The Republic of the Union of Myanmar Ministry of Electric Power

Slides:



Advertisements
Similar presentations
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
Advertisements

Michigan Environmental Education Curriculum Support (MEECS) Michigan Environmental Education Curriculum Support (MEECS) Energy Resources Unit Lesson 3.
12.1 Electricity at Home (Pages )
National Electrification Planning for Myanmar (NEP):
11 PUBLIC WORKS AND INFRASTRUCTURE DEVELOPMENT ENERGY & ELECTRICITY PROJECTS IN THE CENTRAL REGION Director: K.J Leepile SEPTEMBER 2011.
Heysham South Wind Farm Update May Key Facts Final Layout -3 turbines, 80m to hub, 125m to blade tip -Up to 7.5MW -Electricity for 4,200 homes,
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
Outline of JICA’s Assistance prepared for
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Electricity Transmission and Distribution. Transformer A device that transfers electricity from one circuit to another.
Ensure the quality of the data National Bureau of Statistics of China September 2012.
Rural Electrification Institutional Experience: Case of TUNISIA Ahmed Ounalli(*) Director, Strategic Studies Group-STEG Energy Week at the World Bank 6-9.
Policies.
The Ukrainian Municipal Credit Market Development V.G. Кozyr Executive Director of the Ukrainian Municipal Development Fund.
JESSICA IN LITHUANIA: An Effort to Renovate Apartment Blocks Inesis Kiškis Lithuanian Ministry of Environment BUDAPEST, NOVEMBER 6, 2013.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Rural Electrification Access by Department of Rural Development
New Town Development and Urban Renewal
Budget Financing in Myanmar Daw Ni Ni Than Director Treasury Department.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
SWS and Electrification Lessons from Ghana’s Experience. By: Jabesh Amissah-Arthur, Managing Partner,
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of.
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
132KV GSS PIPAR CITY JODHPUR
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Mandalay Region Office Priorities and Detailed Description.
PROCUREMENT UNDER THE PROJECT National Electrification Project.
Submitted To:- Submitted By:- Mr.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayin State Office Priorities and Detailed Desription of.
MAP-21 Formula Briefing Preliminary DRAFT. Moving Ahead for Progress into the 21 st Century (MAP-21) MAP-21 was passed by Congress and signed by the President.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
Single Phase and three Phase Distribution Substation
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Eastern Shan State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description.
Communications channels, tools and methodologies
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
SUB-STATIONS.
Electricity is produced at the power station.
The distribution grid Carcano & Cividini V A/AUTOMAZIONE
“Electricity Supply Reliability Project - Additional Financing”
Information about the resort recreation area "Kenderli"
Off-grid Electrification Department of Rural Development
The Republic of the Union of Myanmar Ministry of Electric Power
Basics of electrical engineering
The Republic of the Union of Myanmar Ministry of Electric Power
Installation And Estimation of Service Connection
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
Tribal Transportation Program Update
BRIEFING ON THE INTERCONNECTION LINES OF THE
Overview of Electrification Options
Presentation transcript:

The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Northern Shan State Office Priorities and Detailed Description of Electrification Plan For Northern Shan State Dated -21.Oct.2015

Priority Electrification Project List for Northern Shan State The following facts are agreement after discussion with Chief Minister (Shan State) To be performed priority the villages still without Electricity, which have along the main road. To meet the electrical safety and voltage to establish priorities. To Build quality products with proper power distribution Line. The villages within 2 miles from National Grid Line.(11 kV Line) To be performed priority villages having households more than 100 and above. To be explain the public of villages to construct the low voltage line by local fund. In areas with difficult transportation to go to all the relevant authorities spicy leaves. And then, the remain villages will be implemented continuously by National Electrification Plan. ESE (Northern Shan State) will implement the work done under management MOEP coordination especially with local Government.

