GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
Experiments on Solder Column Interposer: cryogenic cleaning and local laser reflow Irving HAMON, Electronic Materials and Assembly Processes for Space.
Advertisements

GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Watch the following video and answer the questions on your question sheet. Importance of Testing.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
Reliability Assessments Scope Per paragraph of the MAR and PAIP “ When necessary/prudent or when agreed upon with the GSFC Project Office, Glast.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tecnologica Componentes Electrónicos, S.A. Workshop - Laser diodes in Space Slide No: 1 Date: May 11 – 12, 2006 Componentes Electrónicos, S.A. Juan Barbero.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
FDIRC PMTs dimensional tolerance
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
EPU load – same as SIU load except…
GLAST Large Area Telescope:
SLAC DOE Program Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
IPC Compliance Testing (DPA) Methodology
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 cPCI Connector tests Gunther Haller haller@slac.stanford.edu (650) 926-4257

Intro Test were performed to evaluate the quality of the connector pin assembly of cCPI boards Boards used on the test were Crate Power Supply Board (CPS, LAT-DS-01670) 3-u cPCI board Storage Interface Board (SIB, LAT-DS-01675) 6-u cPCI board Crate Backplane 4-slot cPCI backplane (CBP, LAT-DS-01663) Boards were loaded with a full set of cCPI connectors Boards used were from first attempt by AF assembling these connectors on bare boards Issues raised were under-fill and/or voids in the connector pin solder joints Solder-fills were subsequently improved to have dominantly >80% fill with very small percentage of down to ~65% fill However tests were performed with first-attempt boards without touch-ups to obtain results on average of smaller percentage solder fills. Xrays of boards used in the tests are at http://www-glast.slac.stanford.edu/Elec_DAQ/DAQ-Hardware/SIU-EPU/xray/xray.htm Under “Pictures of sample-boards used in original qual connector testing, assembled by AF (non-flight) “

Pins used in the tests The estimates (by GSFC) of the fill of the joints of the boards used in the tests are posted at http://www-glast.slac.stanford.edu/Elec_DAQ/DAQ-Hardware/SIU-EPU/xray/xray.htm Summary Backplane 20-pins 50-60% fill 75-pins 60-70% fill 90-pins 70-80% fill 90-pins > 80% fill SIB 5-pin 40-50% fill 15-pins 50-60% fill 120-pins 60-70% fill 100-pins > 80% fill CPS 20-pins 30-40% fill 15-pins 40-50% fill 30-pins 50-60% fill 15-pins 60-70% fill 15-pins 70-80% fill 30-pins >80% fill

Tester Tester Monitor connectivity of > 150 pins per board 2 each CableScan 512 for a total of 1,024 simultaneous test points Sensitivity: Short < 100 ohm

Environmental Tests Thermal Cycle -20C to +100C (1C/min, limits from EGSE hardware) 5 cycles on each boards (backplane, SIB, CPS) plugged individually into tester, Continuously execute test while changing temperature 20 cycles while boards are plugged into backplane Vibrate to qualification levels while boards are plugged into backplane (in SIU enclosure)

Results (1) Results show that no opens were detected Flight boards have larger average fill and negligible number of pins down to 65% fill. Indicates that even below 65% fill looks sufficient Backplane thickness: 0.115" +/-0.010" Plug-in board thickness: 0.093" +/-.005“ Finished hole size is 32 mil Square Pin dimension is between 15 mil and ~27 mil around the press-fit eye (the pin is thicker around the eye of the press-fit pin)

Results (2) Proto-flight crate was assembled with backplane GLAT2412 and a set of flight SIB/CPS/LCB/RAD750 Passed all tests including TC, vibration, thermal-vacuum, proto-flight limits 1st Flight crate was assembled with backplane GLAT2414 and a set of flight SIB/CPS/LCB/RAD750 Passed all tests including TC, vibration, thermal-vacuum, flight acceptance limits 2nd, 3rd, and 4th flight crate are in assembly (backplanes have been integrated in enclosures, GLAT2429, 2433, 2434) All other backplane are

Conclusion Although the solder connections seem to be fine in visual inspection: Needed to touch-up several very low-fill pins (down to 10%) discovered via xray Still some concern about effects of voids, however there is no indication that these press-fit pins can be solder on 30+ boards and get reproducibly uniform 100% fill on all pins However, the tests so far showed: Solder connections on our cPCI boards are reliable even those having only 30% fill (although limited in number)