Highlights of the New NPDES Permit

Slides:



Advertisements
Similar presentations
Co-Project Managers Eisenberg, Olivieri & Associates Tom Hall, Eisenberg, Olivieri & Associates, Larry Walker Associates Tom Grovhoug, Larry Walker Associates.
Advertisements

LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Wastewater Systems Effluent Regulations (Draft) Update Mohammed Karim, M.Eng., P.Eng. Senior Water & Wastewater Engineer Southern TC, LFN & UFN meeting.
Clean Water Act Section 402 Issues Facing Kentucky Kentucky Professional Engineers in Mining Seminar September 6, 2013 Lloyd Cress, Kentucky Coal Association.
Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Public Workshop Implementation and Enforcement of Nutrient TMDLs for Lake Elsinore and Canyon Lake CA Regional Water Quality Control Board (Regional Water.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Connecticut Department of Energy and Environmental Protection.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems BACWA.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
ANNUAL REPORT Monitoring Reports 2010 Monitoring Reports 2010  Every month SSD is required to send a monitoring data report to the State Water.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
BACWA – Leading the way to protect our Bay Hot Topics for BACWA in 2008 Dave Williams Chair of the Executive Board January 2008.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
CONSTRUCTION UPDATE Napa Plant Site Central Unit.
SOUTHERN CALIFORNIA COASTAL WATER RESEARCH PROJECT (SCCWRP) Stephen B. Weisberg Executive Director.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
New Hampshire State fish hatchery effluent discharge and EPA/NPDES permit story.
Transboundary Flows and Permit Violations NPDES CA Order No. R November 5, 2015 International Boundary and Water Commission.
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Connie Brower NC DENR Division of Water Resources.
MONTHLY OPERATIONS REPORT February 2016 Town of Discovery Bay, CA 2373 Days of Safe Operations 107,602 worked hours since last recordable incident.
CALIFORNIA WATER ISSUES Survey of Wine Institute Advocacy Efforts Wine Institute Board of Directors Meeting – March 8, 2016 Tim Schmelzer, Director of.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
BACWA – Leading the way to protect our Bay 2008 Year in Review and Hot Topics for 2009 David Tucker Chair of the Executive Board January 2009.
Slide 1 Agenda Item #15 Central Valley Water Board Meeting of 13 August 2009 Triennial Review Sacramento and San Joaquin River Basins Betty Yee, Senior.
BACWA – Leading the way to protect our Bay Mercury Watershed Permit Special Provisions BACWA Annual Members Meeting January 29, 2009 Michele Pla Melody.
ADOPT UPDATED SEWER SYSTEM MANAGEMENT PLAN (SSMP) Sausalito CC 11FEB14.
Integrated Watershed Management
FUTURE REQUIREMENTS AND GOALS
Limit Sets.
FY 2017/18 General Budget Workshop
GREAT BAY and NEW HAMPSHIRE WATER QUALITY STANDARDS
Waste Discharge Permit: Paradise Irrigation District
Utility Board Training: Technical Capacity
2017 Environmental Trade Fair Shannon Gibson
UPDATE ON US LEGAL ISSUES NORTH AMERICAN PANEL MEETING 24 OCTOBER 2006
The Nuts & Bolts of TBLL Development
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
STORMWATER MANAGEMENT
Wastewater Systems Effluent Regulations
Springbrook Estates Sewer Improvement Area Informational Meeting
ROAD SAFETY STATISTICS FROM 1 JANUARY -26TH APRIL,2016
New pH Method NEW Providing end of pipe limit, requiring testing only at point of discharge. Allows for a daily maximum, but if not meeting that you may.
Update on Water Quality
John Tinger U.S. EPA Region IX
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Quarterly Environmental Compliance Report
Public Hearing Sanitary Sewer Fees
Wastewater Facilities Upgrade Project
EPA’s Current Air Toxics Activities
REGIONAL SAN Proposed SEWER RATES
EPA Region IV and ADEM NPDES Permit Coordination
2018 Environmental Trade Fair Shannon Gibson
TCEQ Environmental Trade Fair Water Quality Division
New pH Method NEW Providing end of pipe limit, requiring testing only at point of discharge. Allows for a daily maximum, but if not meeting that you may.
Indiana Department of Environmental Management Office of Water Quality
Vineyards and Water Quality
Module 1d – Limits and Parameters
From Sewers to Sanddabs: Orange County Sanitation District
Presentation transcript:

Highlights of the New NPDES Permit Jim Keller Monica Oakley Mark Koekemoer August 3, 2016

