Boardwalk Improvement Project

Slides:



Advertisements
Similar presentations
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Advertisements

Update on FCPS Construction/Renovation Projects April 2009.
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
Impact of 30 day hold Cedar Conversion to Elementary.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Galveston Seawall Boulevard Transit/Pedestrian Access and Beautification Program PHASE 2 IMPLEMENTATION UPDATE PHASE 2 IMPLEMENTATION UPDATE February 12,
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
Freedom Park aka Gordon River Water Quality Park.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
FACILITIES, PLANNING, AND CONSTRUCTION NOVEMBER, 2013 CONSTRUCTION REPORT.
Understanding the FHA 203K STREAMLINE AfterBefore.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
PD2 Multiple Deliveries
January 18, 2017 City of San Diego
Filter Rehabilitation and Seismic Upgrades – Construction Update
Major Steps In Building a SFR
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
October 2017 Mustang panther package b update
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Joint Base Langley – Eustis Overview
Creating a Manually- Entered Pay Estimate
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Hopewell Valley Regional School District
FACILITIES, PLANNING, AND CONSTRUCTION
Value of contract: Length of contract: Contract start date:
Meeting of the LCLS Facilities Advisory Committee
25th Avenue Grade Separation
25th Avenue Grade Separation
New White Lake Township Library
Lafayette New Terminal Program Update
Geo Units Formation Dates In Australia
30th Annual State Construction Conference
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
SonRay Construction (aka Sonoran Roofing)
Lafayette New Terminal Program Update
Lafayette New Terminal Program Update
Athletic Field Improvements
Lafayette Airport Commission New Terminal Program Update
21st Century School Buildings Plan
Presentation transcript:

Boardwalk Improvement Project Status Update: 13JAN14 By Ethan Crouch

Background Contract Award Date: 12AUG14 Prime Contractor: Civil Works Construction Award Amount: $991,536.00 Notice To Proceed: 06OCT14 Contract Completion Date: 13FEB14 Note only DIV A (replace existing) awarded, DIV B (northern extension) not awarded.

Boardwalk Improvements Project Overview G F&5 E&4 D&3 H&6 Boardwalk Improvements

Project Overview Highlights New boardwalk double the width of previous boardwalk New beach accesses double width & handicap accessible Additional beach access 4 Trellises & Shade Structures 3 Gazebos Additional walkway to stage/band stand New decking and added a roof to stage/band stand Foot Wash at each beach access Replace showers & add new shower area Lighting on handrails & replace overhead lighting Expanded alcoves for pedestrian access and recreation areas

Current Status of Construction Mobilized Project Site Initial Grading Complete Demolition Complete Bulk of Lumber Material & Hardware Onsite Piling Installation Underway Structural Framing Underway Decking Underway Handrail Underway Stage/Band Stand – Decking Replaced & Roof Framing Complete

Current Status of Construction Boardwalk Improvements Work in Place Open to Public Open to Public Temp Sand Walkway G F&5 E&4 D&3 H&6 Decking Complete Piling Complete Status As of: 01JAN15 Boardwalk Improvements Work in Place

Next Steps Demo landscaping northern section Fine grading northern section Piling installation northern section Structural framing & decking northern section Start Electrical Rough-In Start Plumbing Rough-In Metal Roof for stage

Questions