August ICA Agenda Time Topic 8:00 – 8:15

Slides:



Advertisements
Similar presentations
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Advertisements

California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
1 Integrated Capacity Analysis Working Group July 25, 2016 OAKSTOP, Oakland, CA drpwg.org.
1 CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Meeting 2 – Distribution Planning Group (DPRG) Structure and Time Requirements.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Project Execution Methodology
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
LNBA Subgroup: Avoided Transmission Value
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
IT Strategy Roadmap Template
Timeline Roadmap Template
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Presentation by Sky Stanfield July 28, 2016
Locational Net Benefit Analysis Working Group
Status of the Planning Working Group’s (PWG) Efforts
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
POC Procedures Working Group (POC-pWG)
Integrated Capacity Analysis Working Group
August LNBA Agenda Time Topic 1:00 – 1:15
37th IG Meeting South Gas Regional Initiative
Health Resources and Services Administration (HRSA)
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
2018 Safety Group 1 – 5 Year Program Timeline Guide
Reliability Assessment Committee Reliability Workshop Priorities
37th IG Meeting South Gas Regional Initiative
2017 Safety Group 1 – 5 Year Program Timeline Guide
Introduction to Growth Scenario Working Group
ESB Networks Market Release Meeting of the IGG, March 5th 2009
This Presentation Pack is brought to you by
37th IG Meeting South Gas Regional Initiative
Integrated Capacity Analysis Working Group
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Rule 21 Working Group 2 Issue 6 subgroup
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
2019 Safety Group 1 – 5 Year Program Timeline Guide
Exit Capacity Substitution and Revision
IEEE IMT-Advanced Review Process
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 21, 2018
Rule 21 Working Group 3 CONFERENCE CALL JANUARY 3, 2018
Reliability Assessment Committee Reliability Workshop Priorities
Work plan and next steps – RDE-LDV working group
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
SCOTT NO meeting Measurement
Comments on IMT-Advanced Review Process
Gas Customer Forum DN Interruption Update - Introduction
Grouping Programs by Market Sector
IEEE IMT-Advanced Review Process
2017 Advantage Program Timeline Guide
2016 Safety Group 1 – 5 Year Program Timeline Guide
ICA Methodology Clarifications ICA Working Group 5/18/2016
Potential Minor Release Drop 4 Timeline & Scope
2012 Safety Group 1 – 5 Year Program Timeline Guide
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

August ICA Agenda Time Topic 8:00 – 8:15 Introductions & Follow Up Items Access to EPRI Studies (PG&E) 8:15 – 9:15 1.1.vi & vii: Finalize use cases 9:00 – 9:15 Commission Clarification on Demo A 3.1.b topics 9:15 – 10:00 Demo A 3.1.b.i: Method for DER Portfolio Responding to CAISO CAISO Presentation & Discussion 10:00 – 11:00 Demo A 3.1.b.ii: Method for Facilities using Smart Inverters SCE present evolution related to SIWG Ph 1,2 & 3 11:00 – 11:45 Demo A 3.1.f: Use of Smart Meter or Customer Load Data 11:45 – 12:15 Summary & Next Steps Review ICA WG Schedule & Topics

ICA WG Activity Status (Demo A) Activity from Ruling Status Completion Date Comments 3.1.a Update schedule for Demo A results Complete June 2016 3.1.b Recommend methods for evaluation of hosting capacity for the following resource types: i) DER bundles or portfolios, responding to CAISO dispatch; ii) facilities using smart inverters Scheduled Discussion topic will be clarified by CPUC ED and initial discussion at August mtg. 3.1.c Recommend a format for the ICA maps to be consistent and readable to all California stakeholders across the utilities' service territories with similar data and visual aspects (color coding, mapping tools, etc.) July 2016 IOUs circulated the proposed downloadable templates for comments and are moving forward for Demo A 3.1.d Evaluate and recommend new methods that may improve the computational efficiency of the ICA tools and process in order to calculate and update ICA values across all circuits in each utility's service territory in updated ICAs more frequently and accurately Anticipate update to be discussed in September mtg.* 3.1.e Evaluate ORA's recommendation to require establishment of reference circuits and reference use cases for comparative analyses of Demo Project A results   3.1.f Establish a method for use of Smart Meter and other customer load data to develop more localized load shapes to the extent that is not currently being done Topic will be discussed at August mtg. 3.1.g Establish definite timelines for future achievement of ICA milestones including frequency and process of ICA updates Clarification required from CPUC ED *The IOUs will provide updates on computational efficiency of calculations for both iterative and streamlined evaluation in September

ICA WG Activity Status (Long-Term Refinements) Activity from Ruling Status Completion Date Comments 3.2.a Methodology advancement and improvement: expansion of ICA to single phase feeders 3.2.b Methodology advancement and improvement: Ways to make ICA information more user friendly and easily accessible (data sharing) 3.2.c Methodology advancement and improvement: Interactive ICA maps 3.2.d Methodology advancement and improvement: Market sensitive information (type and timing of the thermal, reactance, or protection limits associated with the hosting capacity on each line) 3.2.e Methodology advancement and improvement: Method for reflecting the effect of potential load modifying resources on integration capacity 3.2.f Methodology advancement and improvement: Development of ICA validation plans, describing how ICA results can be independently verified 3.2.g Methodology advancement and improvement: Definition of quality assurance and quality control measures, including revision control for various software and databases, especially for customized or "in-house" software

ICA WG Issue Parking Lot Topic Date Action Comments How do ICA and LNBA models talk to each other in identifying optimal locations for DER development? July 2016 Referred to LNBA WG What is dynamic modeling and what is model validation? How will the regulators guide the three IOUs to a common methodology so that DER providers can look to see if they are fully representative in a dynamic more open platform? ICA WG - TBD Transparency of Methodology – will WG stakeholders be able to review and verify results alongside the CPUC ED? July 2016* Referred to ICA WG Will be part of discussion around 3.2.f for Long Term Refinements *Transparency of Methodology - Stakeholder Comment The ruling stated that both Energy Division and ORA would be responsible for viewing and validating the inputs, models, limit criteria and results. Discuss the limitations (if any) on market participants’ ability to review this content and the conditions under which this will be possible.  Working Group stakeholders interested in participating at this level of detail. One of the objectives in WG to evaluate results as part of the amendment to discuss assessment in WG – if there’s anything discuss in terms of methodology, IEEE data etc. in terms of increased transparency, anything in addition to consider?

ICA Working Group Working Group Meetings Engagement Topics Short Term May Jun July Aug Sept Oct Nov Dec Jan Feb Mar Apr Q2 ‘16 WG convened 10 days of Ruling - Project Plan filed 45 days of Ruling Q4 ‘16 Long-Term Refinement Status Report #1 Q4 ‘16 Demo A Final Report Q2 ‘17 Long-Term Refinement Final Report Deliverables: ICA Short Term (Demo A) 3.1.a Update Schedule for Demo A Results 3.1.b Hosting Capacity 3.1.c Data & Maps 3.1.d Computational Efficiency 3.1.e Use Cases & Reference Circuits 3.1.f Smart Meter & Customer Load Data 3.1.g Develop ICA Timeline Long-Term Refinements 3.2.a Single Phase Feeders 3.2.b Data Sharing 3.2.c Interactive Maps 3.2.d Market Sensitive Information 3.2.e Load Modifying Resources 3.2.f Independent Verification 3.2.g Quality Assurance & Quality Control