About NPDES Permits NPDES = National Pollutant Discharge Elimination System Federal and State permit Issued by the Regional Water Quality Control Board (a state agency) Federal authority is delegated to the state by the U.S. Environmental Protection Agency NPDES Permit lasts for five years

Permit Dates Renewal Application Submitted September 30, 2015 Tentative Order (Public Review) April 26, 2016 Adopted July 13, 2016 (Uncontested Calendar) Effective September 1, 2016 Expires August 31, 2021

Permit Adoption Hearing – July 13, 2016 Regional Water Board members commended NSD: Perfect compliance during previous permit term Extensive recycled water program

Permit Adoption Hearing – July 13, 2016 …and expressed significant concern with the existing rate of collection system repair and replacement at 1.1% Tim Healy explained the recent rate increase going to 1.3% for the next three years and reaching 2% in five years Tim emphasized NSD’s commitment to integrity of collection system Board members were satisfied with this development

Regional Water Board is Also Looking at Sanitary Sewer Overflow (SSO) Data First draft of permit: Medians Length (miles) Age (years) Total SSO Rate (per 100 miles of sewer) 2012 2013 2014 2015 Napa Sanitation District (main and lower lateral lines) 418 57 26.6 27.3 30.4 19.8 Solano County median (>100 miles) 426 33.7 6.5 6.1 8.9 Sonoma County median 117.1 59.1 4.9 0.9 7.8 2.1 San Francisco Bay Region median of 45 large systems (> 100 miles) 230 50 5.0 4.5 5.2 3.5 median of all 132 systems 46 45 4.6 6.2 3.2

Average Age of Pipe (years) Main and Lower Lateral Lines Final permit: Medians No. Systems Length (miles) Average Age of Pipe (years) Total SSO Rate (per 100 miles of sewer) 2012 2013 2014 2015 Main Lines Only Napa Sanitation District 1 271 43 4.1 3.0 9.2 Solano County median (>100 miles) 3 270 34 3.8 2.4 4.2 Sonoma County median (>100 miles) 2 165 59 6.9 3.3 10.9 4.3 Marin County median (>100 miles) 4 173 48 12.1 8.1 10.3 8.8 Main and Lower Lateral Lines 418 26.6 27.3 30.4 19.9 426 6.5 6.1 8.9 177 9.8 3.9 12.4 San Francisco Bay Region median of large systems (>100 miles) 45 230 50 5.0 4.5 5.5 San Francisco Bay Region median of all systems 133 46 5.2 6.3 3.7

Notable Changes from Previous Permit Discharge “Prohibition” Period Reduced Old: May – Oct (6 months) New: July – Sep (3 months) New discharge period will result in more recycled water storage “Wet season” BOD and TSS Limits Extended These BOD and TSS limits extended to May, June, and October: Constituent “Wet Season” “Dry Season” BOD – average monthly 30 mg/L 10 mg/L BOD – average weekly 45 mg/L 20 mg/L TSS – average monthly TSS – average weekly

More Notable Changes New Reporting of Recycled Water Volumes Daily Monthly Purpose is to justify change in “prohibition” period. If a discharge less than 4 days occurs in July, August, or September, reduced sampling is allowed Mobilization not justified for short-term discharge Lots of sampling already at other times of year

Other Constituents with Effluent Limits 2011 Permit 2016 Permit Copper Nickel Cyanide Total Ammonia Dioxin -TEQ

Successes in Permit Negotiations Prevented change to ammonia limits Final permit allows greater operational flexibility and reduces risk of non-compliance Simplified recycled water reporting Only recycled water distribution will be reported Ammonia Limit (mg/L) 2011 Permit 2016 Draft Final Average Monthly Limit 21 12 Maximum Daily Limit 49 37

Chronic Toxicity Trigger (Tuc) More Successes Increased influent cyanide concentration action trigger Action trigger in draft permit was 8.9 mg/L, final permit has 12 mg/L. Retained existing chronic toxicity triggers Chronic Toxicity Trigger (Tuc) Draft Permit Final Permit 3-Sample Median 1 10 Single Sample Maximum 2 20

Monitoring Frequency Reductions Constituent(s) 2011 Permit 2016 Permit Estimated Cost Savings to District During Permit Term BOD & TSS Sampling Frequency 2 / week 1 / week $4,500 Turbidity 2 / month none $200 Dissolved Oxygen Sampling Frequency 1 / day $3,100 Priority Pollutants 2 / year 1 / year $20,260 Pretreatment Pesticides $3,060 Groundwater – several parameters $1,300

Successful NPDES Permit Adoption Was a Team Effort Tim Healy Andrew Damron Jim Keller Mark Koekemoer Jeff Tucker Elsa Seal Monica Oakley Dave Richardson (RMC) Jennie Pang (RMC)