AERONAUTICAL RADIO OF THAILAND LTD.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Erwin Lassooij PBN Programme Manager 30 January 2014
1 Federal Aviation Administration FAA Academy November 21, 2011 Air Traffic Organization FAA Academy Courses Aviation System Standards November 21, 2011.
CHINA GO TEAM VISIT 2014 Erwin Lassooij/Joel Morin 30 June 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA 1973 to 2004.
APAC PBN Seminar F.LECAT (ICAO)
Products and Services Three - Dimensional ATC Aerodrome Simulators Airline Operational Control Service (AOC) Training (ATC and Engineer) Flight Inspection.
Airline PBN Operations & Desired Entry Competency Elizabeth Bjerke University of North Dakota.
Company Forms, Records & Administrative Procedures Westwind Air Service.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
ICAO COSCAP INITIATIVES ICAO COSCAP INITIATIVES Speaker : Len Cormier CTA COSCAP-NA ICAO Technical Cooperation Bureau.
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
FAA Flight Standards COSCAP-SEA, October 2008 Federal Aviation Administration 1 FAA International Flight Standards Federal Aviation Administration Inspector.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
DUTIES AND RESPONSIBILITIES OF DCA ON CABIN SAFETY ISSUE October 2008, 10 th Steering Committee Meeting, Macau Thipsuda Chiamcharoenvut, Department.
COSCAP FPP Programme Update 1 Flight Procedures Programme (FPP) 4 th ARAST Meeting Bangkok, Thailand 21 to 25 February 2011.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic Training on Management of.
AERODROME CERTIFICATION COURSE Karachi, Pakistan 02 – 04 March 2010
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
PERSONNEL LICENCING REGULATIONS  Afiland adapts ICAO Annex 1 SARPS  Except  Flight Navigator,  Flight Engineers  Flight Radio telephony Operators.
GNSS Aviation Applications
CANSO PBN Support Phil Rakena CANSO PBN SG co-Chair Regional PBN Champion [Airways New Zealand]
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Module-3 OJT (Vietnam) on “Design Verification/Ground.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 ATM SEARAST Safety Enhancements 8 – 9 January 2007.
FlightSafety Academy Professional Flight Training.
20 th Steering Committee Meeting COSCAP – South Asia Colombo 5 th – 8 th April 2011 Maldives.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Flight Operations Research Centre of Excellence Dr. Hazel Courteney Head of Research & Strategic Analysis.
Approval Guidance for RNP Procedures with AR February 10, 2015 Federal Aviation Administration Approval Guidance for RNP Procedures with AR C-384 Presentation.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
STATISTIC ANALYSIS OF THE AERONAUTICAL AND AIR TRAFFIC STUDENTS EDUCATION AT THE FACULTY OF TRANSPORT AND TRAFFIC ENGINEERING, UNIVERSITY OF ZAGREB Biljana.
APAC PBN Seminar F.LECAT (ICAO)
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
PBN Performance Based Navigation
ATM Implementation Support by ICAO APAC RSO
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Workshop on preparations for ANConf/12 − ASBU methodology
PBN OVERSIGHT IN AUSTRALIA
Erwin Lassooij PBN Programme Manager 30 January 2014
Workshop on preparations for ANConf/12 − ASBU methodology
Airline PBN Operations & Desired Entry Competency
Air Traffic Organization
Workshop on preparations for ANConf/12 − ASBU methodology
(CAPE TOWN, SOUTH AFRICA, JULY 2011)
IATA/ATDI Senior Civil Aviation Management Course
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Basics of RNP.
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
Erwin Lassooij/Joel Morin 30 June 2014
Department of Civil Aviation Ministry of Information & Communications
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Technical Co-operation Challenges
RNAV and RNP Strategy in Japan
Department of Civil Aviation Ministry of Information & Communications
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
DEPARTMENT OF AIR TRAFFIC CONTROL
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

AERONAUTICAL RADIO OF THAILAND LTD.

Products and Services Three - Dimensional ATC Aerodrome Simulators Airline Operational Control Service (AOC) Training (ATC and Engineer) Flight Inspection and Validation Service Flight Procedure Design Service RAIM Prediction Service

Flight Inspection and Validation Service

Video Presentation

Flight Inspection and Validation Service Established since 1968 Sole Flight Inspection and Validation service in Thailand 48 PBN procedures

AEROTHAI’s Fleet 4 aircrafts (Beechcraft Super King Air 200 and 300 )

Automatic Flight Inspection and Validation System AERO DATA/Normarc Flight Inspection Systems ICAO Doc 8071 and FAA OAP .8200 flight inspection guidelines Capable to automatically record GNSS Data for future analysis as necessary

Flight Inspection Team Aircraft Operation Department 8 Flight inspection pilots 15 Flight inspection engineers Aircraft Engineer Department 17 Aircraft engineers

Flight Inspection and validation service aboard Bhutan Brunei Cambodia Lao People's Democratic Republic Myanmar Nepal Republic of China (Taiwan)

Successful projects Flight Validation Service for PBN Procedure, Republic of China (Taiwan) in 2008 – 2009 Flight Inspection Service for ADS-B, Republic of China (Taiwan) in 2010 Flight Inspection and Validation service for all airports in Nepal 2011 – 2014 Flight Inspection and Validation service for all airports in Lao People's Democratic Republic 2008 – 2015 Flight Inspection and Validation service for all airports in Bhutan 2010 – 2015 Flight Inspection and Validation in Cambodia, 2014-2015 **

Flight Procedure Design Service

Flight Procedure Design Training Phases Ab initio Training Basic Aviation course AIS Cartography Initial Training Basic PANS-OPS PBN On-the-job Training (OJT) In-house OJT Advanced Training RNP AR Instructor course Recurrent Training Refresher Training

Automation Tools Universal Avionics Flight Planning PANADES AutoCAD Civil 3D Spread Sheet Etc. Google Earth COMSYS ArcGIS

Flight Validation Report in compliance with ICAO Doc 9906

Flight Validation for PBN Aboard

Service and Safety Standard

NETRA RAIM Prediction Service

Flight Inspection and Validation Service Mr. Tirachai Sungkasap artflightcheck@yahoo.co.uk Tel: +6681-734-9242 Fax: + 662-285-9565