Value Estimate for the ILC Superconducting Modules and High Level RF

Slides:



Advertisements
Similar presentations
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Advertisements

Cost Estimating for Cavities & Cryomodules – Info needed from contracts for these industrial studies Peter H. Garbincius Fermilab IWLC2010 – Geneve October.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
6-7 April 06 MAC Review Global Design Effort 1 Design Cost Board (DCB) Report Peter H. Garbincius GDE Fermilab.
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
SLAC ILC High Level RF Ray Larsen LLRF Workshop, FNAL, January 17, 2005 Rev. 1.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
LCWS08 (Nov.18, 2008) 18/11/ Proposal of Distributed RF-source Scheme (DRFS) Shigeki Fukuda (KEK) Introduction Consideration of the cost Possible.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Date Event Global Design Effort 1 Cryomodule Technical System Review N. Ohuchi, H. Carter, C.Pagani.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Report of HLRF KOM/ALCPG07 S. Fukuda(KEK) R. Larsen(SLAC)
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
19july06 - Vancouver L.C. Workshop - DCB (PHG) Global Design Effort 1 Report from the Design & Cost Board Peter H. Garbincius* on behalf of: Wilhelm Bialowons*,
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
HLRF Post-TTC Meeting (Fukuda)
ILC Power and Cooling VM Workshop
SCRF WebEx Monthly Meeting Agenda and Reports from PM
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
Preparation for DESY Meeting
Americas KlyCluster Cost Analysis Overview
SCRF Monthly WebEx Meeting Sept. 22, 2010
Chris Adolphsen Sergei Nagaitsev
EDR HLRF Work Packages Draft Summary
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
General presentation about recent status of DRFS
Peter H. Garbincius, Fermilab Chairman, GDE Design & Cost Board
Nick Walker (DESY) EU GDE Meeting Oxford
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Linac LLP Outline LINAC Long Lead Procurements
ILC - Global Design Effort
Presentation transcript:

Value Estimate for the ILC Superconducting Modules and High Level RF Wilhelm Bialowons, Norihito Ohuchi and Kenji Saito · GDE, Shigeki Fukuda · KEK, Raymond S. Larsen and Michael L. Neubauer · SLAC, Richard P. Stanek · FNAL et al January 10, 2007 ILC MAC Meeting Global Design Effort

Master Outline Introduction Costing Rules High Level RF Cost Estimate Cryomodule Cost Estimate Summary January 10, 2007 ILC MAC Meeting Global Design Effort

Introduction RDR Costing Guidelines March 11, 2006 High technology: Items such as cavities, cryomodules, and rf power sources, where there will be interest in developing expertise in all three regions, should be estimated separately for manufacture by each region. Costs should be provided for the total number of components … January 10, 2007 ILC MAC Meeting Global Design Effort

Costing Rules value is world market price if exists One common estimate of the “value” and labor including site dependent cost is made. The definition of the “value” is: Cost estimate of the construction cost but no preparation cost. Cost estimate on the basis of a world wide call for tender, i.e. the value of an item is the world market price if it exists. The selection criterion is the best price for the best quality. One vender supplies the total number of deliverables. Two vendors for the same package could be chosen for risk minimization. Then the parts depend on the bids. If necessary parametric cost estimate is used for scaling of the cost, i.e. for cost improvement. The cost improvement is defined by the following equation: P = P1 Na where P is the total price of N units, P1 is the first unit price and a the slope of the curve related to learning. The slope a is for large N also the ratio of the last unit price PN and the average unit price <P>. No tax is included. No escalation is used. The fixed date is January 2, 2007. No contingency is calculated. The risk will be analyzed separately. One currency with fixed exchange rates is used. The fixed exchange rates are: 1 M€ = 1.2 M$ = 1.44 Oku¥. Fixed raw material prices, i.e. for copper, steel and niobium, and fixed prices for power are used. The fixed prices are: Electrical work C/W = $ 0.1/kWh (incl. supply cost), Copper C/m = $ 1000/100 kg (up to factor three higher for degassed copper), Black steel C/m = $ 0.6 /kg (for stainless and magnet steel up to factor three higher). The external labor is included in the value. Internal (institute) labor will be estimated in person hours (1 person year = 1700 person hours). The EDIA[1] is included in the item cost. [1] In the U.S. EDIA is the acronym for Engineering, Design, Inspection and Administration. Industry calls this non-recurring engineering (NRE). value is world market price if exists P = P1Na, where P is the total price of N units 1 M€ = 1.2 M$ January 10, 2007 ILC MAC Meeting Global Design Effort

