OBOA 2015 ANNUAL MEETING & TRAINING SESSIONS

Slides:



Advertisements
Similar presentations
Presented by Beth Waldman, JD, MPH For the Iowa DHS Remedial Services Working Group Meeting Four December 3, 2010.
Advertisements

Ministry of Public Health and Sanitation Ministry of Medical Services PERFORMANCE REPORTING 1.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
RM of Glenella Public Meeting Amalgamation November 7, 2013.
Blossom Park Condominium Update Code Enforcement Division October 14, 2014.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Contractor Safety Management
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Introduction to the Faculty Evaluation System
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
Service Organization Control (SOC) Reporting Options and Information
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
The GNWT Action Plan – The Levelton Report Jan 18, 2011 Yellowknife 1.
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
A Briefing to the Housing Committee Housing/Community Services Department October 5, 2015.
DPW PRESENTATION TO PORTFOLIO COMMITTEE ON CORRECTIONAL SERVICES 09 FEBRUARY 2010.
City Meter Reader Operations October 22, Agenda Review Current Meter Operations Review Current Meter Operations Annual Number of Meter Reads Annual.
May 13, Site - USGS Topo SITE Source: 2013 Oriental USGS 7.5-minute Topographic Map.
Plans of Correction (PoC) Donna Tiberi, RN Standards Interpretation p: e: 1.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
Kim Gingerich, Office of the Vice-President, Academic & Provost LUNCH & LEARN SESSION ON FACULTY SABBATICALS April 25, 2013.
City and County of San Francisco Department of Human Resources City and County of San Francisco Department of Human Resources 1 City and County of San.
SUCCESSOR AGENCY UPDATES Community/Economic Development Department Presented by: Kymberly Horner, Economic Development Director October 18, 2016.
History of Fifth Avenue Landing Hotel Project
CITY OF HARARE EMERGENCY SERVICES
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Design of a Commercial Shopping Center
Review of Current Ordinance:
Downtown Parking Program Time Limit Evaluation
Designing a Commercial Shopping Center
Financing Project Development
2016 Bowling Green Exterior Housing Evaluation Survey
Skillman Corridor TIF District
Main Street Improvements
THE IMPLEMENTATION PLAN
Fire Protection and Prevention in Ontario First Nations
Global Connections Day Building Safety Service Provider
Valley & Third Streets Redevelopment
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Informal Review Workshop
Overview of the FEPAC Accreditation Process
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Ernest Floyd Foster Foster Seafood 70 Captain Tom’s.
June 26, 2018 The Large Projects are an investment into the future of your community. This investment will result in economic growth, improved quality.
Julie Woosley, Division of Waste Management
City of Ventura Green Building Standards
Establishment and Maintenance of China Business register
WESTERN CAPE GAMBLING AND RACING BOARD - ACCOMMODATION
Results of NSF Data Analytics and Other Audits
115-Unit Mixed-Use Project (711 E
FIRE UPGRADES OF EXISTING BUILDINGS
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
ADA Transition Plan – Brief Overview
Request for Qualifications (RFQ) Architectural & Engineering Services for Seattle City Hall Plaza Restoration CDCM # Presubmittal Conference June.
Presentation transcript:

OBOA 2015 ANNUAL MEETING & TRAINING SESSIONS A Northern Case Study – A Success in Regulatory Partnership (Ongoing)

Aerial View of Subject Property Ste Anne Rd Paris St Elm St Aerial View of Subject Property

SUBJECT PROPERTY Three storey shopping mall – Group D (offices) and Group E (retail); two storey parking garage structure – Group F3 (parking and open air parking) – built in 1970 Attached four storey hotel - Group C (hotel) – built in 1970 Attached two storey office tower – Group D – built in 1973

SUBJECT PROPERTY Attached six storey office tower - Group D – built in 1979 Approximate total square footage is 583,793 Over 700 parking spots approximately quarter of all downtown parking (157,000 sq.ft.) 4” reinforced concrete on 11/2” deep steel composite deck over structural steel framing

SUBJECT PROPERTY 2001 Building Condition Assessment was commissioned by current owner due to purchase of mall through power of sale This report was never disclosed to Chief Building Official (CBO) New ownership problematic to Building Department

CEILING IN MALL MANAGER’S OFFICE

OUTSIDE VIEW OF SAME AREA

INITIAL MINISTRY INVOLVEMENT Ministry of Labour (MOL) receives complaint in December 2012 of water leak Leak was from a blocked rain water drainage pipe MOL inspectors met with mall owners who undertook the repairs All repairs stemming from initial complaint on 2011 construction were completed in April 2013

INITIAL MINISTRY INVOLVEMENT MOL was provided a building assessment report which was done in 2011 Report did not address the issue of structural integrity but did mention leakage in several locations including expansion joints and roof drains During this time, a 2001 engineering report was located which identified structural issues in the mall

MINISTRY CGS PARTNERSHIP MOL met twice with City of Greater Sudbury (CGS) building officials to disclose both reports and review the situation June 4, 2013 MOL issued an order to the mall’s owners to provide an engineer’s report detailing how the issues in 2001 were dealt with, identify structural deficiencies and recommendations for solutions – compliance date was September 16, 2013

MINISTRY OF LABOUR - ORDER September 16, 2013 – mall owner was not in compliance with MOL Order MOL received telephone call by mall manager advising that an engineer had been hired Order was extended to October 7, 2013 providing that a signed contract was submitted to MOL by September 25, 2013 indicating the scope of work Interim report received October 8, 2013 MOL further extends order to November 20, 2013

CITY OF GREATER SUDBURY ORDERS Order to Comply – failing to obtain a building permit for remedial repairs to underside of ramp – issued October 23, 2013 November 4, 2013 another report submitted indicating further work with additional steel for “fail safe design” Third party engineering firm retained by CGS to review remedial steps prior to issuing building permit

CITY OF GREATER SUDBURY ORDERS MOL copied with CGS third party (22) memorandums. Losing patience April 28, 2014 mall hires new Toronto based engineering firm May 7, 2014 – meeting at mall – all parties Engineer’s report dated May 12, 2014 – addressing deterioration of the parking structure – restricting the use of vehicular occupancy

CITY OF GREATER SUDBURY ORDERS Order to Remedy Unsafe Building – P1 and P2 parking areas based on engineer’s report – issued May 14, 2014 Temporary shoring and restriction of parking areas commenced Final condition survey report submitted June 11, 2014 Four year remedial plan by mall’s new engineer accepted by MOL Remediation to the tune of $8-$10 million being monitored currently by MOL and CGS

Shoring of P1 Parking Area

Shoring of P2 Parking Area

P1 Parking Area

P2 Parking Area

PARKING GARAGE

PARKING GARAGE

SUMMARY OF CHALLENGES Mall in receivership for period of time “mortgagee in position” not well maintained Engineers’ reports and work undertaken without benefit of permit Existing structural evaluation difficult because of above Owner’s manager dictating engineering evaluation, scope and design

SUMMARY OF CHALLENGES Engineers not forwarding interim reports for changes in building permit scope Municipality’s lack of specialized skills for evaluating designs, need to retain third party structural engineer ($$) Politics/Economics/Media