J.-L. Sanchez Alvarez(PSB-EIC)

Slides:



Advertisements
Similar presentations
Kicker SloW (KSW) magnets and Generators PSB 160 MeV H - injection L. Feliciano TE/ABT.
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Eric Prebys, FNAL.  Recall our generic transfer matrix  If we use a dipole to introduce a small bend Θ at one point, it will in general propagate as.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Some ideas to optimise PSB injection chicane Wim, Brennan, Jan, Masamitsu.
PSB H - injection system commissioning J.Borburgh, C.Bracco, C.Carli, E.Carlier, B.Goddard, K.Hanke, B.Mikulec, J.Hansen, C.Maglioni, A.Newborough, D.Nisbet,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
G Bellodi - L4BCC meeting – 26/05/ /05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Operations Machine Simulator.
Summaries and conclusions of the MTE Workshop
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Subject: INJECTION SYSTEM Junction LINAC4-booster
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Experience with beam instrumentation at Linac4
BE-CO Activities for LIU-CPS and LIU-SPS
LINAC4 ADVISORY COMMITTEE
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Online check lists Half Sector Test
LIU / HL-LHC Cost and Schedule Review
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
RF interlocks for higher intensities (LMC 15 June)
LIU-PSB Status and Outlook
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
HALF SECTOR TEST: a test for the future PSB injection
Mike Lamont on behalf of the LSA team
WPs concerned by L4 connection:
MD Studies for LIU PS Injection
CNGS Proton Beam: Introduction
LINAC4 commissioning plans etc.
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Tuesday 9th November 10:02 Fill beams dumped
High Level Physics Applications for LCLS Commissioning
CNGS Primary Beam Results 2011
New page for summary of test status
Wednesday 23/2 Thanks CRYO!!!.
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

J.-L. Sanchez Alvarez(PSB-EIC) Status/Preparation of the Control Applications for L4-to-PSB Connection J.-L. Sanchez Alvarez(PSB-EIC)

Content Generic software Knobs/workingSet YASP Logging Summary Specific software Cruise Control Trajectory display (TOF) Optimizer BLM Fixdisplay Injection BLM survey SIS Linac4 Injection booster Fixdiplay Linac 4 PSB Injection Makerules Generic software Knobs/workingSet YASP Logging Summary

Specific Software Cruise Control HST validation Number of turns (intensity regulator) Instrumentations (BCT,BPM) Chopper PreChopper BSW KSW RF (LINAC 4 + Booster) Reset BCT watchdog BLM Display BCTs, efficiencies, Status BLM HST validation To DO : KSW, BSW, BLM reset, chopper Tables Estimation 0.4FTE (No longitudinal painting)

Specific Software Trajectory display (TOF) Validation in the HST TO DO : Calculation and display of TOF Collaboration BI + OP Estimation : 0.3 FTE

Optimizer Specific Software To do: Injection optimisation with Nelder–Mead method (simplex method) New optimization tool uses a statistical techniques to optimise beam steering. The optimisation algorithm is actually under test on PSB injection. It includes dipoles and it optimises the injection beam transmission tuning >= 2 elements at the same time. We’d like to test soon on the HST. Estimation : 0.3 FTE

BLM Specific Software New fixdisplay for the BLM ring (CO + OP) 32 new BLM displayed History of the sum (injection, ring, extraction). To do: Add 32 new ring BLM Add the injection BLM Injection BLM survey Display the LINAC 4 and injection BLM f(t) Set the 6 thresholds by BLM. WorkingSet and knobs. Estimation : 0.4FTE

SIS Specific Software LINAc 4 SFC (stray field compensation) Source Instrumentation ( Wire Scanners, semgrid) L4T.TKSTR.0124 Survey RF (voltage, phase, …) Acquisition of the bendings, quadrupoles and dipoles. Chopper, Prechopper, Timings,… HST : Limitation of the intensity , BSW, Dump,… SFC (stray field compensation) PSB injection by ring ( To do) Septa, Dipoles, Quadrupoles, BSW, KSW, QSTRIP H0/H- detector Stripping foil Diamond BLM,… Estimation : 0.4 FTE

Specific Software Fixdisplay LINAC4 Injection Booster Acquisition Destination BCT BLM BeamStoppers Status RF Bendings (H +V) PreChopper, Chopper BIS Watchdogs Estimation : 0.25 FTE (OP + CO) Injection Booster injection efficiency H0/H- monitor history Interlocks

INCA Make Rules Specific Software Qstrip + quadrupolar compensation (chicane) Chicane bump in mm Angle and position of the last dipoles (H + V) KSW (1 knob to control 4 power supplies) RF linac4 ?? Estimation : 0.4 FTE (OP + CO + ABP + ABT)

Knobs/workingSet YASP Logging Generic software Estimation : 0.3 FTE New layout of workingset New layout of knobs New workingSet Estimation 0.3 FTE YASP Steering injection line Close orbit Logging Linac4 (Source, RF, Chopper table, timings, power supplies,…) Transfer line (Bendings, Dipoles, quadrupoles, RF,…) Instrumentation (BCTs, BPM+TOF, BLM, H-/B0 detector, chopper table, …) Estimation : 0.3 FTE

Summary To connect the Linac4 to PSB we need 3.6 FTE Fixdisplay applications will be done by CO with the OP specifications MakeRules will be done in collaboration with OP, CO, ABT, ABP We are in good progress During HST different part of the soft will be validated

Spare