CALICE DAQ Developments

Slides:



Advertisements
Similar presentations
Bart Hommels for the CALICE-UK groups Data acquisition systems for future calorimetry at the International Linear Collider Introduction DAQ.
Advertisements

HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
Maurice Goodrick & Bart Hommels, University of Cambridge ECAL DIF: Issues & Solutions Readout Architecture.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea Status of the Data Concentrator.
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
11 May 2007UK DAQ Status1 Status of UK Work on FE and Off-Detector DAQ Paul Dauncey For the CALICE-UK DAQ groups: Cambridge, Manchester, Royal Holloway,
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Update on the Data Acquisition System development in the UK Valeria Bartsch, on behalf of CALICE-UK Collaboration.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
NetBurner MOD 5282 Network Development Kit MCF 5282 Integrated ColdFire 32 bit Microcontoller 2 DB-9 connectors for serial I/O supports: RS-232, RS-485,
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Bart Hommels for the UK-DAQ group Status of DIF, DAQ for SiW Ecal DIF status LDA status DAQ (ODR & software) status CALICE / EUDET DAQ – DESY.
AIDA annual meeting,Vienna, 26th March 2014Václav Vrba, Institute of Physics, Prague 1  design of sensors for production submission  design of the readout.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
Data Acquisition Systems for Future Calorimetry at the International Linear Collider Matt Warren, on behalf of CALICE-UK Collaboration.
Maurice Goodrick, Bart Hommels 1 CALICE-UK WP2.2 Slab Data Paths Plan: – emulate multiple VFE chips on long PCBs – study the transmission behaviour.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Future DAQ Directions David Bailey for the CALICE DAQ Group.
GBT Interface Card for a Linux Computer Carson Teale 1.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
JRA3 DAQ Overview Matt Warren, on behalf of EUDET JRA3 DAQ Groups. Please see the following talks from the JRA3 Parallel Session for more detail: DAQ and.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
11-13th Sept 2007 Calice 1 LDA Protoype Board A Xilinx Spartan board. Will be the basis of a prototype LDA using additional IO boards to interface.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
Monday December DESY1 GDCC news Franck GASTALDI.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Marc Kelly, Maurice Goodrick, Bart Hommels CALICE / EUDET DAQ – DESY CALICE (ECAL) / EUDET DAQ: DIF and LDA Status.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Status of DCC CALICE WEEK University of Manchester September 9, 2008 Franck LLR Polytechnique.
I 2 C FOR SENSORS IN THE DOM Nestor Institute Koutsoumpos Vasileios - Nestor Institute 1.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
Maurice Goodrick, Bart Hommels CALICE DAQ, UCL DIF & intermediate board Intermediate board: Power distribution (& pulsing?!)‏ Clock fanout Level.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
FF-LYNX: 2010 & H Luca Fanucci Pisa, 14 Giugno 2011.
PXD DAQ (PC option) Status Report
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
EUDET Elec/DAQ meeting
Status of the ODR and System Integration 31 March 2009 Matt Warren Valeria Bartsch, Veronique Boisvert, Maurice Goodrick, Barry Green, Bart Hommels,
Status of the DHCAL DIF Detector InterFace Board
Test Slab Status CALICE ECAL test slab: what is it all about?
Status of the Data Concentrator Card and the rest of the DAQ
C. de La Taille IN2P3/LAL Orsay
CALICE/EUDET Electronics in 2007
State of developments on Readout interface of European DHCAL
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
First thoughts on DIF functionality
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
Presentation transcript:

CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET Prototype development path 12-09-2007 CALICE meeting, Prague

DAQ architecture Slab hosts VFE chips DIF connected to Slab LDA servicing DIFs LDAs read out by ODR PC hosts ODR, through PCIexpress C&C routes clock, controls 12-09-2007 CALICE meeting, Prague

ODR and Data Rates ODR is a commercial FPGA board with PCIe interface (Virtex4-FX100, PCIe 8x, etc.) Custom firm- and software DMA driver pulls data off the onboard RAM, writes to disk Performance studies & optimisation 12-09-2007 CALICE meeting, Prague

Clock & Controls Distribution C&C unit provides machine clock and fast signals to ODR, LDA (and DIF?) Clock jitter requirement seems not outrageous (at the moment) Fast Controls: encoded through the LDA-DIF link Low-latency fast signals: distributed ‘directly’ 12-09-2007 CALICE meeting, Prague

LDA and link to ODR Enterpoint Xilinx Spartan3 based dev. board RAM & lots of I/O (including PCI) 1st Prototype is again a commercial FPGA board with custom firmware and hardware add-ons: Gbit ethernet and Glink Rx/Tx for ODR link -probably optical Many links towards DIFs 12-09-2007 CALICE meeting, Prague

LDA-DIF link LDA-DIF link: Serial link running at multiple of machine clock 50Mbps (raw) bandwidth minimum robust encoding (8B/10B or alike) anticipating 8…16 DIFs on an LDA, bandwidth permitting LDAs serve even/odd DIFs for redundancy 12-09-2007 CALICE meeting, Prague

LDA-DIF physical interface clock data control spare data spare control LDA-DIF link physical form factor: Differential signals on shielded twisted pairs Few single-ended control lines HDMI connectors and cabling: high quality, commercially available 12-09-2007 CALICE meeting, Prague

DIF-DIF link Redundancy against loss of LDA link Provides differential signals: Clock in both directions Data and Control connections Two spares: one each direction Plus two single-ended control lines Single LDA-DIF link bandwidth sufficiently large for data of two DIFs 12-09-2007 CALICE meeting, Prague

Draft DIF block diagram not definitive Lots of controls…. 12-09-2007 CALICE meeting, Prague

DIF Functionality Receive, regenerate and distribute clocks Receive, buffer, package and send data from VFE to LDA Receive and decode incoming commands and issue corresponding signals Control the DIF-DIF redundancy connection Receive, decode and distribute slow control commands Control power pulsing and provide watchdog functionality Provide an USB interface for stand-alone running and debugging …..on top of that: all the things we did not think of so far 12-09-2007 CALICE meeting, Prague

DIF implementation The Slab is an integral part of the detector The LDA and ODR are transparent wrt detector type The DIF and its interface to the slab is detector-specific Large parts of the DIF firmware can/should/must be generalised DIF hardware should support firmware to profit from common developments DIF working group to address common problems and share knowledge, experience, and VHDL code 12-09-2007 CALICE meeting, Prague

Opportunity to memorise the acronyms: 12-09-2007 CALICE meeting, Prague

The EUDET prototype Full stack: 15 slabs, instrumented on both sides As close to CALICE technology as reasonably possible 12-09-2007 CALICE meeting, Prague

Prototype development NOW 2008 2009 HaRDROC chip v1 Testbeam DAQ HaRDROC chip v2 New DAQ v1 EUDET proto: detector + DAQ 12-09-2007 CALICE meeting, Prague

Technology prototype for physics results EUDET module is quite a large and complex object. Keep future production in mind: large objects are assemblies of smaller objects develop testable objects Many technology options require even more R&D: power consumption data rate: speed vs. power noise etc. 12-09-2007 CALICE meeting, Prague

R&D for the EUDET prototype Proto-slab: FPGA for VFEs provisional ‘DIF’ for ECAL Tests of signal distribution along long PCB lines: signal deterioration, termination options, speed, etc. Identification of possible issues with many (pseudo)VFE chips on long transmission paths Familiarise with VFE readout architecture 12-09-2007 CALICE meeting, Prague

R&D for the EUDET prototype More to come….. …but let’s look at the DIF design first 12-09-2007 CALICE meeting, Prague