3.3 and 3.4 Applications of Linear Models

Slides:



Advertisements
Similar presentations
Linear Programming. Businesses use linear programming to find out how to maximize profit or minimize costs. Most have constraints on what they can use.
Advertisements

Do Now The cost of renting a pool at an aquatic center id either $30 an hr. or $20 an hr. with a $40 non refundable deposit. Use algebra to find for how.
OPERATIONS RESEARCH LINEAR PROGRAMMING (SOLVED) BY BY APARNA APARNA ASHA.V ASHA.V SARITHA SARITHA JINTO JINTO.
Standard  MM3A6. Students will solve linear programming problems in two variables.  a. Solve systems of inequalities in two variables, showing the solutions.
S EPTEMBER 14, L INEAR P ROGRAMMING Linear programming = a process of maximizing a linear objective function Objective function = gives a quantity.
Linear Programming?!?! Sec Linear Programming In management science, it is often required to maximize or minimize a linear function called an objective.
Objectives: Set up a Linear Programming Problem Solve a Linear Programming Problem.
Systems of Linear Inequalities.  Two or more linear inequalities together form a system of linear inequalities.
Graphing Linear Inequalities
Unit 1 Test Review Answers
Copyright 2013, 2010, 2007, Pearson, Education, Inc. Section 7.6 Linear Programming.
Solve problems by using linear programming.
 A concert promoter wants to book a rock group for a stadium concert. A ticket for admission to the stadium playing field will cost $125, and a ticket.
Opener. Notes: 3.4 Linear Programming Optimization  Many real-life problems involve a process called optimization.  This means finding a maximum or.
Linear Programming: A Geometric Approach3 Graphing Systems of Linear Inequalities in Two Variables Linear Programming Problems Graphical Solution of Linear.
Copyright © 2012 Pearson Education, Inc. All rights reserved Chapter 3 Linear Programming: The Graphical Method.
Set Operations and Compound Inequalities. 1. Use A = {2, 3, 4, 5, 6}, B = {1, 3, 5, 7, 9}, and C = {2, 4, 6, 8} to find each set.
Warm-upWarm-up Sketch the region bounded by the system of inequalities: 1) 2) Sketch the region bounded by the system of inequalities: 1) 2)
5 minutes Warm-Up 1) Solve the system. 2) Graph the solution.
Solving Linear Inequalities Lesson 5.5 linear inequality: _________________________________ ________________________________________________ solution of.
3.3 Systems of Inequalities An inequality and a system of inequalities can each have many solutions. A solution of a system of inequalities is a solution.
Warm-up Solve each system of equations:
Get out your Vertices Worksheet!
Linear Programming Ex1) Use the system of constraints below to maximize the objective function z = -0.4x + 3.2y. Corner Points.
Linear Programming-Bellwork
Ch. 3 Notes Page 19 P19 3.4b: Linear Programming.
Unit 1 Linear programming. Define: LINEAR PROGRAMMING – is a method for finding a minimum or maximum value of some quantity, given a set of constraints.
Linear Programming The Table Method. Objectives and goals Solve linear programming problems using the Table Method.
Warm-upWarm-up Sketch the region bounded by the system of inequalities: 1) 2) Sketch the region bounded by the system of inequalities: 1) 2)
3.4 Linear Programming Solve linear programming problems in two variables using graphical methods.
LINEAR PROGRAMMING 3.4 Learning goals represent constraints by equations or inequalities, and by systems of equations and/or inequalities, and interpret.
1 What you will learn  Lots of vocabulary!  How to find the maximum and minimum value of a function given a set of “rules”
Slide Copyright © 2009 Pearson Education, Inc. 7.6 Linear Programming.
3-5: Linear Programming. Learning Target I can solve linear programing problem.
Linear Programming. What is linear programming? Use a system of constraints (inequalities) to find the vertices of the feasible region (overlapping shaded.
3.3 Linear Programming. Vocabulary Constraints: linear inequalities; boundary lines Objective Function: Equation in standard form used to determine the.
1. Solve this system and find the product of its solutions. x + y = 7 2x – y =8 2. The feasible region for a set of constraints has vertices (2,0), (8,2)
Section 7.5 Linear Programming Math in Our World.
Objectives: Graph (and write) inequalities on a number line.
Linear Inequalities in One Variable
Solve: 1) x + 5 = 9. x + 5 > 9 2) y – 6 = -3
3.3 Linear Programming.
Do Now The cost of renting a pool at an aquatic center is either $30 an hr. or $20 an hr. with a $40 non refundable deposit. Use algebra to find for how.
Introduction to Linear Programs
3.3 – Solving Systems of Inequalities by Graphing
Notes Over 2.1 Graph the numbers on a number line. Then write two inequalities that compare the two numbers and and 9 l l l.
Graphing Linear Inequalities
Linear programming, absolute values, inequalities
Math 1 Warm Up In the Practice Workbook… Practice 7-6 (p. 94)
السيولة والربحية أدوات الرقابة المالية الوظيفة المالية
Absolute Value inequalities
Linear Programming Skill 45.
3-3 Optimization with Linear Programming
Math3H – Unit 2 Day 3 Linear Programming
Linear Programming Objectives: Set up a Linear Programming Problem
Warm Up Graph y = 4x and 16, $10’s and 7 $20’s.
3-4 Linear Programming.
Warm Up Solve for x:
1.5 Linear Inequalities.
Linear Programming Example: Maximize x + y x and y are called
Copyright © 2014, 2010, 2007 Pearson Education, Inc.
Warm Up Graph y = 4x and 16, $10’s and 7 $20’s.
LINEARPROGRAMMING 4/26/2019 9:23 AM 4/26/2019 9:23 AM 1.
Nature does nothing uselessly.
10.8 Linear Programming.
1.6 Linear Programming Pg. 30.
Linear Programming Mr. Carpenter Alg. 2.
Linear Programming.
Notes Over 6.1 Graphing a Linear Inequality Graph the inequality.
Presentation transcript:

3.3 and 3.4 Applications of Linear Models

Solving a System by Graphing

Practice – Your turn. Guided Problem Solving 3-3 handout #1-7 Read and Understand, Plan/Solve/Look Back/Check Backside – Practice 3-3 (on back). #13, 14

Solving a System by Graphing Make a table of the possible values.

3.4 Linear Programming

Writing Constraints 200 hrs for assembly and 108 hours for painting. Example: A manufacturer produces two models of mountain bicycles. The times (in hours) required for assembling and painting each model is given: The maximum total weekly hours available are: 200 hrs for assembly and 108 hours for painting. The profits per unit are $25 for model A and $15 for model B. How many of each type should be produced to maximize profit? Model A Model B Assembling 5 4 Painting 2 3

Graph a system of inequalities Graph the system 1)