Johan van den Berg Chair: Steering Committee

Slides:



Advertisements
Similar presentations
Professor Dave Delpy Chief Executive of Engineering and Physical Sciences Research Council Research Councils UK Impact Champion Competition vs. Collaboration:
Advertisements

Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
SOUTH AFRICA’S RENEWABLE ENERGY INDEPENDENT POWER PRODUCER PROGRAMME (REI4P) 2014 REVIEW REPORT:
PANEL DISCUSSION ON RENEWABLE ENERGY PROCUREMENT FOR INDEPENDENT POWER PRODUCERS BIDDING: WINDOW 1 Johan van den Berg Chair: Steering Committee South African.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
+ DOING GOOD WIND BUSINESS IN SOUTH AFRICA – EWEA 2014 Johan van den Berg CEO, SAWEA.
Exploring solutions to challenges on financing and certification on locally produced renewable products Johan van den Berg Chair: Steering Committee South.
Inger Kristiansen & Sarah Williams Envirolink Creating the Next Industrial Evolution.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Mbombela Climate Change Workshop 2 5 November 2015 Civic Centre Hall, Mbombela.
SANEA/NPC dialogue on energy in the NDP: Innovation and investment by the private sector Johan van den Berg Chair November 2014.
Skills development in the Renewable Energy Sector in South Africa Johan van den Berg Chair: Steering Committee South African Renewable Energy Council 11.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
UHC 2030 CSO engagement mechanism Bruno Rivalan IHP+ Northern CSO Representative IHP+ Steering committee 21 th June 2016.
BENEFITS OF COMPETITION REFORMS FOR CONSUMERS AND PRODUCERS IN DEVELOPING COUNTRIES (CREW Project) 18 TH – 19 TH NOVEMBER, BANGKOK Reflections on.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
TOWARDS PUBLIC PROCUREMENT KEY PERFORMANCE INDICATORS Paulo Magina Head of the Public Procurement Unit Public Sector Integrity Division 10 th INGP Annual.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
IN SUMMARY The ultimate aim of discussion about MYPD3 should be to ensure the long term well-being and sustainability of the people of SA – renewables.
MELBOURNE RENEWABLE ENERGY PROJECT
The Demand-Driven Workforce Investment System
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
Presentation to the Portfolio Committee on Communications on the:
The voluntary sector and devolution
Professor H. J Annegarn, Ms L Cape
Chairman of the Board and CEO,
Challenges and opportunities for the CFO
THE ADVANCED LEADERSHIP INITIATIVE
Supplier Briefing Capital Works Program
REFLECTED IN JAMAICA’S ENERGY POLICY
Open and inclusive budgeting: Working beyond boundaries
Impact of Trade Agreements on South African Business
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
Regional preparatory process for Rio+20
BRINGING ECONOMIC DEVELOPMENT BACK TO RURAL REGIONS
Presentation to the Joint Budget Committee Tuesday, 18 November 2003
PRESENTATION TO THE PORT -FOLIO COMMITTEE ON HOUSING
Developing a Solar Roadmap Tapping every ray of the sun
Sustainable EU Research Infrastructures
CES Locality working and enabling communities
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Gabriela Ehrlich IEC Global Head Marketing
MELBOURNE RENEWABLE ENERGY PROJECT
IAEE European Conference: Session 1C
Background to The Conference
CONNECT: Sydney A New Platform for City Development
Roadmap for moving to a competitive low carbon economy in 2050
CRUE – The Way Forward Vicki Jackson
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
KICS – is there scope for Southampton researchers?
The Canterbury Clinical Network
SOUTH AFRICAN INSURANCE ASSOCIATION
ACCELERATE THE GROWTH OF YOUR BUSINESS
REVIEW OF KENYA ENERGY MIX FOR SUSTAINABLE DEVELOPMENT
PRESENTATION TO THE PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY
Progress on the Renewable Energy IPP Procurement Programme
PRESENTATION TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITEE ON ENERGY
OUTLINE RE Programme Objectives Integrated Resource Plan
Portfolio Committee on Social Development: Public Hearings
Coin street neighbourhood centre, London 14 September 2018
NUM WESTERN CAPE SUBMISSION ON IRP 2018
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Surrey County Council Transformation Programme
Presentation to the Portfolio Committee
Presentation transcript:

PANEL DISCUSSION ON RENEWABLE ENERGY PROCUREMENT FOR INDEPENDENT POWER PRODUCERS BIDDING: WINDOW 1 Johan van den Berg Chair: Steering Committee South African Renewable Energy Council 7 June 2012 6/8/12

The South African Renewable Energy Council During 2011, the SA Government through Nedlac formed the vision of a Green Economy. The renewable energy community participated. The Green Economy Accord, was signed in November 2011 – see . On P 19 (SESSA, SAPVIA, SASTELA, SAWEA undertake to…..:“establish an organisation that will facilitate the renewable energy sector working in partnership with other social partners in the development of the sector.” Press releases of progress ; ; ; Honoured and thankful to be addressing the PCE.   22

