YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.

EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
Barriere O, Le Roux P
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
Service Management Status 102 th ACCU Meeting 04 December 2013.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Introduction CAD Data Exchange CERN 11 th CATIA FORUM 7 th June 2012 B.Riffaud.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Budget & Finance. OUTLINESOUTLINES Part 1 : The Eden project in figures Part 2 : Financial relations within the 6th FP 2 1. Roles in the financial process.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
YETS & LS2 Works EN-EL / Power distribution
Status, Schedule and EVM for the test facility project
Cabling for LHCb Upgrade
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
LIU Wire Scanner Milestones June 2017
Safety Documentation EHN1
Injector De-cabling Project
Safety in Construction and Upgrade Phases
News from EVM.
EC Activities Status for the LIU
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
prepared by R.A.Barlow 30/056/2016
CRG activities for EYETS 2016
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
East Hall under construction
GIS Portal Racks Project
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Update on Reporting under Article 17 Information point 9
East Hall under construction
HL-LHC - WP15 modifications Coffrets Prise C4L8
Open Points and More… Giulia / Michael / Sebastien / Maria.
Work and Service Supervisor
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

YETS 2017-2018 & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse 29 juin 2017

EL Work Requests: YETS 2017/2018 Preparation (except LIU) Timeline Preparation of Technical Files Preliminary studies Material Provision 22-06-17 15-07-17 15-09-17 12-10-17 01-12-17 t MEMO sent to Users Pre-DIC/DIF and electrical distribution through CERN Service Portal Final DIC/DIF and electrical distribution request Activities Schedule & IMPACT creation Technical Files ready for EL contractor Coordination meeting: Presentations of YETS 2017/2018 Users Activities Coordination meeting: Presentations of YETS 2017/2018 EN-EL Activities YETS 2017-2018 – Reminder 29/06/2017

LS2 Preparation Strategy – PS complex (except LIU) Important dates Deadline for PLAN-V2 resources allocation 02-06-17 12-10-17 01-12-17 18-12-17 YETS 2017/2018 t Pre-DIC/DIF and electrical distribution through CERN Service Portal Preparation of LS2 works (advance installations where possible) Presentation of EL activities during LS2 with estimated durations. YETS 2017-2018 – Reminder 29/06/2017

Document DIC (EDMS: N°1210369) Demande d’installation de câbles 29/06/2017 YETS 2017-2018 – Reminder

Document DIF (EDMS: N°1153880) Demande d’installation fibre optique 29/06/2017 YETS 2017-2018 – Reminder

Document DIR (EDMS: N°1398443) Demande d’installation de racks 29/06/2017 YETS 2017-2018 – Reminder

Document DFP (EDMS: N°1540878) Demande de fourniture de Patchcords 29/06/2017 YETS 2017-2018 – Reminder

Document DEC (EDMS: N°1314019) Demande d’enlèvement de câbles 29/06/2017 YETS 2017-2018 – Reminder

Ticketing system https://cern.service-now.com/service-portal/service-element.do?name=FibreOptics 29/06/2017 YETS 2017-2018 – Reminder

Thank you for your attention !