w (plf) diaphragm 1 diaphragm 2 R1L R1R R2L R2R v1R v1L v2L v2R SW2 C1

Slides:



Advertisements
Similar presentations
© 2011 Bentley Systems, Incorporated Rakesh Pathak, Ph.D., Software Research Engineer SOURCES OF NONLINEAR DEFORMATIONS IN LIGHT FRAME WOOD SHEAR WALLS.
Advertisements

Framing.
Wood Structural Panels
2006 Residential Code of Ohio
Exterior Walls (Wood).
CE A434 – Timber Design Structural Behavior.
Horizontal Diaphragms
Basic Roof Types and Roof Theory
Skilled Trades 1201 Floor Framing
BCT 122 Roof Framing 1 Roof Framing Procedure Sequence.
10 ft of veneer, out-of-plane (section property, distributed mass) 10 ft wood-stud frame, in-plane (realistic hysteresis) ¼ of mass of 10 ft of in-plane.
Gable, Gambrel, and Shed Roofs
Roof Parapet Details.
Michelle Perticarari Rebeca Peña
1 times table 2 times table 3 times table 4 times table 5 times table
Wall and Ceiling Construction Vocabulary
My Work Plan Carla Dickof.  I have reviewed the literature review done within our group  I am currently reviewing further case studies as well as research.
Light-Gauge Steel Construction Chapter 17. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Laying Out Studs for a Wall
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Task Behavior of Shear Walls
Zheng Li PhD, Assistant Professor Department of Structural Engineering Tongji University Seismic Performance of Timber-Steel Hybrid Structures The Fifth.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Wind Hazard Modeling and the HAZUS Wind Model Part II Carol Hill Louisiana State University November 12, 2004.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Framing the House. Platform Framing Platform framing.
Cladding attachment.
Engineering with Wood Presenters: David W. Boehm, P.E. Gary Sweeny, P.E. Gary Sweeny, P.E. Shear Walls and Diaphragms Why Buildings Don’t Fall Over.
Marieclaire Monasterio Aracelis Cedeño
Chapter 32 Drawing Framing Plans.
On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
Tables Learning Support
ARCH 330 Fall 2008 Third Set Rough Carpentry Wall, Floor & Roof Systems.
Understanding the 2012 IRC Brace Wall Methods
Heel Blocking Requirements and Capacity Analysis
Overdriven Nails in Structural Sheathings Overview.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
At The Fab Lab Three Lakes. MDC 30’ Overton Car Interiors for 3D Printing.
Prepared by John R. Henry, P.E. Senior Staff Engineer
EEP Lec 2 Dr. Michael Nasief.
Prof. Kurtz, Age 7. Prof. Kurtz, Age 7 Prof. Kurtz, Age 7.
Times Tables.
£"'>£"'>.I.I ' ·.· · ·..I.
Woodworking Tools Identification II
Framing the House                                                                                                                   
FIGURE 12-1 Memory Hierarchy
Assignment #3 Group 3.
اصول گودبرداری و ایمن سازی
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
Influence Line Diagrams-I
Location Plans & Site Plans
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Floor Truss Ribbon Board Load Path
TECHNOLOGY HIGH SCHOOL – CAD DRAFTING III – ARCHITECTURAL MODELS
North Shore at Canton The Pennsylvania State University
Earth Science Turn in “Locating an Earthquake” activity from Friday!
How many links? Linkage examples.
Minuteman Vocational Technical Regional High School Progress
•Openings – Gables and Skylights
ARCHITECT I PLACE+PROGRAM I SPACE+ORDER I CONSTRUCTION+EXPRESSION
3 times tables.
6 times tables.
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Solution Free Body Diagram.
Presentation transcript:

w (plf) diaphragm 1 diaphragm 2 R1L R1R R2L R2R v1R v1L v2L v2R SW2 C1 Boundary occurs at interior shear walls! R1L R1R R2L R2R Field condition that must be boundary nailed! Roof Layout v1R v1L v2L v2R Roof Shear Diagram

R= 11,200 R= 11,200 Roof Shear Diagram Roof NailingZones w = 400 plf Roof sheathing 15/32” CDX wood structural panel with 2x framing and 8d nailing 32’ Continuous panel joint 56’ R= 11,200 R= 11,200 8’ 8’ 24’ 8’ 8’ v=350 plf v=250 plf v=150 plf Roof Shear Diagram v=150 plf v=250 plf v=350 plf 8d @4/6/12 fully blocked 8d @6/6/12 fully blocked 8d @6/6/12 fully blocked 8d @4/6/12 fully blocked 8d @6/12 unblocked Roof NailingZones What does “8d @4/6/12” mean? … Please refer to Table 23-II-H