Work programme topics addressed:

Slides:



Advertisements
Similar presentations
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Advertisements

Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
E-Safety 29 April 2002 e-Safety High-Level Meeting Brussels 25 April 2002 CONCLUSIONS.
Researchers nights Information Day Colette RENIER Research Executive Agency FP7-PEOPLE-2010-NIGHT INFORMATION DAY Brussels, 12 November.
MIRA - WP 2 Observatory of Euro-Med S&T cooperation White Paper Coord. IRD (France) CNRS (Lebanon) MIRA Mediterranean Innovation and Research coordination.
2-Stage procedure: special attention to the 1st stage, how to build a successful proposal Caterina Buonocore Health National contact Point for Italy “
CIRAS PROJECT OVERVIEW
Probabilistic Adaptive Real-Time Learning And Natural Conversational Engine Seventh Framework Programme FP7-ICT
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
Project funded by The European Union Government of the Republic of Serbia European Integration Office INDUCTION TRAINING SEIO GENERAL FRAMEWORK CREATED.
National Tempus Information Day, December 16, 2009, Belgrade Governance and Management Reform in Higher Education in Serbia GOMES Structural Measures 2009.
Date of presentation 1 PROJECT IDEA Topic: (please give the objective of relevant challenge of the ICT work programme) Type of Project: (STREP or IP) Project.
NIS-NEST Information days on FP7 2 - How to prepare a competitive EU research proposal NIS-NEST Information days on FP7 2 - How to prepare a competitive.
Horizontal Research Activities involving SMEs Joachim Ball, European Commission, DG RTD B3 n Co-operative Research n Collective Research General Introduction.
STAKEHOLDERS ACTING TOGETHER ON THE ETHICAL IMPACT ASSESSMENT OF RESEARCH AND INNOVATION Dubravka Vejnović Center for the Promotion of Science Expert associate.
©M. Horvat, BIT, AT - Nr. 1 How to participate in the 6th EU Framework Programme Manfred Horvat BIT - Bureau for International Research and Technology.
How to write a successful proposal
London workshop clean fleets IEE/11/907 (Project Officer) (Financial Officer) Executive Agency for Small.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
1 Framework Programme 7 Guide for Applicants
Jana Gudurić, 1014/2009 Slobodan Marković, 1039/2009 University of Belgrade, Faculty of Mathematics, Belgrade.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Project Sponsor Project Manager 04/24/ Major Projects Quarterly Review.
Packaging & Distribution Project Summary Report Project Name: Brief Project Description: The Packaging and Distribution Project can deal with three different.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
Title: Climate change impacts on Arctic economy and society Acronym: CLIMARES Coordinator: Ola M. Johannessen, Deputy Coordinator: Stein Sandven Project.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
6-7 / 3 /2006 INSEAD Campus - Fontainebleau WP5: Exploitation and Dissemination General approach and scheduling on deliverable: D5.1 Dissemination and.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
SAFESPOT Project Kick off Meeting February 16 th and 17 th 2006 Rome 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart.
SYSTEM FOR COLLECTING AND ANALYSING SPORT STATISTICS Small or medium scale focused research project (STREP) Date of preparation : Work programme.
Challenging students to acquire deeper knowledge in HCI course N. Ackovska and M. Kostoska 15 th Workshop on “Software Engineering and Reverse Engineering”
System for Collecting and Analysing Sport Player Physical Data Small or medium scale focused research project (STREP) Date of preparation :
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
S AFE W AY F ACULTY OF M ATHEMATICS U NIVERSITY OF B ELGRADE S ERBIA Ivan Merdović, Nikola Djaković
Summary Report Project Name: Platform Implementation Project (PIP) Brief Project Description: –The Platform Implementation Project will coordinate Open.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
ARTEMIS Industry Association Title Presentation - 1 DEMANES Design, Monitoring and Operation of Adaptive Networked Embedded System Matthijs Leeuw
ARTEMIS Industry Association Title Presentation - 1 TOWERLESS Aerodrome Traffic Control with Remote Control Center Daniel Arribas de Heredia.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Date of presentation From ideas to proposals… 1 LAND OF IDEAS (think of a problem) CHECK (B) Work Programme (A) Call Text (C) State-of- the-Art (D) IMPACT.
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
Automatic manufacturing systems project I. KMAGP12ANC L: András Boráros-Bakucz.
Software platform for matching and planning for carpoolers
PLANNED ACTIONS – UPCOMING DUTIES
Design, Monitoring and Operation of Adaptive Networked Embedded System
Packaging & Distribution Project Summary Report
OptiFrame WP7: Implications for Decision Makers and Dissemination of results LANCASTER UNIVERSITY Centre for Transportation Systems and Logistics (CENTRAL)
Concept of ACSF TAN (Type Approval Number)
Enterprise Content Management Owners Representative Contract Approval
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
ASSTAR Project Overview & User Forum Objectives
Theory, Tools, and Obstacles
NPA eMS application – Project Information
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
The ERA.Net instrument Aims and benefits
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Coordination and Support Actions
Understanding logic, structure and documentation of the project
Appraising result framework
Presentation transcript:

