The use of ground safety nets as part of a global SMS strategy

Slides:



Advertisements
Similar presentations
Building Entrepreneurial Capacity for Agriculture
Advertisements

J. David Tàbara Institute of Environmental Science and Technology Autonomous University of Barcelona Integrated Climate Governance.
Cities and Green Growth OECD Green Cities Programme
Robert L. Helmreich, Ph.D. FRAes The University of Texas
1 The role of human in ATM automation: a key issue Alain Printemps head of DNA/CENA.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Advanced Qualification Program - AQP
ICAO European Regional Runway Safety Seminar Amsterdam, The Netherlands 8 March 2012 ir. Job Brüggen, LVNL safety manager The global voice of ATM.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Logistics & Channel Management
Humans in safety critical systems
HAZARD AND RISK ASSESSMENT. Today’s Session 1.Taking a look at hazard and risk assessment. 2. Definitions. 3.What hazard and risk management does for.
Nicosia, May 15th, th International Conference Challenges facing aviation safety - An airlines’ perspective.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
Economic Development in Cambodia: Toward Pro-Poor? By Heng Chou Cambodian Rehabilitation and Development Board Council for Development of Cambodia “Dialogue.
Graz, Austria Johan Jönsson, MSocSc., Ph.D. Student, Lund University Introducing medarbetarskap, leadership, and safety culture as concepts.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Development of Indicators for Integrated System Validation Leena Norros & Maaria Nuutinen & Paula Savioja VTT Industrial Systems: Work, Organisation and.
Institute for Transport Studies FACULTY OF ENVIRONMENT Human Factors Natasha Merat Associate Professor Institute for Transport Studies University of Leeds.
Ch Copyright © 2011 Pearson Education. Strategic Management: Concepts and Cases Arab World Edition Fred R. David Abbas J. Ali Abdulrahman Y. Al-Aali.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
1 Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space ERASMUS project Project overview Aeronautical Days - Vienna June 2006 En.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
“A Truthful Evaluation Of Yourself Gives Feedback For Growth and Success” Brenda Johnson Padgett Brenda Johnson Padgett.
Measuring Sustainable development: Achievements and Challenges Enrico Giovannini OECD Chief Statistician June 2005.
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
FINANCE - A Workforce Strategy for a High Performance Culture Delivering excellence, Engendering trust, Stimulating Innovation, Exemplifying leadership.
Developing a prevention culture on workplace level: the perspective from workers viewpoint Viktor Kempa, Working Conditions, Health & Safety Department.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Human & Organizational Performance – H.O.P.
LECTURE 4: LIVELIHOOD AND RURAL DEVELOPMENT 10 th May 2011.
Educación.es SPANISH PRESIDENCY OF THE EUROPEAN UNION EDUCATION AND TRAINING First Semester 2010 Juan José Moreno-Navarro Director General for University.
1 Oregon Department of Human Services Senior and People with Disabilities State Unit on Aging-ADRC In partnership with  Portland State University School.
Work in Progress Build Safety Together
Roger Lane EUROCONTROL Airport R&D Unit Safety Forum
ASSTAR Overview Jean-Marc Loscos, DSNA
Aircraft Sequencing Problem Near Terminal Area
Safety Forum 2016 Brussels, June 2016
Introduction: The Nature of Leadership
Project conclusions and recommendations Thierry Arino (Sofréavia)
A Risk-based Approach to Training Paul Cheeseman & Kerry MacDonald
Risk Management for Technology Projects
From counting errors to creating organisational resilience in managing safety Matita Tshabalala.
Ground System implication for ASAS implementation
Descriptive Analysis of Performance-Based Financing Education Project in Burundi Victoria Ryan World Bank Group May 16, 2017.
MOIS 508 Spring 2006 Dr. Dina Rateb
The SEEA indicator initiatives A preliminary note
Trade-off between capacity and safety
Workshop on preparations for ANConf/12 − ASBU methodology
The French National Agency on Water and Aquatic Environments
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
Foundations of Technology Mr. Brooks
NBAA Single Pilot Working Group
NBAA Single Pilot Working Group
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 3.
Public expectations and resilience
Safety Management System Implementation
THE TRANFORMING OF A CULTURE Steps to Strengthen the Alliance Between
Societal resilience analysis
ORGAnisational resilience analysis introduction
Gender Statistics Unit
Monitoring and Evaluation of Peace building
Workshop on preparations for ANConf/12 − ASBU methodology
Climate change and water resources in Europe Professor Nigel Arnell
Addison Airport (ADS) Runway Incursion Risk Areas
Political Economy Analysis in Governance Related Projects
A Safety Management System (SMS) is: “A systematic approach to managing safety, including the necessary organizational structures, accountabilities,
Presentation transcript:

The use of ground safety nets as part of a global SMS strategy 4th. SAFETY FORUM Active Safety Nets Brussels June 7th. – 8th. 2016 DSNA PARIS – CDG Ground Safety Nets The use of ground safety nets as part of a global SMS strategy Presented by : Jean-Marc FLON DSNA Paris-CDG – Gal Manager ATS

