Doors. Design features Security Durability Thermal insulation Aesthetics Accessibilitycomfortable access for all »Access to letter box »Access for some.
Advertisements

Portal Framed Construction
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Innovative New Technologies in Building & Construction.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
Rectangular framed structures
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
John Osborne GS/SE March 2013
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Specification & Quantities Estimating
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
ELENA installation progress F. Butin / ELENA collaboration.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Session 1: Identifying Construction Drawings and Drawing Components.
IT-4327/SMB – Bidders Conference
Update on the PSB Cooling and Ventilation Systems
Joanne Macgregor C Lund & Son Ltd March 2016
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Temporary Works – P8 Project Practice.
Identification of the unused cables
Highveld Industrial Park Storage Warehouse No. 3
Dielectric Oil Installations
Product Presentation January 2010.
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
Highveld Industrial Park Workshop No. 5 Information Memorandum
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
Special LS1 day on 12 June 2012, EDMS:
Ways to industry participation in CLIC 24th October, 2017
Highveld Industrial Park Workshop No. 8 Information Memorandum
SR1 cleanroom extension
EHN1 Neutrino Installation Plans
CEDAR Detector Ventilation System Review
IT-4328: Technical Specification
Construction Project Management
East Hall under construction
Pre-Contract Cost Control
CMS Gantry for Detector Lowering
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
RDR Baseline Layouts for Interaction Region
Value of contract: Length of contract: Contract start date:
Introduction DEFINATION :-
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
Far Experimental Hall Hutches Civil Construction
Instruments Shielding Project Installation
Value of contract: Length of contract: Contract start date:
Prices in Civil Engineering
Advancd Measurement and Contract Administration
Presentation transcript:

IT-4337/SMB – Bidders Conference https://indico.cern.ch/event/666976/ 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

Agenda of the Conference 14:00 Welcome and registration at Building 33 (M. Manfredi) 14:15 Transfer to conference room –> 593/R-010 14:30 - 14-50 Agenda, Introduction to CERN and presentation of technical documents (M. Manfredi) 14:50 – 15:10 Working on the CERN site (P. Bonnal) 15:10 – 15:30 Presentation of commercial documents (S. Magnan) 15:30 – 16:00 Questions – Answers (All) 16:00 – 17:00 Visit of the site 17:00 Transfer to Building 33 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO) Outline Introduction at CERN Description of the project Tender documents Key dates and time for completion 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (1) Year of Foundation --> 1954 by 12 European States ; Today --> 2017 Aim of the Organization CERN has 22 Member States. Serbia, Cyprus and Slovenia are associate members in the pre-stage to membership ; Turkey, Pakistan, Ukraine and India are associate members ; Non-member states with co-operation agreements ; Scientific contacts. http://home.cern/about/member-states CERN, the European Organization for Nuclear Research, physicists and engineers are probing the fundamental structure of the universe. They use the world's largest and most complex scientific instruments to study the basic constituents of matter – the fundamental particles 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (2) Location --> Astride the Franco-Swiss border near Geneva Some numbers --> People and Budget in 2016 2’560 Staff and 750 Fellows ; > 12’000 Users ; 1’127.2 MCHF 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (3) An accelerator complex unique in the world Point 1.8 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – general information Extension of building SM18 Site Point 1.8 in France SM18 -SM18 current situation- SM18 Purpose of the extension: Workshop for RF cryomodules and high-power RF tests Extension surface 630 m2 Height (above-ground) 9.56 m Levels Single hall w/o intermediate level Overhead crane (provided by CERN) 10Ton w/ mobile platform. (Height under hook : 5.3m) Extension construction system: RC raft foundations . Metal structure supporting cladding and roofing systems (complaint RT2012) Special features of the project Access road w/ 6m min. passage, Existing SM18 façade to be kept, Sectional doors and services to be provided by CERN Ext.SM18 -Ext:SM18 project : Plan View- - Ext:SM18 project : Elévation- 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – structural system Foundation system: Raft foundation with extra thickness over the edge Structure: Reinforced concrete Raft foundation features: 70m x 8.9m. 25cm thick Extra thickness 90cm x 60cm over the whole edge Mass concrete Up to 1m below the ground level Ground level altimetry: +448.00 = existing SM18 Special features: Insulation panels under raft foundation and against existing SM18 Slope 0.5% towards drain traps Epoxy floor paintwork Surrounding protection wall Charpente métallique / Bardage / Couverture Steel profiles: HEA/HEB/RRW Supply and installation: bolting, sealing in concrete Finishing: 2 layers anticorrosion paint, cat. C3. RAL=SM18 Hot galvanised steel for external Cladding Double-skin metal cladding made of mineral wool panels. Roofing Self-protected waterproofing system on a metal support 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – existing networks Existing networks to be protected under the extension’s footprint Identified networks : Technical service concerned 3x8 ducts in PVC Φ160 HV cables powering the RF cavity – to be protected during the worksite 4 ducts in PVC Φ110 BV cables powering the Point 1.8 site access control – to be protected during the worksite* -site survey- - electric chamber (SM18 side)- -electric chamber (transformer side)- 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – Preparation (CERN) Construction worksite – Preparatory works carried out by CERN Task: Group(s) concerned Planning Impact 2 AHU existing to be removed SMB-SE et EN-CV Nov-17 or Dec-17 Higher Cooling unit temporary displacement (including pipeworks) EN-CV Oct-17 or Nov-17 Existing external lighting disposal EN-EL Ideally on Dec-17 Lower -Location of the 2 existing AHU on the existing SM18 façade- -Cooling unit for the SM18 cleaning room- 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – definition of the work The civil engineering contractor(s) is responsible for the works: Installation of the worksite ; Preparatory works allowing the work to be executed ; Earthworks and backfilling ; Demolition and dismantling ; Pipes and drainage networks, asphalt surfacing, kerbs and road markings ; Protection of existing on-site networks ; Reinforced concrete for raft foundations and walls ; Metal structures (primary and secondary support frame) ; Waterproofing and insulation system ; Facades and insulation system ; Finishing : paintwork (internal and external finishing) ; Joinery (internal and external) CIVIL ENGINEER : Design, Execution and as-built drawings for structural elements ; CONTRACTOR(S) : Execution and as-built drawings for the finishing work, in particular the details of façades, waterproofing, insulation, minor metalwork, doors, etc., and the workshop drawings for the metal structure, including the design of the joints. Responsibility for design : 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – ground conditions Geotechnical report provided in Annexe C of the Technical Specification 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – worksite conditions Access for USERS to be kept free Provisional worksite storage areas Available parking area to be shared w/ site users POINT 1.8 pedestrian site access Provisional worksite fence POINT 1.8 site access for trucks SM18 visitor centre POINT 1.8 site fence Additional storage area TBC Place de parking visitors Trench SL182 Site access limit 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO) 3. Tender documents Administrative documents - Tender Form - Form of Contract - Description and Quantity Estimate (DQE) - Technical Specification and its Annexes: Annex A: Document “Working on the CERN site” Annex B: Construction Drawings (structural engineer) Annex C: Geotechnical report (GADZ, 7532-1, 06/02/2017) Annex D: Requirements for overhead cranes rails, EDMS 1488244 v1 Technical documents 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

4. Key dates and time for completion Key dates --> Intermediate milestones are indicated in §3.4 of the Technical Specification ; Commencement date --> in January 2018 (to be confirmed by a Work Order two weeks before the actual commencement date) ; Time for completion --> 6 months 20.09.2017 IT-4337/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)