IBL Technical Aspects H. Pernegger / CERN.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Tracker Upgrade Week –Sensors Meeting Sensor Production 24. July 2014 Marko Dragicevic.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
1 Heinz Pernegger / LHCC 16/11/10 IBL TDR : Questions and Answers H. Pernegger / CERN on behalf of the IBL collaboration.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
Si Sensors for Additional Tracker
SVT – SuperB Workshop – Annecy March 2010
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Technical Design for the Mu3e Detector
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
WP9 ITS Mechanics and Cooling
TK Upgrade report.
Thin Planar Sensors for Future High-Luminosity-LHC Upgrades
The SuperB Silicon Vertex Tracker
CERN & LAL contribution to AIDA2020 WP4 on interconnections: Pixel module integration using TSVs and direct laser soldering Malte Backhaus, Michael Campbell,
WG4 – Progress report R. Santoro and A. Tauro.
Update on ATLAS insertable B-layer
CF testing pipe & testing plan
3D sensors: status and plans for the ACTIVE project
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

IBL Technical Aspects H. Pernegger / CERN

Introduction IBL detector is physically small (0.2m2 active area) but requires several new technologies The specifications for the IBL are driven by expected radiation fluence, hit rate, proximity to beam axis and tight space constraints The IBL is also a technology step to HL-LHC Radiation hardness (incl. safety factor x2) ~ 5 x 1015 neq/cm2 Frontend IC4: go to IBM 130nm process and improve readout architecture to minimize inefficiency at high hit rates and radiation hardness Radiation hard Sensors: 3D silicon sensors, new planar sensors and CVD diamond sensors as possible options for radhard detectors Readout system: improve data through-put and redundancy. Cooling system & Mechanics: more efficient cooling of sensors+chips and significant reduction in X0 on staves.

IBL Modules Common sensor baseline for engineering and system purposes 3D sensors  Single chip modules Planar/Diamond sensors  Two chip module Module engineering parameters Sensor bias maximum 1000V Power dissipation in Sensor < 200mW/cm2 normalized at -15C Sensor temperature ~ -15C after full irradiation Sensors/Module prototype for ~10% of the detector in 2010/11 Single chip module: Edge < 325 um Double chip module: Edge < 450 um

IBL Sensor Prototyping Will produce qualification modules with planar, 3D, diamond sensors this year as soon as we get FEI4’s to test chip and sensors to IBL specs Main sensors in production for all three technologies: Planar N-in-N conservative edge and N-in-N slim edge (CiS) Delivery Sept 25 Thin n-in-p (HLL, HPK) Delivery End Sept 60 single-chip & 30 double chip modules envisaged 3D Active edge sensors preferred and in production by Sintef/SLAC, CNM, FBK Double sided 3D also in production as backup Sensor deliveries from End Oct 2010 to Spring 2011 60 single-chip modules envisaged Diamond Polycrystalline CVD diamond sensors available from DDL and II-VI (total ~ 20) 6 Delivered and at IZM for UBM, more available 20 single-chip modules envisaged

FE-I4 readout chip (IBM 130nm) Pixel size [µm2] 50x400 50x250 Pixel array 18x160 80x336 Chip size [mm2] 7.6x10.8 20.2x19.0 Active fraction 74% 89% Analog current [µA/pix] 26 10 Digital current [µA/pix] 17 Analog Voltage [V] 1.6 1.5 Digital Voltage [V] 2.0 1.2 Pseudo-LVDS out [Mb/s] 40 160 Reason for a new FE design: Increased rad hard New architecture to reduce inefficiencies (L=2x1034) Biggest chip in HEP to date Greater fraction of footprint devoted to pixel array (~90%) Lower power/pixel: don’t move the hits around unless triggered Able to take higher hit rate: store the hits locally in each pixel and distribute the trigger Submitted July 2010; Delivery confirmed for Sept. 23 Final FE-I4B production chip ~ 1 year from now

FE-I4 Testing and bump-bonding of prototype modules First wafers to IZM for first batch of prototype modules during October and to single-chip test cards for FE-I4 tests 1/2 wafer diced for test on single chip test cards (without sensors) USB based test system for FEI4 chip, module and wafer tests in place Bump bonding with first 8 FEI4 wafers Step 1: demonstrate that FEI4 works with sensors (lab measurements, irradiation, testbeam) (conservative chip thickness) Step 2: Advanced module prototypes with thin chips, multi-chip modules, removal of handling wafers Want to minimize chip thickness to save material: <200mm , target: 100mm IZM devised special handling-wafer technique to allow solder BB of large but thin chips First successful results with 90mm thick chips in ~FE-I4 size chip

IBL Stave and Cooling Stave construction CF Shell (“Omega”) 300mm for stiffness Ti pipe (ID 2mm wall 100mm): light and high thermal conductivity Carbon foam as filler for module cooling Thermo-mechanical tests with prototype staves with CF and Ti pipes nearly completed Pipe + heaters -> measure HTC Stave + heater -> measure thermal conductivity of assembly CO2 cooling of staves with Ti pipes for IBL Based on LHCb design, total power in IBL ~1.5kW Smaller diameter cooling pipe and lighter coolant to reduce mass Lower coolant temperature (-40C) All inside connections welded (Ti-Ti joint TIG and EB) Each stave = 1 cooling loop 3mm CF pipe stave light foam 2mm Ti pipe stave light foam