Priority Electrification Plan for Northern Shan State (Within 2 miles from Existing 11 kV Distribution Line) No Distric No; of Village To be Electrif- ied No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transp- ort Cost Constru ction Cost Total kVA Trans port Cost 1 Lashio 77 3511 16781 64.42 1540.153 83.746 246.729 1870.63 4650 78 786.334 83.527 34.485 904.346 2774.974 53.57 2404.704 2 Kyaukme 61 5023 4971 21977 50.52 1207.832 65.676 193.492 1467.00 5220 69 731.339 129.34 49.400 910.083 2377.083 46.85 2103.050 3 Muse 49 4356 4370 22624 36.68 876.945 47.684 140.484 1065.11 4950 74 770.372 59.200 25.900 855.472 1920.586 62.72 2815.438 187 12890 12852 61382 151.6 3624.931 197.106 580.705 4402.74 14820 221 2288.05 272.07 109.785 2669.901 7072.643 163.1 7323.191

Electrification Plan for Villages of Northern Shan State (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 151.62 miles 400 V Distribution Line 163.14 miles 11/0.4 kV Distribution Transformer 221 Nos Muse District No. of Villages - 49 Nos Household - 4370 Estimated Cost - 1920.586 (mil kyats) Kyaukme District No. of Villages - 61 Nos Household - 4971 Estimated Cost - 2377.083 (mil kyats) Lashio District No. of Villages - 77 Nos Household - 3511 Estimated Cost - 2774.974 (mil kyats)

Priority Electrification Plan for Lashio District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Lashio 38 1723 8097 29.62 708.155 38.506 113.445 860.106 2200 39 390.067 52.327 20.835 463.229 1323.334 18.32 822.366 2 Hsenwi 15 608 2871 9.50 227.126 12.350 36.385 275.861 850 150.145 12.000 5.250 167.395 443.256 15.50 695.780 3 Tantyan 14 739 4010 13.10 313.195 17.030 50.173 380.398 950 144.992 11.200 4.900 161.092 541.490 13.25 594.779 4 Mongyal 10 441 1803 12.20 291.678 15.860 46.726 354.264 650 101.130 8.000 3.500 112.630 466.894 6.50 291.779 77 3511 16781 64.42 1540.153 83.746 246.729 1870.628 4650 78 786.334 83.527 34.485 904.346 2774.974 53.57 2404.704

Electrification Plan for Villages of Lashio District (Within 2 miles from Existing 11 kV Distribution Line) HsenwiTownship No. of Villages - 15 Nos Household - 608 Estimated Cost - 443.26 (mil kyats) To be Constructed 11 kV Distribution Line 64.42 miles 400 V Distribution Line 53.57 miles 11/0.4 kV Distribution Transformer 78 Nos Lashio Township No. of Villages - 39 Nos Household - 1723 Estimated Cost - 1323.33 (mil kyats) TantyanTownship No. of Villages - 14 Nos Household - 739 Estimated Cost - 541.49 (mil kyats) Mongyal Township No. of Villages - 10 Nos Household - 441 Estimated Cost - 466.89 (mil kyats)

Priority Electrification Plan for Kyaukme District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Kyaukme 12 886 4054 15.60 372.965 20.280 59.748 452.993 950 128.486 9.600 4.200 142.286 595.279 10.80 484.801 2 Hispaw 10 484 481 2242 7.35 175.724 9.555 28.151 213.429 650 102.680 82.144 28.750 213.574 427.004 5.98 268.436 3 Naungcho 731 682 3416 11.00 262.988 14.300 42.130 319.418 800 123.836 137.636 457.054 10.10 453.379 4 Namtu 17 927 4317 9.50 227.126 12.350 36.385 275.861 1150 19 192.457 15.200 6.650 214.307 490.168 12.90 579.068 5 Moemate 1995 7948 7.07 169.030 9.191 27.078 205.299 1670 16 183.880 12.800 5.600 202.280 407.579 317.365 61 5023 4971 21977 50.52 1207.832 65.676 193.492 1467.00 5220 69 731.339 129.344 49.400 910.08 2377.083 46.85 2103.050

The additional electrification statement due to replacement 66/11 kV substation for Northern Shan State No Town ship To be Constructed The effective area (within 2 mile) Estimate Cost (millon kyats) Substation 66kV Line (mile) 33kV Line (mile) Total Villages Total House hold Total population Material Installation Total 1 Hispaw 33/11 kV 5 MVA to 66/11 kV 10 MVA with (2) bay   10 484 2242  1588.49  125.3  1713.79 125.3  1713.79 

