; K = +0,05 €/MWh at the beginning of storage capacity auction; Auction step = 0,05 € /MWh

Variable Fee Depending on the working gas volumes injected by the customer, there is an additional variable fee. 0,35 € per 1 MWh of injected working gas

Withdrawal Product Curve

Injection Product Curve

Period for Daily Firm Capacity Unbudled services 1/3 Daily Firm Capacity Can be added to the capacity on top of your existing contract Period for Daily Firm Capacity Withdrawal Capacity Injection Capacity Day Ahead/reservation until 6 pm gd-1 [€/MWh] 1.4. - 30.9. 0,42 0,65 1.10. - 31.3. Intraday/reservation from 6 pm gd-1 until 12 pm gd 0,46 0,73 gd … gas day Daily firm capacity can be reserved up to 90 days in advance

Period for interruptible capacity Unbudled services 2/3 Daily Interruptible Capacity Available interruptible capacity depends on actual nominations for firm storage capacity and technical capabilities of storage.  Available interruptible capacities are shown on web pages of MND Gas Storage: http://www.gasstorage.cz/en/operation-information Period for interruptible capacity Withdrawal Capacity Injection Capacity Day Ahead/reservation until 6 pm gd-1 [€/MWh] 1.4. - 30.9. 0,35 0,45 1.10. - 31.3. Intraday/reservation from 6 pm gd-1 until 12 pm gd 0,39 0,57 gd … gas day

Temporary working gas volume Unbudled services 3/3 Temporary working gas volume can be added  to the WGV on top of your existing contract Time period WGV Price Available from Available until GWh [€/GWh/day] 1.12.2017 31.8.2018 100 2,3

Other services Commercial Dispatching of MND Gas Storage Germany offers you purchase of transportation capacities on behalf of your company in accordance with customer‘s needs (quarterly, monthly, day – ahead capacities). Price = flat rate + variable rate (based on purchased MWh)