PREEV PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Checking & Corrective Action
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Licensing of Nuclear Power Plants in Pakistan
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
Criteria for IEC Standards Gary Johnson Chairman SC45A
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Maintenance Optimisation At Rovno NPP Robert Hudson.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
IAEA - Department of Nuclear Safety & Security
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
CSNCSN Ageing Management and Long Term Operation Programs (regulation, activities, planning, organizational aspects) IAEA SALTO Workshop (28 – 31 May 2013)
G. Sliter, EPRI N. Wilmshurst, EPRI J. Carey, EPRI F. Polaski, Exelon Corp. Nuclear Safety Symposium Seoul, Korea 1 April 2005 Status of License Renewal.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XII Plant renewals, modifications and upgrades, ageing Case Study This material was prepared.
“PREEV” PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION (LTO) 3RD INTERNATIONAL CONFERENCE ON NPP LIFE MANAGEMENT SALT LAKE CITY (USA),
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
BASIC PROFESSIONAL TRAINING COURSE Module XII Plant renewals, modifications and upgrades, ageing Version 1.0, May 2015 This material was prepared.
Status and Prospect of Korean Korea Electric Power Research Institute
IRRS REFRESHER TRAINING Lecture 5
GS-R-3 vs. ISO 9001:2008 Requirements - 4
Version 1.0, May 2015 SHORT COURSE
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
The ORR/RA and the Authorization Basis May 2005 Revision
Development of safety regulations and guides for nuclear power plants
Technical-economical study of Czech NPPs Long Term Operation P
PREEV PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
Flooding Walkdown Guidance
BASIC IRRS TRAINING Lecture 15
GMP Inspection Process
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Ageing Management Session Name: Principles of Ageing Management
Session Name: Ageing Management
Regulatory review and assessment
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
From AS :   Part 4— Commissioning, operation and asset management
RCF Plenary Session 21 September 2018
Regulatory review and assessment
Regulatory Cooperation Forum (RCF) - Plenary 2018
Regulatory Oversight of HOF in Finland
USNRC IRRS TRAINING Lecture 14
USNRC IRRS TRAINING Lecture18
Development of safety regulations and guides for nuclear power plants
Session Name: Ageing Management
TRTR Briefing September 2013
BASIC PROFESSIONAL TRAINING COURSE Module XII Plant renewals, modifications and upgrades, ageing Case Study Version 1.0, May 2015 This material.
EU Food Safety Requirements: - Hygiene of Foodstuffs -
SALTO missions highlights and SALTO collaboration site
Peer Review Service on Safe Long Term Operation (SALTO) IAEA Safety Standards and other reference documents for LTO and ageing management.
4-6 March 2019 Mochovce NPP Slovakia
38th Nuclear Safety Standards Committee 37th Radiation Safety Standards Committee 38th Waste Safety Standards Committee Joint Session 26 – 27 November.
Presentation transcript:

PREEV PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP PREEV PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION IAEA CONSULTANTS MEETING VIENNA, 11-13 APRIL 2012 J.M. FIGUERAS (CSN, SPAIN)

PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP Objective.- To establish guidelines for regulatory inspection of ageing management (AM) analyses and reviews and long term operation (LTO) conditions of structures, systems and components (SSCs) of NPPs based on criteria given in TD-1 “Guide for regulatory criteria on AM and LTO of NPP” To verify regulatory assessment results obtained through application of guidelines in TD-2 “Guide for assessment of AM and LTO of NPP” Scope.- Applicable to NPPs types PWR, BWR, CANDU y PHWR, in all operating conditions

PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP Inspection types.- Guideline TD-3 defines 4 regulatory inspection types, depending on the ageing management period: During design life, PLiM (usually 30-40 years): Type 1: verifications on definition and development of a PLiM or ageing management analysis and review (AMR), related with methodology, organization, scoping and screening of SSC, materials, environments, degradatory mechanisms and effects, definition of ageing management programmes (AMP), obsolescence, etc. In principle it is expected only one inspection, at beginning of plant life. Type 2: routine and periodic verifications on control, application and maintenance of defined AMPs in the AMR, performing document verifications as well as in plant SSCs walkdowns Yearly or biennial frequency, for document verifications and quarterly or half yearly for in plant walkdowns

PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP During long term operation, LTO (usually after 30-40 years): Type 3: verification on definition, scope and development of Integrated Plant Assessment (IPA) [PIEGE in spanish] or its equivalent Plant Life Extension [PLEX] Analysis for CANDU, normally in same aspects as in AMR In principle it is expected also only one inspection, divided in several blocks as needed, at end of design life and before beginning of plant life extension (2-3 years before LTO) Type 4: routine and periodic verifications on control, application and maintenance of defined AMPs in the IPA and the long term review plan [LT-AMR], or its equivalents PLEX and Safety improvement plan [SIP] for CANDU performing document verifications as well as in plant SSCs walkdowns Yearly or biennial frequency, for document verifications and quarterly or half yearly for in plant walkdowns

Areas or aspects to be inspected.- Type 1 inspections (PLiM): PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP Areas or aspects to be inspected.- Type 1 inspections (PLiM): Objective of the inspection Organizational and management aspects Structure of the licensee's organization in relation to ageing management Acquisition and recording of information related to ageing management Monitoring of the licensee’s accepted commitments and commitments introduced by RB (conditions, non-conformities, regulatory requirements, etc.) Scoping and screening of SSCs Results of application of the SSCs scoping and screening methodology Methodological aspects related to PLiM Plan analysis

Type 3 inspections (LTO): PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP (Cont´d) Results of PLiM Plan analysis Process for identification and resolution of Generic Safety Issues (GSI) associated with ageing management Monitoring of improvement proposals (IP) Design modifications (DMs) and replacement of equipment associated with ageing management Supporting documents review Obsolescence management Type 3 inspections (LTO): Same issues as in Type 1, but related to IPA organization, preparation, development and results Inclusion of time limited ageing analysis (TLAA) Reference to phases and content of a PLEX project for LTO, in case of CANDU

Types 2 and 4 inspections (PLiM and LTO): PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP Types 2 and 4 inspections (PLiM and LTO): Objective of the inspection Organizational and management aspects Scoping and screening of SSCs Methodological aspects related to PLiM (or LT-AMR in case of LTO) analysis Results of PLiM or LT-AMR analysis Process for Identification and Resolution of GSI associated with LTO ageing management Monitoring of IPA or PLEX Improvement Proposals (IP) Design modifications (DM) and replacement of equipment associated with LTO ageing management Supporting documents review Obsolescence management TLAA (in case of LTO) Periodic reports of PLiM or LT-AMR Conditions of SSCs

PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP List of Definitions and Acronyms, in coherence with other TDs 1,2 and 4 Figures 1 to 5 and Tables B and C explain particular aspects for ageing management and LTO in CANDU type or PWR/BWR/PHWR type reactors Table A shows topics subject to regulatory inspection for each type of inspection (1, 2, 3 and 4) As Annexes A, B, C, Guideline TD-3 includes Check Lists examples, for documents verification as well as for in plant walkdowns for SSCs

IAEA safety standards: Guide NS-G-2.12, 2009 (Ageing management) PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP Main bibliography.- IAEA safety standards: Guide NS-G-2.12, 2009 (Ageing management) Guide NS-G-2.10, 2003 (RPS) Guide SS-17, 2008 (SALTO) Report “Safety glossary and terminology for NS and RP”, 2007 Other technological countries rulemaking: Rule 10CFR54, 1995 (USNRC) + NUREG-1800, NUREG-1801 and NEI-95-10 Rule 10CFR50.65, 2000 (USNRC) Regulatory document RD-360-CANDU, 2008 (CSNC)

PREEV countries rulemaking: PREEV PROJECT TD-3: GUIDE FOR REGULATORY INSPECTION OF AGEING MANAGEMENT AND LONG TERM OPERATION OF NPP PREEV countries rulemaking: Spanish CSN Safety Instruction IS-22 (2009), Safety Guide GS-1.10 (2008) + 2 internal procedures: PT-IV-105 (assessment) and 223 (inspection) Includes WENRA recommendations on ageing management Brazilian CNEN Standards NN 1.14 (2002), NN 1.26 (1997)