Introduction SAREC is very encouraged and heartened by the sustained Government initiative to procure RE and build an industry. SAREC fully supports the drive towards localisation, local benefits, job creation and community involvement. SAREC supports price efficiency and value for money. SAREC aims to help build a strong, vibrant and sustainable RE industry in SA for the long term. Our comments today are guided by what is required for sustainability that renders long term benefits to “South Africa Inc”. 33

In summary The process has for the greater part been run professionally and transparently South Africa seems set to have a RE industry soon – with better energy security, more jobs and other socio-economic benefits. Prices have dropped significantly between rounds 1 and 2. We caution against a price “race to the bottom” with the accompanying adverse consequences seen in other countries. We welcome the local content levels achieved so far and urge that the rate at which it is increased be managed very carefully. We urge that medium term certainty on further procurement is critical to ensure long term, sustainable localisation. We think the rules of the bidding process are undemocratically secretive. We point out that participating in the bidding is complex and expensive and creates challenges for smaller and emerging players. 44

The procurement process – complexity and cost The system seems designed to avoid cavalier bids that cannot be built in the real world and that delay everything: Bid bonds as high as ZAR 13 million, requirement for under- written debt and equity, very stringent documentary requirements. Also preferred bidder bonds as high as ZAR 26 million. This within the context of a bidding system is essential, however: Typical bid may be 3,000 – 5,000 pages x 7 hard copies Cost to prepare may be ZAR 2 – 4 million (mostly legal and consultancy) Time to prepare several months for a team of people Can cavalier bids not be avoided in a slightly simpler fashion? 55

The procurement process – rules and process In terms of the bid rules, participants must pay ZAR 15,000 to receive a copy of the bid documents. The reason is not clear to us. The rules of what is a public tender process are secret and no participant is allowed to divulge the content of the bid documents. We do not think this is democratic or healthy. The reason may have been to prevent collusion. We think there may be better ways to achieve this and that secrecy in public tenders should be avoided. We urge that aggregated data be published after each round. 66

Procurement – visibility, stability, predictability (1) The IRP 2010 contains an energy blueprint until 2030 containing significant renewables 77

Procurement – visibility, stability, predictability (2) The present procurement process includes all IRP allocations for RE until 2016. In some technologies, the 2016 “quota” may be filled as early as round 3 - closing in a few months. There is then a 3 – 4 year period before 2017 – it is critical that procurement continues in this time to keep momentum, grow the industry and especially to enable localisation. We urge that clarity is needed on this asap to create the confidence that will permit the building and financing of local manufacturing plants and facilitate success for BBBEE companies and community trusts being created now. RE projects are large infrastructure projects that have a multiplier effect and can play a key role in the government’s new infrastructure driven growth model. 88

Putting SA on the RE map – creating an industry At present far less than 1% of our delivered electricity comes from grid connected wind or solar power. Within 12 months more than 1,000 MW’s of RE of various technologies will be under construction (including Solar Thermal, Solar PV and Wind power). This will fundamentally change our energy sector – make it more modern and more diversified. If we stay with the IRP 2010 and avoid cavalier bids, by 2015 we can be a significant player in the global RE sector. 99

SA’S POSSIBLE PLACE IN 2015 RE GLOBAL PECKING ORDER

“Cavalier” bids If “cavalier” bidders are successful in their bids but unable to build, the MW’s allocated to them are delayed by at least 6 months. If they actually start building and then stop or go bankrupt, the MW’s may be delayed by several years (before MW’s can be put back into the “bidding pot”). Various mechanisms in the bid rules are aimed at preventing this, most prominently a ZAR 200,000/MW “Preferred bidder bond” payable within 14 days. This could cost up to ZAR 26 million for large projects. We urge optimisation of collaboration between licensing Government Agencies to ensure no bid bond is ever forfeited due to Government factors. We further urge that in cases where non-performance can be laid at the door of the bidder, the bid bonds should be forfeited without exception - this will prevent cavalier behaviour. 11111111

Costs, value-for-money, long term sustainability The process is fiercely competitive This rapid drop looks like a “race to the bottom” - very early in the life of a new industry If there is no ability for projects to absorb set-backs and remain profitable, some will not be built/completed and others will meet with bankruptcy in time. We urge that value-for-money should be approached broadly, with an insistence that projects succeed to ensure energy security, the building of an industry, job creation, community benefits and localisation. “Stop-start” should be avoided along with a race to the “bottom”. Debt and equity finance for the long term should be courted throughout. 12121212

VALUE FOR MONEY IN CONTEXT – EXTERNATILIES AT KUSILE (University Pretoria)

Conclusion The RE industry is organised and wants to work with Government to build a strong, sustainable local industry that contributes to Commitment 3 of the Green Economy Accord - 50,000 RE jobs by 2020. Collectively, the socio-economic objectives must be met. We need to learn from Round 1 and 2 procurement and improve/optimise. Sustainability is the key word. The challenges that exist can be met through co-ordinated action. SAREC offers to host a workshop with all stakeholders to find the best way forward. 14141414

THANK YOU Johan van den Berg SAREC johan@sawea.org.za 082 925 5680