LBNF CAD models, Drawings and Component list

Slides:



Advertisements
Similar presentations
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Inner Triplet Review April 2007 Inner Triplet Supports Sonia Bartolomé Jiménez (TS/IC)
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
The integration of 420 m detectors into the LHC
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ATLAS Internal ID Service Integration
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
HL-LHC IT STRING and Series test of SC link
CLIC Civil Engineering Update
STRAW TRACKER SYSTEM CAD STATUS :
ADO-PO section meeting. ADO : Atlas Detector Operation
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Neutrino v2.1 structural assessment
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
PANDA Yoke of the Magnet
INSTALLATION SEQUENCE
Components for the Machine-Interface Regions
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Cryostat design Mechanical design: Thermal screens: Specifications:
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Status of the PANDA Magnet
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Warm structure requirements :
Upgrade Strategy for the Experimental Vacuum Systems
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Status of the PANDA Solenoid Magnet Production in BINP
Roof design Bunker Project CDR
as a prototype for Super c-tau factory
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Assembly drawings Flóra Hajdu B406
Michail Anastasopoulos Lead Detector – Design Engineer
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
DS20k Integration Workshop
Presentation transcript:

LBNF CAD models, Drawings and Component list Christophe Bault LBNF Cryostat, final design review SURF, 21-22 August 2017

Table of content Who Am I and Where Have I Been? Introduction to CAD model of the outer structure Design modification implemented since last review (end of 2016) Assembly process to be prototyped Further design optimization List of outer structure components 8/21/2017

Who Am I and Where Have I Been? Senior Mechanical designer CERN, Experimental Physics Department In charge of LBNF/DUNE Warm cryostat CAD models, in accordance with structural analysis made within EP-DT. Use of CATIA V5 (Dassault systems) CAD system. In charge of proposing a conceptual LBNF/DUNE Warm cryostat assembly process. 30 years of professional experience in mechanical engineering design, 24 years of professional experience in 3d CAD modeling. At CERN since 2001, experience includes 11 years as mechanical designer for various experiment and detector design such as ATLAS LHC Inner Detector project (current and upgrades), NA62 straw chamber, Roman Pot for LHC, etc…, 3d design, manufacturing drawings, follow-up construction, and installation. 8/21/2017

Cad model of the outer structure In accordance with the different structural analysis models made by EP/DT-EO Stp file available: https://edms.cern.ch/document/1828121/1 8/21/2017

Cad model of the outer structure This model has been used by Dimitar to create the 3d model with roof penetration: https://edms.cern.ch/document/1834560/1 8/21/2017

Cad model of the outer structure Dimitar created a set of production drawings: https://edms.cern.ch/document/1834559/1 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Connection between vertical beam and roof beam re-designed for structural reason 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Connection between roof and short wall 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Replacement of central row of beams in the roof, for penetration reasons. For structural coherence, same modification has been made on the floor Roof top view Floor top view 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Corner beams to link small wall and long wall. Add pillars to support corner beams 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Re-design of ground belts 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Access hole region reinforced by adding stiffeners 8/21/2017

implemented since last review (end of 2016) Design modification implemented since last review (end of 2016) Opening for detector insertion: closure process defined (will be shown in installation sequence on August, 22nd) , and design adapted: Top horizontal beam sliced in 3 pieces, Warm membrane with specific reinforcement 2.6m 12.4m 2.5m 8/21/2017

Assembly process to be prototyped Warm membrane: How to slice and connect each side (long wall/short wall/roof/floor). Corners to be defined Design of panel interface for welding Clamps for supporting panels before full membrane is welded 8/21/2017

Further design optimization Warm membrane: Welded ribs for roof panels: to be adapted to the roof penetration layout 8/21/2017

Further design optimization 800mm diameter holes for human access: Proposal made on the current design. Could be adapted following safety request, and the ease of access during the assembly process 8/21/2017

Further design optimization Platforms and ladders: To be adapted to the chosen access layout, and all other services integrated in the cavern 8/21/2017

List of outer structure components To validate the access shaft use To define the material needed for handling along the tunnels To validate the cranes capacity, Document available: https://edms.cern.ch/document/1739475/4 8/21/2017

List of outer structure components Document composed of: CAD model picture with naming 8/21/2017

List of outer structure components Document composed of: A list of components with weight of each, and total weight Extract 8/21/2017

List of outer structure components Document composed of: A list of components with weight of each, and total weight Most critical: Extract 8/21/2017

List of outer structure components Document composed of: For each component, a 3d view with outer dimensions, weight and quantities: 8/21/2017

Thank you for your attention 8/21/2017