Electrification Plan for Villages of Kyaukme District (Within 2 miles from Existing 11 kV Distribution Line) Moemate Township No. of Villages - 16 Nos Household - 1995 Estimated Cost - 407.58 (mil kyats) To be Constructed 11 kV Distribution Line 50.52 miles 400 V Distribution Line 46.85 miles 11/0.4 kV Distribution Transformer 69 Nos Namatu Township No. of Villages - 19 Nos Household - 927 Estimated Cost - 490.17 (mil kyats) Hsipaw Township No. of Villages - 10 Nos Household - 481 Estimated Cost - 427.00 (mil kyats) Kyaukme Township No. of Villages - 12 Nos Household - 886 Estimated Cost - 595.28 (mil kyats) Naungcho Township No. of Villages - 12 Nos Household - 682 Estimated Cost - 457.05 (mil kyats)

Priority Electrification Plan for Muse District (Within 2 miles from Existing 11 kV Distribution Line) No Township No; of Village To be Electrified No of House House hold Popu lation To be constructed Estimate cost (Mil Kyats) Task regional Cost for 11 kV Line 11/0.4 kV Transformer 400 V Lines (Miles) Estimate Cost (Mil Kyats) mile Material Cost Transport Cost Constru ction Cost Total kVA Trans port Cost 1 Muse 12 1040 5394 8.20 196.046 10.660 31.406 238.112 1150 13 142.939 10.400 4.550 157.889 396.001 9.90 444.401 2 Namtkham 11 1234 6354 11.30 270.160 14.690 43.279 328.129 1450 16 176.998 12.800 5.600 195.398 523.527 14.37 645.055 3 Kukhine 22 1655 8826 16.40 392.091 21.320 62.812 476.223 2050 39 385.417 31.200 13.650 430.267 906.490 29.70 1333.203 4 Kyukoke 427 441 0.78 18.648 1.014 2.987 22.650 300 6 65.018 4.800 2.100 71.918 94.568 8.75 392.779 49 4356 4370 22624 36.68 876.945 47.684 140.484 1065.114 4950 74 770.372 59.200 25.900 855.472 1920.586 62.72 2815.438

Electrification Plan for Villages of Muse District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 36.68 miles 400 V Distribution Line 62.72 miles 11/0.4 kV Distribution Transformer 74 Nos Muse Township No. of Villages - 13 Nos Household - 1040 Estimated Cost - 396.00 (mil kyats) Pansai(Kyukoke) Township No. of Villages - 6 Nos Household - 441 Estimated Cost - 94.57 (mil kyats) Namkham Township No. of Villages - 16 Nos Household - 1234 Estimated Cost - 523.53 (mil kyats) KukhineTownship No. of Villages - 39 Nos Household - 1655 Estimated Cost - 906.49 (mil kyats)

The Statement of Fiscal Yearly Budget and Electrified Connection for Northern Shan State Sr. No Fiscal Year State/Region Capital Budget for ESE (mil Kyats) State/Region Capital Budget for DRD (mil kyats) Electrified Connection On Grid Off Grid Total Cost for 11 kV Line & 11/0.4 TR Total Cost for 400 V Line Total Village (Nos) Consumer (Nos) 1 2014--2015 Estimate (BE+RE) 655.245 445.777 1101.022 3614.540 26 1820 260 16457 2 2015-2016 Estimate (BE+RE) 2416.780 2548.000 4964.780 2841.856 77 4625 242 13537 3 2016-2017 Budget Estimate (BE) 3661.230 3786.400 7447.630 6452.400 48 3120 508 27617 Grand Total 6733.255 6780.177 13513.432 12908.796 151 9565 1020 57611

Main Materials List Transported to Lashio District Office Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 78 Lashio District, PMO Office 2 10 m Concrete Pole 3506 3 ACSR 95 mm2 134 4 11 kV, Disc Insulator with Fitting 8865 5 11 kV, Pin Insulator with Spindle 1747 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

Main Materials List Transported to Kyaukme District Office Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 69 Kyaukme District, PMO Office 2 10 m Concrete Pole 2766 3 ACSR 95 mm2 105 4 11 kV, Disc Insulator with Fitting 1420 5 11 kV, Pin Insulator with Spindle 7083 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

Main Materials List Transported to Muse District Office Sr No Description Quantities Transported Site 1 11/0.4 kV Distribution Transformer 74 Muse District, PMO Office 2 10 m Concrete Pole 2056 3 ACSR 95 mm2 76.26 4 11 kV, Disc Insulator with Fitting 1102 5 11 kV, Pin Insulator with Spindle 5118 6 Surge Arrestors, Disconnectors, Fuse 7 Other materials 1 Lot

THANK YOU