Work programme topics addressed: Braking Assistant Type of funding scheme: STREP Work programme topics addressed: H2020-EU.3.4-SOCIETAL CHALENGES – Smart, Green and Integrated Transport Name of coordinating person : Dragutin Ilić Faculty of Mathematics, University of Belgrade dragutin_ilic@yahoo.com

Table of contents Project partners Proposal abstract Concept and objectives Work packages – Gantt chart Work package list Milestones Summary of effort Ethical Issues

Participant organization name Project partners Participant no. Participant organization name Part. short name Country 1.(Coordinator) Faculty of Mathematics, University of Belgrade www.matf.bg.ac.rs MATF Serbia 2. Faculty of Electrical Engineering, University of Belgrade, www.etf.bg.ac.rs ETF 3. Nissan Motor Corporation, www.nissan-global.com NMC Japan 4. Massachusetts Institute of Technology, web.mit.edu MIT United States 5. Alphabet, Inc., abc.xyz ABC.XYZ

Project partners

Proposal abstract Number of vehicle increases over the years Increased number of traffic accidents Usually human factor is the cause Braking assistant – great impact on safety

Concept and objectives Designing an algorithm Developing a practical input/output system adjusted to standards of every vehicle Testing software on different kind of vehicles and in different conditions Product marketing

The overall strategy of the work plan The project is organized in 7 work packages as follows: WP0 Project management WP1 Development of system architecture WP2 Definition of the input / output WP3 Testing and tuning WP4 Releasing the product WP5 Informing the scientific and technical environment WP6 Impact on the environment

Gantt Chart

Work package list WP0 MGT 1 30 M1 M12 WP1 RTD 3 WP2 WP3 2 WP4 DEM WP5 Package No Work Package Title Type of activity Lead partic. No Lead partic. short name Person - months Start month End month WP0 Project management MGT 1 Matf 30 M1 M12 WP1 Development of system architecture RTD 3 Matf, Mit, Etf 50 M7 WP2 Definition of the input / output 25 M6 M8 WP3 Testing and tuning 2 Abc.xyz 80 WP4 Releasing the product DEM 5 M11 WP5 Informing the scientific and technical environment 20 WP6 Impact on the environment Nmc   TOTAL 230

Work package(s) involved Milestones 1/2 Milestone number Milestone name Work package(s) involved Expected date Means of verification M0.1 Checking on optimization of the reporting processes involved in the project (deadlines) WP0 M6 M0.2 Checking on optimization of the control processes involved in the project M12 M0.3 Checking on optimizing finances of the project M1.1 System architecture defined WP1 M3 Architecture specification. M1.2 Checking implementation without bugs M7   M2.1 Checking on specification of hardware and software throughout the target market WP2

Milestones 2/2 M2.2 WP2 M8 M2.3 M3.1 WP3 M11 M4.1 WP4 M12 M5.1 WP5 Checking implementation on of algorithm for all possible platforms WP2 M8   M2.3 Checking whether the maintenance plan covers all possible troubleshooting regarding the possible hardware and software problems M3.1 Testing and tuning SW and SW compatibility with HD WP3 M11 Testing of whole system M4.1 Project marketing WP4 M12 M5.1 Checking on number of papers, number of participants at workshops (min 20 per workshop) and at scientific symposia (min 40), number of public presentations in media WP5 M6.1 Checking the techno economic impact of the final product in the market environment WP6

Summary Effort Table Partic. no. Partic. short name WP0 WP1 WP2 WP3 Total person months 1 MATF 30 25 10 50 5 20 140 2 ETF 3 NMC 4 MIT 15 ABC.XYZ Total   80 230

Summary effort pie

Ethical Issues No direct ethical, legal, social and safety issues “Accidents Bring Tears, Safety Bring Cheers”

You can find me at mailto:dragutin_ilic@yahoo.com Any questions? You can find me at mailto:dragutin_ilic@yahoo.com Thanks!