MuCool Test Area http://mice.iit.edu/mta/ Dedicated facility built at the end of the Linac to address MuCool needs RF power (12MW @ 805MHz, 4.5MW @ 201MHz)

Slides:



Advertisements
Similar presentations
High pressure RF cavity project Katsuya Yonehara APC, Fermilab 2/28/11 - 3/4/111.
Advertisements

Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
DOE HEP Review May Office of Science Challenges of Normal Conducting RF cavities for a Muon Collider Derun Li On behalf of the US Muon Accelerator.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MuCool RF Workshop-Fermilab 107/07/2009 Muons, Inc. Dielectric-Filled RF Cavities Milorad Popovic FNAL.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
The Muon Accelerator Program “High”- Gradient Normal Conducting RF R&D Alan BrossUS HG Workshop February 9-10, Meeting the RF in Magnetic Field Challenge.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Mahzad - 8/9/2007 AAC Presentation 1 High Pressure RF Studies Mahzad BastaniNejad Muons, Inc., Old Dominion University Muons, Inc.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
NFMCC Meeting 3/12/06 A. Bross MuCool Overview Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
Dazhang Huang MUTAC Review LBNL, April 2008 Fermilab MTA 805 MHz RF Program.
Component Development MAP Winter Meeting, 3/4/20121Alan Bross.
Basic of muon ionization cooling K. Yonehara 8/29/11HPRF cavity physics seminar - I, K. Yonehara1.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of the Muon Accelerator Program 5/22/121International Particle Accelerator Conference,
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Measurement of 400 MeV Proton Beam Intensity and Transmission Through Collimator of HPRF Cavity at Fermilab MuCool Test Area M. R. Jana 1, M. Chung 1,
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
Progress of High Pressure Hydrogen Gas Filled RF Cavity Test Katsuya Yonehara Accelerator Physics Center, Fermilab Muon Accelerator Program Review Fermilab,
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
US Construction Project: SSs, PRY, Cavities and test program 1.
Institutional Logo Here NCRF Cavities in Strong Magnetic Field: Is This Still an Issue? Derun LI Lawrence Berkeley National Laboratory AAC Workshop, San.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
Uppsala Commitment to ESS and FREIA Planning
MICE RF Cavity Simulations and Multipactor
Design of the MANX experiment
SNS Fundamental Power Coupler History
Summary of MuCool/MTA RF workshop
Electron Source Configuration
Presentation transcript:

MuCool Test Area http://mice.iit.edu/mta/ Dedicated facility built at the end of the Linac to address MuCool needs RF power (12MW @ 805MHz, 4.5MW @ 201MHz) Large-bore 5T superconducting solenoid Cryogenic plant 400-MeV H- beamline Class-100 portable clean room Hydrogen safety infrastructure 805- and 201-MHz cavities Radiation detectors June 27, 2017 Alan Bross | MICE cm48, Belgrade

Alan Bross | MICE cm48, Belgrade MTA Diagnostics RF directional coupler and pickup signals Vacuum pressure Scintillator+PMT counters for X-ray rates, spectra Ionization chambers for radiation dose rates Spectrometer for cavity light analysis Thermocouples for cavity temperature Acoustic sensors for spark detection (under development) Toroids for beam intensity BPM, MW and scintillator for beam profile/position Environmental monitoring June 27, 2017 Alan Bross | MICE cm48, Belgrade

Vacuum Pillbox Cavity R&D 805-MHz Modular Cavity (SLAC/LBNL) Latest R&D vehicle for detailed systematic studies Modular design for easy assembly, parts replacement Removable endplates (Cu, Be, TiN coated surfaces) Coupling iris moved to center ring and field reduced (more realistic design) RF design validated by detailed simulation Ports for instrumentation June 27, 2017 Alan Bross | MICE cm48, Belgrade

Modular Cavity Program Microscope setup in clean room for detailed endplate inspection after every run Allowing us to keep track of surface features Breakdown study Ph. D. project for Alexey Kochemirovskiy (U. Chicago) Supervisor Daniel Bowring June 27, 2017 Alan Bross | MICE cm48, Belgrade

Modular Cavity: Cu endplates B=0 T, Apr-Oct 2015 13M pulses, 130 sparks, 45 MV/m B=3 T, Dec 2015 5M pulses, 55 sparks, <12 MV/m B=0 T, Jan-Feb 2016 14M pulses, 460 sparks, 22 MV/m B=3 T, Apr 2016 3M pulses, 81 sparks, ~10 MV/m June 27, 2017 Alan Bross | MICE cm48, Belgrade

Inspection after B=0 run ~500 documented spots on surface look relatively flat No correlation between opposing endplates Representative features below June 27, 2017 Alan Bross | MICE cm48, Belgrade

Inspection after B=3T run 168 spots on surface Clearly visible damage, qualitatively different structure B=3 T June 27, 2017 Alan Bross | MICE cm48, Belgrade

Inspection after B=3T run Perfect matching between endplates Radial distribution consistent with E-field pattern June 27, 2017 Alan Bross | MICE cm48, Belgrade

Modular Cavity: Be endplates Results PRELIMINARY Be+Be, B=3 T, Apr 2017 11M pulses, 160 sparks, 37 MV/m Be+Be, B=0 T, Apr 2017 80k pulses, 1 spark, 37 MV/m Be+Cu, B=3 T, May-Jun 2017 13M pulses, ~40 sparks June 27, 2017 Alan Bross | MICE cm48, Belgrade

Alan Bross | MICE cm48, Belgrade Status/schedule Next Modular Cavity run starting this week Be endplates in several B-field settings To be completed Jul 14 Fermilab accelerator complex maintenance period starts Jul 7 Disassembly, inspection afterward End of MTA program decommissioning before Oct future use of facility TBD June 27, 2017 Alan Bross | MICE cm48, Belgrade

Alan Bross | MICE cm48, Belgrade MTA program (2005-2017) 8 cavities operated HPRF-1, short pillbox, MICE prototype, rectangular box, HPRF-2, long pillbox (all-season), MICE production, Modular in dozens of different configurations solid endplates, single/dual buttons, thin curved Be windows, single/dual grids with and without magnetic field including 3 beam tests June 27, 2017 Alan Bross | MICE cm48, Belgrade

Alan Bross | MICE cm48, Belgrade Highlights Pillbox cavity operation -- basic building block for muon cooling channels Thin curved Be windows -- needed for pillbox cavities with muons Identified vacuum cavity issues in B-field Tested different materials looking for breakdown limits Demonstration of magnetic insulation Demonstration of pressurized cavity (HPRF) concept minimal conditioning, no B-field effect Measurement of beam-induced plasma loading in HPRF Demonstration of dielectric loading in HPRF SRF techniques applied to Cu (MICE) cavities high-gradient operation with no conditioning sparks Demonstration of mechanical tuning system in large (MICE) cavity Successful operation of MICE RF prototype module at well beyond required gradient; tracker backgrounds explored Well-controlled systematics, surface inspection with Modular Cavity no performance degradation in B-field for Be endplates June 27, 2017 Alan Bross | MICE cm48, Belgrade