TRENCHLESS TECHNOLOGY

Slides:



Advertisements
Similar presentations
Alireza Mahdizadeh - Jamaledin Borzouie
Advertisements

Close Fit Pipe Lining. Overview Close Fit Pipe Lining is an internationally recognised technique which involves inserting a compact pipe or sleeve into.
Excavating and Lifting Part 2
S URE FIT ® / R.TEC ® CLOSE-FIT-LINER AGRULINE. CONTENTS  Introduction – current situation  Production  Installation  Advantages  Quality assurance.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
Environmental Drilling By: Josh Humphreys October 8,2006.
Technology Settlement Investigation using FutureScan Lindsay Ivey Burden.
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Introduction to Trenchless Methods
Ground Loop Design. Heat Sources Horizontal ground loops  Collector pipework laid horizontally  Requires large land area  Cost.
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G PIPE EXPRESS ®. New method for environmetally-friendly.
GROUNDWATER CONTROL.
PILING IMPLICATIONS FOR A NEW INDUSTRIAL DEVELOPMENT ON A CLOSED LANDFILL SITE By Michael Redfern.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Eng. Malek Abuwarda Lecture 5 P1P1 Construction Methods Lecture 5 Excavating and Lifting.
Basic Civil Engineering-Foundation
PILE FOUNDATION BY-.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.
TRENCHLESS TECHNOLOGIES Submitted By:- Kamaldeep Gupta C-3.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Technology brought to you by. Pressure Pipe Repair & Relining Solutions using Redline Technology.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
PROF. DR. FEVZİ YILMAZ Fatih Sultan Mehmet Vakıf University, Faculty of Engineering, İstanbul ICSG ISTANBUL 2015, APRIL.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Torino, March 1998 ANCIT WORKSHOP Telecom Italia experience with the use of NO-DIG techniques Renato Polidoro Giovanni Ciochetto.
Standard CLG – Pipebursting Method Machine and insertion pits are excavated at the ends of the deviated sewer section and a rod pusher/puller and RSI Rotary.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Sanitary Engineering Lecture 13
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
TRENCHLESS TECHNOLOGY GUIDED BY PRESENTED BY Ms. PRAJEESHA.M.P DEEPAK.C Lecturer. Semester 7,Civil Department of Civil Engineering. Roll No:58.
PILING TECHNIQUES.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Concrete Repair.
Piling.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
M.E. CONSTRUCTION ENG. & MANAGEMENT
Extending the life of essential sub surface assets
SUSTAINABLE DRILLING OF OIL & GAS WELLS
INTRODUCTION TO TRENCHLESS TECHNOLOGY
BOX JACKING.
Leakage control in transmission pipelines
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
TRENCHLESS TECHNOLOGY (TT) IN SMART CITIES
A PRESENTATION ON “TRENCHLESS TECHNOLOGY” Presented by S.Mounika N.V.Prasad (132U5A0112) (122U1A0157) IIIyr-Civil IIIyr-Civil.
Drilling Rig Accessoires and Tools
Petroleum and it's Exploration
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF TUNNEL PROJECTS
B.V.Patel Institute of Technology-Diploma studies
Horizontal Boring Machines
AM-LINERII® INSTALLATION PROCEDURE Charles A. Munson 9/21/2018.
CONSTRUCTION METHODS & TECHNOLOGY
TRENCHLESS TECHNOLOGY
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
Investigation of pipeline failure
An Introduction to Subway Construction Technology
ASSESSEMENT AND REHABILITATION OF STRUCTURES
PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe.
Presentation transcript:

TRENCHLESS TECHNOLOGY Rohit Chaurasia 71/08

WHAT IS TRENCHLESS TECHNOLOGY? Trenchless technology is basically making tunnel below the surface and installing service lines like gas pipes or telecommunication cables without disruption to flow and minimum damage to the environment.

TRENCHLESS TECHNOLOGY METHODS New Installation Rehabillation and Renovation

New Installation Microtunelling Horizontal directional Drilling Short Drive System Guided Drilling

Microtunnelling Remote controlled mechanical tunnel systems where the soil is removed from cutting head with the new pipe line which is advanced by pipe jacking

Horizontal Directional Drilling Genraly used for installing pressure pipes under major obstacles like large rivers, airports etc. Tunnels of approximately 1.5 km long and of up to 1200mm diameter can be made with the help of horizontal directional drilling.

Short Drive Systems Auger Boring Impact Moling Rod pushing Pipe Ramming

Auger boring Auger Boring also known as “bore and jack” It involves simultaneous jacking a steel case forward while removing soil via rotating auger flight.

Impact Moling Moling is a method, which forms the borehole by compressing the Earth that immediately surrounds the compacting device.

Rod pushing Rod pushing is the technique in which bore of 50mm diameter is formed by displacement . It is used for the installation of pipes of 15mm diameter over 30-40 mm lengths.

Pipe Ramming Pipe Ramming, the pipe is rammed through the soil by using a device attach to the end of the pipe. This method is not suitable where there are solid rock formations. Usually up to 2000 mm diameter pipes can be laid by this technique.

Guided Drilling Guided drilling employs the excavation or soil displacement with compact light weight rig for rapid mobilisation.

Rehabilitation & Rennovation Pipe Bursting Pipe Eating Relining the existing pipes Localised repair Sliplining

Pipe Bursting An existing pipeline can be replaced with pipeline of the same or larger dimension without opening the ground.

Pipe Eating Pipe eating is online microtunnel replacement technique. The existing pipeline is crushed and removed through a new pipeline.

Relining the Existing Pipes This method require access, usually by manholes, at both end of the pipes. Pipe is relined at the places where the joints have moved or sections are missing ,but the passage should be available.

Localized Repairs Local defects may be found in pipes are due to cracking or joint failures. Chemical grouting with urethane and similar materials are used in sewer rehabilitation.

Sliplining A new pipeline of smaller diameter is inserted into the defective pipe. The inserted pipe is then expanded to fit tightly against the existing wall.

Pre-requisites Site investigation Condition survey Underground detection

Advantages of “No-Dig” Technology Reduces damages of valuable surface. Save resources. Accident free. Avoids traffic jam Reduces impact on environment. Saves underground space.

Conclusions With all round developments in various fields like petrochemicals where conveyance of gas, crude and refined products over long distances is common, telecommunication and water supply and sewerage etc. It is becoming increasingly necessary that these lines are laid underground leaving space above surface comparatively free. i.e., Adoption of trench less technology is the only remedy.

Thank you THANK YOU