High Level RF Value Estimate Collaborators and Contributors KEK: S. Fukuda (Asia Technical Co-Chair & HLRF POC) H. Hayano, T. Shidara, M. Akemoto FNAL: C. Jensen, B. Chase, N. Solyak, O. Nezhevenko, R. Reid, J. Leibfritz, E. Heudem SLAC: R. Larsen (Americas Technical Co-Chair) C. Adolphsen, M. Neubauer, C. Nantista, C. Corvin, R. Cassel, DESY: Contacts W. Bialowons, L. Lillje, S. Choroba, S. Simrock (LLRF) January 10, 2007 ILC MAC Meeting Global Design Effort

Outline HLRF Value Estimate High Level RF Sums Overview 10 MW Main Linac Station American HLRF Cost Estimate Cost Methodology Learning Curves European HLRF Cost Estimate Comparison between XFEL and TDR Supplement cost of the High Level RF Material List and Work Break Down Structure Cost Results for 10 MW System by Region Conclusion for HLRF Cost Estimate January 10, 2007 ILC MAC Meeting Global Design Effort

HLRF Top Level Sums Global Design Effort January 10, 2007 ILC MAC Meeting Global Design Effort

Total HLRF Systems = M$ 660 Global Design Effort January 10, 2007 ILC MAC Meeting Global Design Effort

10 MW Linac Stations Global Design Effort Penetrations: Cable & Plumbing Waveguide LLRF, Controls, Protection Racks Charger Main Modulator HV Pulse Transformer Horizontal Klystron LCW Chiller AC Switchgear Waveguide Distribution System Dwg: J. Liebfritz January 10, 2007 ILC MAC Meeting Global Design Effort

10 MW L-Band Stations (1) Prototype stations in use at DESY for ~10 years Chosen as Baseline Conceptual Design (BCD) 2004 at Snowmass Dual tunnel model eliminates long expensive HV cable plant Modulator, Charger, Pulse Transformer Cost Model used FNAL design most recent costs updated to 2006. Vendors in Europe & US built small quantities all items. Learning curves applied to extrapolate to mass production Klystron Multi-beam tube (MBK) prototypes built by three companies in Japan, France, US provide limited cost information for mass production SLAC experts constructed bottom-up new factory model with cost recovery modeled into mass production. January 10, 2007 ILC MAC Meeting Global Design Effort

10 MW L-Band Stations (2) Waveguide Distribution System Complex and expensive based on current off-the-shelf components Circulators and tuners on every cavity, hybrids drive cost Cost model is bottom up-using TESLA approach but some optimization of designs assumed Quotes from industry in 2 regions plus European lab estimate Controls, Protection and Infrastructure Conventional HV, LV distribution based on US RSMeans COTS pricing for quantities Protection model based on bottom up of conventional COTS Programmable Logic Controllers, power supplies, vacuum etc. Some component pricing obtained from Asia for comparison Learning curves applied in all cases Budgetary quotes obtained from 3 Regions, vendors wherever possible to compare with bottom-up January 10, 2007 ILC MAC Meeting Global Design Effort

Klystron Learning Curve c.f. Industry “Learning Curve Components” for an 88 % curve fit to the Klystron Factory Model Labor LC=80% Material LC=95% Other u Periodic Costs are rate dependent Klystron Cost Other Periodic Costs Tooling Fixturing Automation Indirect Labor Cleaning Plating Supplies Utilities Leasing January 10, 2007 ILC MAC Meeting Global Design Effort

CPI VKS-7964M Learning Curve Example Snowmass 2005 “RF source selection for the ILC” Wright, Bohlen, Lenci, Balkcum L = 83 %, a = 0.73 !! L = <P2N> / <PN> Costs increased when rate was reduced Lowest cost at max production rate January 10, 2007 ILC MAC Meeting Global Design Effort

Comparison between XFEL and TESLA Cost The ratio can be explained by: Escalation (2000-2006 13 %) Increase of raw material prices (Cu Index price ~ $10/ kg) Additional experience L = 88 % Main Linac RF System XFEL TESLA Supplement N P / M€ P/N/M€ Ratio 29 69.81* 2.407 26 47* 1.808 1.332  4/3 N number of items, P total price * without Institutional Labor January 10, 2007 ILC MAC Meeting Global Design Effort

Material List (Scaled TESLA Cost) January 10, 2007 ILC MAC Meeting Global Design Effort

WBS for HLRF HLRF for ML: M$ 650.24 Global Design Effort January 10, 2007 ILC MAC Meeting Global Design Effort

Cost Results for HLRF by Region Note: RF Dist’n no’s from Asia & Europe scaled for CC#20 9-8-9 model Some components have no Mfg base in Asia January 10, 2007 ILC MAC Meeting Global Design Effort