Status report on CJK NGN Working Group

Slides:



Advertisements
Similar presentations
Jeju, 13 – 16 May 2013Standards for Shared ICT GTSC-10 Summary Kishik Park, Ph.D. GTSC-10 Chair, TTA Document No: GSC17-CL-04r1 Source: GTSC-10 Contact:
Advertisements

OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
CJK & APT activities November 2-3, 2004 WWRF Steering Board Toronto, Canada November 2-3, 2004 WWRF Steering Board Toronto, Canada Youngkyun KIM Senior.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Geneva, Switzerland, 14 November 2014 AREGNET Arab Cloud Project Soumaya Benbartaoui, Member of Cloud Computing Project Team - AREGNET-
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
Tatsuji JAPAN CJK-SITE China, Japan, Korea Standards cooperation on IT and Electronics.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT CJK activities on WPT Standardization Mr. YJ CHUNG (TTA) on behalf of CJK-WPT WG* Document No: GSC17-PLEN-24.
The 7th CJK NGN Working Group Meeting October 10 ~ 11, 2006, Tokyo, Japan Performance Objectives for performance testing on CJK NGN testbed Hyungsoo Kim.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
GSC-16 Closing Plenary Summary Report
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
ITU-T Focus Group on Cloud Computing
Chae-Sub LEE TTA Summary Report of 6th FG NGN Chae-Sub LEE TTA
(Tokyo, Japan, 4-5 February 2013)
8th CJK Plenary NGN Workshop for further collaboration March, 2008
CJK NGN test-bed study Phase III&IV
IAEA Perspectives on Implementation of the optimization principle
Report of 19th UNIOT-WG Meeting
Yoichi MAEDA, CEO & SVP of TTC
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
TTC Activities on IPR in Standards
CJK 10th NGN-WG (Status of NGN/NID-WG Discussion) Chae Sub, Lee
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
Proposal for the CJK NGN Test-bed Activity
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
CJK NGN WG (Proposal for drafting group on IPTV Standards)
GSC Emergency Communications Task Force Report (GSC-EM TF)
TTA activities on IMT-Advanced
Report of ABLOS to HSSC November 2017, Ottawa, Canada
ITU-T Study Group 13 Multi-protocol and IP-based networks and their internetworking Brian Moore.
Review of ITU activities since GSC-10 (08/05)
CHEMICAL ACCIDENTS Programme
Taesang Choi CJK Testbed Collaboration for NGN Taesang Choi
Chemical Monitoring mandate
The 5th CJK IT Standards Meeting
Draft mandate for an activity on emissions of priority substances
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
GSC-16 Closing Plenary Summary Report
Admin Working Group Report to Closing Plenary
Yoichi MAEDA, CEO & SVP of TTC
Informal document GRPE-78-23
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Roles and Functions of CJK NGN WG for NGN Standardization Chae-Sub LEE
CJK activities on WPT Standardization
ITU-T Focus Group Next Generation Network
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
GSC IMT Task Force Report
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
Joint ITU-WHO Workshop on e-Health Standards and Interoperability (Geneva, Switzerland, April 2012) Session 7 chair’s notes from session 7 open.
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
Presentation transcript:

Status report on CJK NGN Working Group 29th March, 2005, Tokyo, Japan Yoichi MAEDA Chairman of CJK NGN Working Group

Key achievement of NGN-WG Agreement on the objectives of NGN-WG Agreement on the key tasks of NGN-WG Agreement on the organizational procedure of NGN-WG such as working method, rules for participants and contributions, guidelines of meeting host and publication. (Refer to ANNEX1) Agreement on setup of a new task group on NGN-testbed in NGN-WG (Refer to ANNEX2) CJK-NGN Ad-hoc meetings were held before the FG-NGN and SG13 meetings and contributed to the international standards activities.

Objectives and tasks of NGN-WG Cooperation among CJK to promote and reflect the studies on NGN requirements and solutions to the relevant International NGN standardization activities. Tasks Collect and exchange industry/standard information on NGN-related activities of each country, Identify key standard areas to provide end-to-end multimedia services over future NGN, Pursue maximum commonality of NGN-related standards, Confirm interconnectivity and interoperability of NGN through interoperability tests among interested parties. Phased approach will be taken from the top to the bottom of above items.

