Status of MXCuBE Beamline Control at BESSY II

Slides:



Advertisements
Similar presentations
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Advertisements

1 QED In Vivo USB Input Output Box configuration This tutorial contains a number of instructions embedded in a great deal of explanation. Procedures that.
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
Sterling Chadee Director of Statistics. The processing of the data from the field enumeration began in July 2011 until September All data processors.
PC MANAGER MEETING January 23, Agenda  Next Meeting  Training  Windows Policy  Main Topic: Windows AV Service Review.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
Understanding typical users for this instrument Graduate studentGraduate student –not an X-ray expert but wants to make a spatially resolved measurement;
A Guide to Oracle9i1 Database Instance startup and shutdown.
Kappa Group Meeting - September BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Slide: 1 ICEPAP ICEPAP Software Status Presented by Manuel Perez Member of BLISS group.
Petra III Status Teresa Núñez Hasylab-DESY Tango Meeting DESY,
Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 1 Beamline GUIs at ALBA Guifre Cuni on behalf of the Controls Group.
Almega. Visible Raman Microscope
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
Elke Zimoch, EPICS Workshop 2004 Japan EPICS at the Protein Crystallography Beamlines of the SLS.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Tango - Icalepcs 2009 ESRF. E Taurel - Icalepcs TANGO kernel status and evolution Brief introduction What's new since Icalepcs 2007 New projects.
Free software in schools users conference LinEx: Open source in all the schools of Extremadura José L. Redrejo Rodríguez Oslo, October 13th, 2008.
SAP Business One 9.0 integration for SAP NetWeaver Installation and Technical Configuration 2013 March.
LCLS Commissioning & Operations High Level Software
Web Programming Language
Control software and MxCube integration
Corporate Presentation
Project Target Develop a Web Based Management software suit that will enable users to control Hardware using standard HTTP & Java Applet compatible web.
Machine operation and daily maintenance management in SOLEIL
HDR Handling at EMBL-HH Status Report
TXO freelance mxCuBE & more.
The software side of the moon
Device Pool Status Report TANGO Collaboration Meeting April 17, 2008
Status and Plans for InCA
l 66TH MEETING OF THE ESRF l May 2014 l Author
ONYX 12.2.
LinEx: Free software in all the schools of Extremadura
J. Meyer European Synchrotron Radiation Facility (ESRF)
ISPyB for BioSAXS.
Week 2 - Friday CS361.
Multi- axis control for in-vacuum diffractometer
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
PLC-based control systems at SOLEIL - ICALEPCS 2017
ATF/ATF2 Control System
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Injectors BLM system: PS Ring installation at EYETS
Operational procedures and tools for scheduled shutdowns at CC-IN2P3
Savannah to Jira Migration
DESY Test Beam Facilities - Status and Plan
Online Software Status
TROUBLESHOOT THE STREAMING PROBLEM OF HULU PLUS ON ANY DIGITAL MEDIA Smart Tv Help Line Toll Free ( )
Sample Changer Robot (at PX beamlines)
Experimental Definition in SynchWeb for XPDF
Using git to get mxCuBE ready to install on your beamlines.
LCLS Commissioning & Operations High Level Software
How to Fix MacBook Frozen Problem?.
Outline Overview Development Tools
The EPICS running envirionments in the five accelerator projects
Introduction to Systems Analysis and Design
Non-user time 2/7 of total
 YongPyong-High Jan We appreciate that you give an opportunity to have this talk. Our Belle II computing group would like to report on.
ESRF Status report.
The programming page of the Brick
SOLARIS Tango Control System Status
Dual gripper sample changer implementation in MxCube
Performing Database Recovery
Present Status of Orbit Stabilization at SPring-8
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Linac Diagnostics Commissioning Experience
Requirements Analysis Document Presentation
Introduction to BIOS Prof. Shamim Ahmad Hakim
Alignment, Scanning Malcolm Guthrie
Presentation transcript:

Status of MXCuBE Beamline Control at BESSY II 2018/5/20 Status of MXCuBE Beamline Control at BESSY II Alexandra Kastner, on behalf of the HZB MX group MXCuBE Meeting, 16. - 18. January 2017, ESRF Grenoble find a good intro I would like to give you a brief overview, what happened since our last MxCube meeting atBESSY II Give a short overview of topics

Overview of MX Beamlines at BESSY II 2018/5/20 Overview of MX Beamlines at BESSY II Sample preparation lab Terminal center BL14.1 BL14.2 BL14.1 – 14.3 optics hutch Spectro lab BL14.3 We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow. Shared optics hutch for all three MX-Beamlines 2 MAD beamlines BL14.1 and BL14.2 from 5.5 keV to 15.5 keV One fixed energy side station BL14.3 at 13.8 keV

