Idee e proposte per il programma di beam test di CaloCube

Slides:



Advertisements
Similar presentations
Advanced GAmma Tracking Array
Advertisements

EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
10L Simulations Close to current Titan parameters. Here’s the big picture… electron diagnostic “target planes” every 25  m preplasma L = 5μm (3) LASER.
SPIN PHYISICS at FAIR F. Bradamante J-PARC WORKSHOP, KEK November 30, 2005.
Accelerators Mark Mandelkern. For producing beams of energetic particles Protons, antiprotons and light ions heavy ions electrons and positrons (secondary)
Task Test beam infrastructure in Frascati G. Mazzitelli on behalf of LNF, Ferrara & Perugia INFN structure. AIDA kick-off meeting, CERN February.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
SOIPD Status e prospective for 2012 The SOImager2 is a monolithic pixel sensor produced by OKI in the 0.20 µm Fully Depleted- Silicon On Insulator (FD-SOI)
Multiplicity and Energy of Neutrons from 233U(nth,f) Fission Fragments
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
ExternalTargetFacility at CSR FRIB-China East Lansing Sun, Zhiyu Institute of Modern Physics, CAS.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
RNB Cortina d’Ampezzo, July 3th – 7th 2006 Elisa Rapisarda Università degli studi di Catania E.Rapisarda for the Diproton collaboration 18 *
ERHIC design status V.Ptitsyn for the eRHIC design team.
DEAR SDD --> SIDDHARTA
Coseners meeting Sept Future of European ISOL Peter Butler.
Material and thickness for pi0 Y.Sudo Univ. of Tsukuba 2008/07/18.
Abel Blazevic GSI Plasma Physics/TU Darmstadt June 8, 2004 Energy loss of heavy ions in dense plasma Goal: To understand the interaction of heavy ions.
| kvi - center for advanced radiation technology 1 KVI-Center for Advanced Radiation Technology M.A. Hofstee 19-sep-2014 RADSAFE Kick-off, CERN.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
1/30/2016Douglas E. Fields for the p+C CNI collaboration 1 Test of Small Angle Elastic Proton-Carbon Scattering as a High Energy Proton Beam Polarimeter.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
CNS CVD Diamond S. Michimasa. Properties of diamond Extreme mechanical hardness and extreme high thermal conductivity Broad optical transparency in region.
Prototypes photon veto detectors for NA62 experiment CERN M. Raggi - INFN/Frascati for the NA62 Photon Veto Working Group LNF, RM1, NA, PI, SOFIA First.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Prompt dose upstream the 12-ft concrete shielding blocks Igor Rakhno May 4, 2007.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Beam Test Facility (BTF) B. Buonomo, L. Foggetta, G. Mazzitelli, L. Quintieri & P. Valente UA9 Crystal Collimation Workshop, La Sapienza 25 February 2011.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Accelerator Division Activities Andrea Ghigo on behalf of INFN-LNF Accelerator Division.
Fluka Simulations: Electron spectrometer window for AWAKE Jose A. Briz and V. Vlachoudis.
Accelerator Division Activities
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Induced-activity experiment:
2^ CaloCube meeting Firenze, 20 Febbraio 2015 Oscar Adriani
Un anno al CERN ITP Academy 2017 – Benvenuti! 6/1/2018
S. Bartalucci, R. Bedogni , B. Buonomo, A. Esposito , G. Mazzitelli, L
“hot spots” SIS100 internal beam dump Super-FRS production target
Programma di misure: fasci e bersagli da utilizzare
Setup beam intensities for FCC-hh
for the LNL-Ganil collaboration
Diagnostics of FRIBs beam transport line
The interaction region for FIRST (status report)
LNF - Beam Test Facility Apr. 28 – May 03
Stato della Calibrazione EM
L. Acosta1, M. A. G. Álvarez2, M. V. Andrés2, C. Angulo3, M. J. G
Radiation Monitor: Concepts, Simulation for an Advanced Read Out
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Proposal to the ISOLDE and Neutron Time-of-Flight Committee Effects of the neutron halo in 15C scattering at.
OPERA Stato dell’esperimento Run 2007
WP11: electron and proton beam testing

EffiCAS Efficient Facility for Ions at CAS
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Muon Inverse Rotation and Acceleration
Study of the resonance states in 27P by using
Study of the resonance states in 27P by using
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Status and perspectives of the LNS-FRIBS facility
Design study for a Helios-like spectrometer at LNS
Update on Alternative Design of jleic ion injector Complex B
Update on MEIC Activities at ANL
MEIC Alternative Design Part V
Some Thoughts on the JLEIC Ion Injector
Presentation transcript:

Idee e proposte per il programma di beam test di CaloCube S.Albergo Catania CALOCUBE Starting Meeting - Firenze 22/01/2014

CALOCUBE Starting Meeting - Firenze 22/01/2014 TEST BEAM PROGRAM Facility beam Energy CERN p Up to 450 GeV ions 10- 150 GeV/u n 50 KeV – 1 MeV LNF BTF e+ e- 25-750 MeV X LNS p, ions Up to 80 MeV/u Messina e- 5 MeV CALOCUBE Starting Meeting - Firenze 22/01/2014

LNS - Turni in parassitaggio Beam Energy 20Ne 45 MeV/A 4He 13C 62 MeV/A 16O 14N 12C Beam Spot ~ 2-3 mm Intensity < 104-106 pps ~ 2 days ~ summer/fall 2014 Studio di un setup per selezionare i neutroni prompt emessi in avanti CALOCUBE Starting Meeting - Firenze 22/01/2014

LNS - Turni in parassitaggio Fascio di protoni da 62 MeV Beam Spot ~ 2-3 mm Intensity < 1011-1012 pps ~ 1 days ~ spring 2015 9Be solid target 3.5 cm thick Test con protoni scatterati e/o neutroni generati da un target sottile di 9Be CALOCUBE Starting Meeting - Firenze 22/01/2014

MESSINA ELECTRON LINAC - 5 Mev electron beam - easy access for our collaboration - feasibility tests already started CALOCUBE Starting Meeting - Firenze 22/01/2014

CALOCUBE Starting Meeting - Firenze 22/01/2014 LNF Beam Test Facility Un turno di misura di una settimana con fascio di elettroni già ottenuto da Valter Bonvicini dal 21 al 28 luglio 2014 (date soggette a possibili variazioni) CALOCUBE Starting Meeting - Firenze 22/01/2014

FUTURE RICHIESTE DI FASCIO Facility beam Energy CERN p Up to 450 GeV ions 10- 150 GeV/u n 50 KeV – 1 MeV LNF BTF e+ e- 25-750 MeV X LNS p, ions Up to 80 MeV/u Messina e- 5 MeV CALOCUBE Starting Meeting - Firenze 22/01/2014