Working method; Two level meetings Working group meeting High level standard direction and selected major technical issues are discussed to promote the CJK collaboration. The meeting is expected to be held as much as possible in conjunction with the CJK meeting. Additional WG meetings can be held with permission by the CJK plenary. The progress report will be made at the CJK plenary. Ad hoc meeting by technical experts Key specific technical issues are discussed among technical experts who participate in the relevant ITU-T meeting. The meeting is held in the previous day of each NGN-related ITU-T meeting to share the standards views among the CJK members to lead the discussion.

NGN-WG Management structure Chairman: Mr. Yoichi MAEDA (TTC, Japan) Vice Chairman: Ms. Duo LIU (CCSA, China) Vice Chairman on Global Coordination : Mr. Chae-sub LEE (TTA, Korea) Duration; One-year term (July 2004 – June 2005) Chairman Vice-Chairmen NGN-WG meeting Ad hoc meeting Task group Task group

Meeting history WG meetings Ad hoc meetings 1st CJK NGN WG Meeting (6 July 2004, Seoul, Korea) hosted by TTA 2nd CJK NGN WG Meeting (11-12 November 2004, Tokyo, Japan) hosted by ARIB/TTC 3rd CJK NGN WG Meeting (28-29 March 2005, Tokyo, Japan) hosted by ARIB/TTC Ad hoc meetings 29 November 2004 at Geneva for 4th FGNGN. 13 March 2005 at Jeju Island for 5th FGNGN.

Major topics 1st WG meeting Assignment of chair and vice chair, introduction of standard activities in each country, key issues on NGN and QoS studies, requirements for interworking 2nd WG meeting Review of work procedure, review of FGNGN activities, study on IMS, core network QoS, inter-country QoS, initiation of release 2, Ad hoc meeting at 4th FGNGN Introduction of key contributions toward 4th FGNGN Ad hoc meeting at 5th FGNGN Introduction of key contributions toward 5th FGNGN 3rd WG meeting Agreement of WG’s work procedure, identification of task on the testbed

Contribution Status from CJK Analysis of Participants on FGNGN CJK Others Total 1st 33 75 108 2nd 19 47 66 3rd 54 67 121 4th 60 63 123 5th 117 62 199 283 334 617

Contribution Status from CJK Analysis of Input Documents CJK North America Europe Others 1st 2 12 23 2nd 8 22 3 33 3rd 60 48 11 4th 46 47 21 5th 73 29 24 Total 289 162 56 113

CJK contribution to NGN Global Standards NGN standard activities were initiated by Europeans But it was not enough to make global notification CJK involved in this area since the 1st JRG-NGN meeting at Munich, October 2003 After joining CJK in ITU-T based activity including various Workshops, NGN standards became global issue Especially FG NGN group was launched at June 2004 based on the agreements which made at Beijing April 2004 among ITU-T Europe, North America and Asian Key members After the launching of FG NGN, CJK members become most important members with enormous contributions CJK is now has a key leading role for the global NGN standards

NGN-testbed task group in NGN-WG Key objectives of NGN-testbed (Refer to ANNEX 2) - Building a common NGN technology testing infrastructure - Feasibility testing prior to NGN commercial deployment - Interoperability testing for NGN components - Providing NGN service development platform for inter- country issues - Cooperation with other international NGN related testbeds NGN-WG requests the CJK meeting to give an endorsement on the launch of the NGN-testbed task group and to provide high-level support for the testbed project. Dr. Taesang Choi (TTA) was nominated to the NGN-testbed task leader.

Future meeting plan NGN-WG requests the CJK meeting to endorse the following meetings as the NGN-WG activities. Ad hoc meeting at 6th FGNGN on Sunday, April 24 in Geneva 4th NGN-WG meeting on Friday, June 24 in Kunming, China Ad hoc meeting at 7th FGNGN on Sunday, June 26 in Kunming, China Ad hoc meeting at 8th FGNGN on Sunday, August 28 in Geneva, Switzerland Ad hoc meeting at 9th FGNGN on Tuesday, November 29 in Geneva, Switzerland 5th NGN-WG meeting on December 15-16 in Seoul, Korea 6th NGN-WG meeting on April 10-11 in Beijing, China with the 6th CJK meeting

Conclusions NGN-WG agreed the objectives, the tasks and the organizational procedure of the WG. CJK-NGN members contribute to the NGN global standards activities in the FG-NGN and SG13 meetings and play a key role of the standards activities. NGN-WG agreed to setup a new task group on NGN-testbed in NGN-WG and request some support to the CJK members. NGN-WG proposed future Ad hoc meeting and NGN-WG meeting plans before the next CJK meeting in April, 2005.