Outline ------------------------------------------------------------- Introduction : Challenges ahead System’s Performance : A new approach on Safety Management Use of Safety Nets Risk Perception Risk Management Results Way Forward: Enhancing ground/cockpit cooperation CDG’s March 2012 safety event Use of APW in shared threats’ management Conclusion 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

Beyond A-CDM / CDG's Strategy Introduction: Challenges ------------------------------------------------------------- 5/19/2018 Challenges ahead Traffic Growth Pressure on System and Processes (FBC concept) New Procedures increasing Complexity of Operations Automation Issues: Maintaining/Enhancing Safety Performance Human Centered Approach Adaptivity: Resilience vs Brittleness Identifying local rationality and weak signals Shared Approach 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

Beyond A-CDM / CDG's Strategy => A new approach is needed Beyond A-CDM / CDG's Strategy PERFORMANCE: A new Strategy ----------------------------------------------------------- 5/19/2018 Capacity versus Safety: CDG’s Safety Unit Analysis: SMIs on approach Runway Incursions Ensuring a new and shared approach on Risks: Safety analysis : linear model of cause to effect analysis of past unwanted outcomes (limited quantity and quality) System’s Safety considered as intrinsic value (measured by indicators) rather than created by system’s strengths and front line actors adaptivity from which we can learn Blunt edge vs sharp edge perception of negative events Assessing FLA’s Risk perception and Risk management 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

SAFETY NETS: Part of SMS Strategy ------------------------------------------------------------- ATC Safety Nets: Analysis of system’s performance Comprehensive view of “unwanted” events occurences Assessing levels of risk perception Allowing management dialogue on risk management Increased Ground / Cockpit cooperation Remedial loop under certain circumstances Shared threats management and increased ability to recover Integral part of ATC procedures Definition of operating procedures and ground cockpit interface 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 SAFETY NETS: Risk Perception ------------------------------------------------------------- 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 SAFETY NETS: Risk Management ------------------------------------------------------------- RIMCAS (A-SMGCS Level 2) The conflictual clearances issue Type I Type II Type III 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 PARIS-CDG SKPIs: Results ------------------------------------------------------------- Separation Minima Infringements Runway Incursions Typologie HN 2011 2015 % Total 1083 670 - 38 % HN 50 38 16 - 58 % HN 70 356 107 - 70 % HN 80 320 172 - 46 % Significatifs 26 14 Majeurs 15 6 Mouvements CDG-LB 565 146 526 672 - 6.8 % Typologie Incursions 2012 2015 Total 59 48 Type I 14 22 Type II 6 4 Type III 15 8 Errors 5 2 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 Ground / cockpit cooperation and shared threat management is a major challenge for the years to come and can be identified as one of the major axis of improvement of any ATC System and its Safety Performance. WAY FORWARD: Cooperation ------------------------------------------------------------ Fulfilling tomorrow’s demands and Challenges: ATC new environment and Projects Coherent ATC/Cockpit procedures Shared threats management Safety issues have to be shared with pilots Ensure Pilots and ATCOs work together for the same goal Ensure mutual understanding of situation, constraints and challenges 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 SAFETY NETS: Threats’ Management ------------------------------------------------------------- Aera Proximity Warning (APW) The non compliant/unstabilised approaches issue Paris CDG March 13th 2012 Event System definition 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

APW: Implemented System ------------------------------------------------------------ 7000 ft 7000 ft 7000 ft Decision Point 1000 ft ASFC = 3 Nm to touchdown 1 NM 1 NM 6000 ft « You are still too high on final approach, Check your altitude » 500ft 1 NM 500ft 1,5 NM 500ft 4500 ft 400ft 4,5 Nm without alarm 3 ° 5,24 % ILS « standard » FAP at 5000 ft QNH = 14,1 Nm to touchdown FAP at 4000 ft QNH = 11,2 Nm to touchdown 1,5 NM FAP at 3000 ft QNH = 8,2 Nm to touchdown FAP at 2000 ft QNH = 5,1 Nm to touchdown 300 ft Distances : example of 08R RWY 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016 Safety Nets : Conclusion ------------------------------------------------------------- Safety Nets : Tools at the core of Safety Culture and Safety Management process Thorough and comprehensive analysis of “unwanted” outcomes and performance Indicator of variability and trade-offs that are part of everyday job Allows identifying potential weak signals and phenomena of overconfidence and normalization of deviances => Risk Understanding / Acceptability : define marginal boundary. Accountability Safety Nets : Human centered automation No creation of reliance with CTL at the forefront of decision making Assessment of situation and risks and remedial actions using core skills Safety Nets : Increased Ground / Cockpit cooperation Remedial loop under certain circumstances Shared threats management and increased ability to recover In our complex system => Need to ensure Resilience 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

CONCLUSION -------------------------------------------- We live in a world of change and we can’t rely on patterns of past successes Higher levels of productivity will produce more brittleness We have to prepare for production pressure that is coming We have to understand, ensure and direct potential of adaptivity at all levels We have to support a smooth extensibility of our operations and of the system as a whole to ensure its resilience Visite salle de ré écoute? 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016

Beyond A-CDM / CDG's Strategy 5/19/2018 4th Safety Forum – Active Safety Nets, Brussels 7-8 June 2016