IBL material budget Radiation length: Module and stave with chip target thickness: 1.16% IST: CF tube center (0.5mm) : 0.28 % (not incl. shielding foil) Total currently: 1.44 % using 250 (sensor) +90 (chip) mm silicon

Stave Flex: power and readout modules Proceed with two designs in parallel at the moment: Multilayer design. Thin Kapton/Al. Prototypes exist - main focus is test and simulation of electrical performance CMD+CLK HV NTC Low voltages HV Ret Data Out Loading of Modules Carry out trial loadings to optimize glue dispersion and module placement Flex connects to module through wrap-around “wing” Wire-bonded after loading to module flex.

Stave support and integration with Beam pipe Integrate staves and services around beam pipe on surface (ATLAS SR1) 4-point support of IBL inside IST similar to present pixel detector

Beam pipe Center (VI) beam pipe with “split flange” Pixel Package VI VA VT Center (VI) beam pipe with “split flange” 25 mm IR Reduced flange diameter to fit with present pixel detector and IST VA section planned to be changed in 2012 shutdown Extraction of present beam pipe with long guiding tube

Beam pipe removal and Installation Problem: BP sags much more than clearance to B-layer once wires are removed Use pre-tensioned Brandeis Long Guide Tube – minimize sagging of BP Exercise and qualify all steps on existing mockup in Bat 180 6 meters Al (!) prototype 55 OD 50 ID with tension rod inside has been built No tension: |y| ~15mm With tension: |y| ~ 2mm

Off-detector: readout VME readout cards are under development ROD card having a Virtex5 controller and Spartan6 data handling chips BOC card having a Virtex5 for all functions Firmware work in progress: developed and define consistent ROD+BOC FW concept PPC in FPGA modeling started ROD FPGA code : explore function and size of code Adoption of existing firmware to IBL usage started BOC detector interface firmware under development (TX and RX) Hardware developments Design of ROD first prototype board has started BOC test board for interfaces is ready S-Link TX Virtex5 Timing, Control, En-, Decoding, … ELMB CAN Bus RX Data from/to ROD

Milestones Detailed Schedule available at sharepoint: https://espace.cern.ch/atlas-ibl/Shared%20Documents/IBL-Schedule-DraftV3-4-14-06-2010.pdf Main dates FEI4 submission : July 2010 sensor choice June 2011 FEI4 Version 2 eng. submission Sep 2011 first prod module Nov 2012 last prod module Sep 2013 Stave loading completed (incl. contingency) June 2014 IBL installation on or after May 2015

Schedule: Chips, Sensors, Modules

Schedule: Staves, Integration, Installation Service installation (USA15 to detector) Plan to install services up to detector during opening in 2012 shutdown Two contingency periods included in schedule Stave completion: 3 months in 2014 End of surface integration: 3 months in 2015

Summary FE-I4 design completed and submitted to IBM. Will receive chips this week – this is a major milestone for IBL project Sensors three sensor technology IBL prototype sensors are in production (planar, 3D, diamond). We will decide sensor technology summer 2011 based on test results with prototype modules and sensor+module production experience Prototype module plan to build significant number (>100) of modules to test bump bonding of thin modules , module performance, module on staves loading and operation of staves Stave we have constructed >10 prototype staves (CF pipes, Ti pipes) and tested thermal performance -> will use staves with Ti pipes and CO2 cooling Material budget: X/X0 = 1.16% of loaded staves, X/X0 ~ 1.5 of IBL with full support Integration and Installation Will integrate IBL around new beam pipe (IR 25mm) on surface Installation of IBL + all beam pipe operations to be exercised on mockup in Bat 18 Installation planned for 2016 shutdown Scheduled completion mid 2015 including contingency

Backup slides

Sensor technologies for IBL Present ATLAS n-in-n sensors were designed to ~1x1015neq/cm2 and we have good production and operation experience with them Their design was modified to become suitable for IBL specs Reduction of dead edges to maximize sensitive area Operation at higher voltages New sensor technologies, which are being developed for HL-LHC, promise significant advantages: Thin n-in-p, 3D silicon, CVD diamonds Active edges or slim edges Lower depletion voltages Less cooling requirements The IBL can benefit from those advantages if we can show that The sensors work well with the FEI4 chip up to highest fluences The modules can be operated reliably The manufacturing of high quality sensors and modules with reasonable yield is possible We therefore decided to prototype a significant number modules with different technologies until the sensor technology needs to be decided for pre-production (~June 2011)

Sensor technologies for IBL Planar silicon 3D silicon Diamonds Slim edge n-in-n Thin n-in-p Prototyping with CiS, HLL, HPK Active edge single sided and double sided Prototyping with CNM, Sintef/SLAC, FBK Polycrystalline CVD diamonds Prototyping with DDL and II-VI 100um N-in-n slim edge Growth side 450um Substrate side Thin n-in-p ATLAS Pixel FE-I3 diamond module