MX Beamlines at BESSY II 2018/5/20 MX Beamlines at BESSY II BL 14.1 BL 14.3 Multi-axis goniometer MD2 with MK3 PILATUS 6M (12 Hz) Irelec CATS sample changer Marresearch Desktop Beamline (DTB) Rayonix Mosaic 225 Manual sample mounting First of all: thanks again to Vicente for spending the whole week on our system. This helped us a lot and we were able to remove several obstacles. One was the communication between MD2 and HWO, which did not update when beamposition changed. This works now. Then we could improve the handling of MD2 motors the sample centring. Next we managed to enable a chained load for the sample changer and also have an automatically refreshed display of the sample list which did not work for us before. These were our most severe show-stoppers which could be removed, but some things still needed to be done.

Major upgrade of hardware Plate manipulator 2018/5/20 BL14.1 work in progress Upgrade of MD2 Major upgrade of hardware Plate manipulator Prosilica high resolution camera Control software based on Java Helical grid scans First of all: thanks again to Vicente for spending the whole week on our system. This helped us a lot and we were able to remove several obstacles. One was the communication between MD2 and HWO, which did not update when beamposition changed. This works now. Then we could improve the handling of MD2 motors the sample centring. Next we managed to enable a chained load for the sample changer and also have an automatically refreshed display of the sample list which did not work for us before. These were our most severe show-stoppers which could be removed, but some things still needed to be done.

User operation since September 2016 - First structure solved ! 2018/5/20 BL14.2 Setup User operation since September 2016 - First structure solved ! Nanodiffractometer G-Rob from NatX-ray Stäubli arm Dewar from Absolute Systems During our work on MxCubeV2 with Vicente, we observed many crashes, mainly when PyMCA-related operations were performed. This could be solved by changing the operation system. Since we are using Debian 7 instaed of Scientific Linux, we had no more crashes. One remaining problem we still have to deal with is the interaction of certain signals in MxCube. For example one could start a sample changer action while data collection is still running. This should be prevented. So - unfortunately- we are still not in user operation with MxCube at Beamline 141. Even more severe than any issues is the booking situation at BL 14.1, because of lacking BL 142, there is no shift left for development. Users first. Pilatus 3S 2M

BL14.2 Nanodiffractometer 2018/5/20 BL14.2 Nanodiffractometer Cryojet On-axis microscope + Frontlight Carbon nozzle Fluorescence det Backlight Beam shaping devices

BL 14.2 Control Software Pilatus Devices Tango Device Server Nanodiff 2018/5/20 BL 14.2 Control Software Devices Tango Device Server Nanodiff - Airbearing axis - Stepper motors - Piezo motors AerotechEnsemble OmsVme58 OmsMaxV S P E C M X C u B E 2 Pilatus LimaCCDs G-Rob GRS_Server Front-/backlight Own TDS We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow. Fluorescence Detector Filterwheel Cryojet WagoRelay

Adaptions made to our specific requirements 2018/5/20 MXCuBE status on site Still on MXCuBE V2.2 Qt4 Adaptions made to our specific requirements We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow. 4. Sample centring | 3. Collection method | 2. Sample selection | 1. Beam parameters

Get newest version of master Merge HZB-spezific changes into branch 2018/5/20 Our MXCuBE Roadmap Update to MXCube 2.3 Qt4 Get newest version of master Merge HZB-spezific changes into branch Test (and hope the best) Update to MXCube 2.3 Qt4 MXCuBE 3 Watch development Change when „matured“ We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow.

Derive Gonio from GenericDiffractometer 2018/5/20 Our five pence ... Suggestions Derive Gonio from GenericDiffractometer Derive DataCollection from AbstractCollection Would faciliate adaptions We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow.

Thank you for your attention. Questions? 2018/5/20 Thanks Thank you for your attention. Questions? We are currently facing a rather long shutdown, due to general upgrade and maintenance of BESSY II The long shut-down gives us some user-free time which we want to use for concentrating on our own upgrade-work on beeamline 14.2. But on the other hand - we have no beam during this period, so we are a bit handicapped in testing and finalize things. Anyway, we are strongly focused on getting Beamline 14.2 in operation until mid of January when user operation starts again. Before I give you a closer look at the status of BL 14.2 , I first would like to talk about our MxCube activities at BESSY II. Scarce but anyhow.