Rack Design Proposal as of 01/03/2013

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Standard Rung 30mm 385mm 350mm 10mm 111mm 2mm47mm77mm107mm 147mm177mm207mm 236mm272mm302mm332mm355mm 378mm.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
ZTF Interconnecting Scheme Stephen Kaye
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
NRC Rack in USA15 Discussion on Monday with Martin J. and Agostino L. In short: our proposals do not work Current ATCA shelves incompatible with LHC racks.
SGI Confidential Power Bay. SGI Confidential Power Bay Front View AC OK LED DC OK LED Alarm LED Release Latch Power Bay 1 Power Bay 0 Power.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets Friedrich Fix 1 AdvancedTCA Systems Platforms according to PICMG.
ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Status of NA62 straw electronics and services
Cabling for LHCb Upgrade
LKr status R. Fantechi.
Computing room PC farm UPS.
FTK infrastructure in USA15 Status and plans for 2015 A
General aspects: Optical links :
COOLING LHC RACKS PROCUREMENT
CERN Data Centre ‘Building 513 on the Meyrin Site’
TileCal upgrade EVO meeting Demonstrator tesks
ProtoDUNE Installation Workshop - DAQ
ALICE Trigger Upgrade CTP and LTU PRR
EMU Slice Test Run Plan a working document.
Fiber Installation for RUN 3&4
ATLAS Detector Controls
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
Pierluigi Paolucci & Giovanni Polese
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Prepared for CSC by Fred Borcherding FNAL
Needed for Team A on -End
Presentation transcript:

Rack 28.16 Design Proposal as of 01/03/2013 Nicoletta

The Proposals sent to Martin J. 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Proposal One: TTC crate below ATCA shelves 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Turbine Heat exchange TDI (main) Air deflector TDI (backup) Main ATCA shelf TTC crate Fan tray Heat exchanger Patch panel Side A F/O box Patch panel Side C ATCA shelf Turbine 2,31 m Heat exchanger ATCA shelf Heat exchanger Main ATCA shelf The Proposals sent to Martin J. F/O box Patch panel Side C Patch panel Side A TTC crate Fan tray Air deflector Proposal Two: TTC crate above ATCA shelves TDI (main) TDI (backup)

Proposal One Rack Turbine 4U Heat exchanger 1U TTC crate 6U 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Turbine Heat exchange TDI (main) Air deflector TDI (backup) ATCA shelf TTC crate Fan tray Patch panel Side A F/O box Patch panel Side C Heat exchanger Proposal One Rack Turbine 4U Heat exchanger 1U TTC crate 6U Fan tray 2U ATCA shelf 6U F/O box 4U Patch panel 4U Air deflector 2U TDI 1U Spare TDI 1U 2,31 m Part of vertically cooled rack installation From Rack 29.16 1,15 m New SLAC components

FRONT VIEW TTC Crate: ATCA shelf: F/O box Patch panel: 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Turbine Heat exchanger TDI (main) Air deflector TDI (backup) ATCA shelf TTC crate Fan tray Patch panel Side A F/O box Patch panel Side C FRONT VIEW TTC Crate: 3 big cables for the LTP lemo cables from the TTC-ex board lemo cables for busy 6 big cables for LV (DCS) Ethernet from SBC (ctrl network) ATCA shelf: Ethernet to ctrl network for DCS Ethernet to TDI F/O box Patch panel: Patch fibers to switch between VME & ATCA Air deflector 2U TDI: Ethernet (ctrl network) Spare TDI 1U 2,31 m 1,15 m

BACK VIEW TTC Crate: ATCA shelf: F/O box: Patch panel: 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Turbine Heat exchanger TDI (main) Air deflector TDI (backup) ATCA shelf TTC crate Fan tray Patch panel Side A F/O box Patch panel Side C BACK VIEW TTC Crate: power ? ATCA shelf: 48 MTP cables from the detector 4 MTP cables to the F/O TTC fibers to TTC crate BUSY lemo cables to TTC crate F/O box: 4 MTP cables from ATCA 16 LC cables to ROS Patch panel: 48 MTP cables to ATCA shelf 48 MTP cables to VME Crate 1 and Crate 2 Air deflector 2U TDI: Spare TDI 1U 2,31 m 1,15 m

ARRANGEMENT’S MOTIVATIONS 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Turbine Heat exchanger TDI (main) Air deflector TDI (backup) ATCA shelf TTC crate Fan tray Patch panel Side A F/O box Patch panel Side C ARRANGEMENT’S MOTIVATIONS ATCA shelves easy to reach Space between ATCA shelf & TTC crate: to make the TTC fibers from ATCA back-side going to TTC crate front-side Space for 14U ATCA shelf instead of 2 6U shlves F/O box on top of Patch Panel: to not cross the cables going to the VME crates Patch panel: easy to reach position in the back, cables arising from the floor (to VME & from detector) do not cross the cables to ATCA Space above TDI: to possibly connect a keyboard and a screen? 2,31 m 1,15 m

Notes ATAC shelf supplies 1.5 kW comes with fans located on right and left sides to allow right-left air motion Ex: http://www.asis-pro.com/drupal-7.14/?q=node/4 If we intend to use the emulator in USA15 we have to swap 48 fibers Vertically cooled rack believed to be OK with this type of ATCA shelf No need for back-door with fans pc-csc-det-01 can remain in rack 29 with the ctrl network switch for the time being The Rack schema has to be entered into Rack Wizard

Another (Preferred) Solution TTC crate easy to be reached 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y.28-16.A1 Another (Preferred) Solution TTC crate easy to be reached CSC is not the only customer (DCS, potentially Micromegas) ATCA primary shelf not too low USA15 is not a lab Possible frequent disruption during LS1 on network, cooling, electrical distribution USA15 is not easy to reach and not a pleasant place to work ATLAS management would disagree No need for a second ATCA shelf for emulator Half RCEs can run as emulator if needed, and be connected to the other half using the patch-panel Turbine 2,31 m Heat exchanger ATCA shelf 1,65 m Heat exchanger F/O box Patch panel Side C Patch panel Side A TTC crate Fan tray Air deflector TDI (main) TDI (backup)

CERN TEST STANDs What we need to do Possible labs: Develop DCS interface People involved: George Requires: Shelf Manager + control network + DCS PC (aka running PVSS) Study IPMI interface with TDAQ sysadmins Develop TDAQ interfaces Develop CSC software Use an LTP if possible Possible labs: TDAQ Lab  OK for 2. and 3. maybe 1. as well (depends on PVSS availability and if George can get the account there) ? For 4. and maybe 1. We need: access to afs, to tdaq release, stable network, rack, external support SR1 is the best option as far as I can tell: need to ask for permission + think about cooling: are the embedded fans enough?

Shopping List Two (2) 2U ATCA Shelf + Shelf Manager for TDAQ Lab One (1) 6U ATCA Shelf + Shelf Manager for ?LAB? One (1) 6U ATCA Shelf + Shelf Manager for USA15 Boards? 