ROCC Operations and The PSA RSP Archive Concept Review 28 September 2017 Tanya Lim Archive Scientist.

Slides:



Advertisements
Similar presentations
Overview of the Data Archive Plan by Luc Joudrier & Dave Heather
Advertisements

09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Release & Deployment ITIL Version 3
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Available Tools for planning and Data Processing I. Musso.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre ROCC to Pasteur Payload ICDs E. Ferrentino.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
SIMCorBSIMCorB 1 Policies and Procedures n Data administration and quality assurance standards, policies, and procedures (8.2.1) n User requirements for.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
L. NExScI Operational Readiness Rafael Millan-Gabet Project Scientist, NExScI & Mihseh Kong, NExScI Software Engineer David Imel, IPAC & NExScI Manager.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
Archival Workshop on Ingest, Identification, and Certification Standards Certification (Best Practices) Checklist Does the archive have a written plan.
ESA UNCLASSIFIED – For Official Use ExoMars Pasteur Payload Status ExoMars Project Team Albert Haldemann ExoMars Payload and AIV Manager.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Science instruments data pipeline G. Martucci.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
The road to the first E2E tests
HOLD-TIME STUDIES.
PV 2009 Conference, 1-3 December, ESAC David J. Heather (1),
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Instrument Teams to SOC Test Specifications
Implementation of Quality indicators for administrative data
Well Trained International
Status Report of EDI on the CAA
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
From delivery to acceptance
Establishing and Managing a Schedule Baseline
SPICE, el servicio de información geométrica para ciencias planetarias
Software Configuration Management
Data Flows in ACTRIS: Considerations for Planning the Future
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OSIRIS Full Team Meeting
CAA-OR (End of Phase 1) CAA DWP Operations Review
GLAST Large Area Telescope:
ExoMars RSP Science Archive Concept Review [an informal non-corporate Workshop] 28 September 2017 Leo Metcalfe Science Operations Development Manager.
Persistent Identifiers Implementation in EOSDIS
Request a Content Change for Novartis.com
Software Configuration Management
The RSP Archive System RSP Archive Concept Review 28 September 2017
Active Data Management in Space 20m DG
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
The JWST Director’s Discretionary
Chapter 5: Project Scope Management
DM WBS Functional View Develop and maintain Prepare internal data
Engineering Processes
ENTSO-E Transparency Platform Vision Project
Introduction to Systems Analysis and Design
Amendment Invoice Task Force Progress Report
Envelope Concept report, PCS UG
Update on the GSICS Procedure for Product Acceptance (GPPA)
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Observing with Modern Observatories (the data flow)
Open Archival Information System
Amendment Invoice Task Force Progress Report
PDS4 Geometry Model Project
Large-scale spectroscopic surveys management
Metadata used throughout statistics production
Research Proposal and Report
The role of metadata in census data dissemination
ESA and Mars Express archive activities
Project Name Here Kick-off Date
Presentation transcript:

ROCC Operations and The PSA RSP Archive Concept Review 28 September 2017 Tanya Lim Archive Scientist

Data Flow

Data Selection in the ROCC Archive “The Data Archive and Retrieval Capability shall provide cataloguing of all ROCS data in such a way to guarantee an easy data browsing based on different parameters, like: Time / Time Range (UTC/LTST/LMST/RET) Sols Product generation time Product status (incomplete, preliminary, valid, final) Experiment Cycle / Vertical Survey / subsystem Geographical location on Mars surface Activity Data product Other metadata as reported in the ROCC to PPL ICDs.“

Delivery ROCC to ESAC From ROCC-ESAC ICD.. Delivery process description on ROCC side. It will be mainly composed by 5 steps: PPL archive preparers will review their instrument data products SDMT members define the local targets A-SDP post-processing pipeline is executed Geometry information insertion Target(s) references insertion SDMT members create and validate the delivery package Delivery package submission

PDS Data Levels Raw – Re-packed telemetry Partially Processed – Partly calibrated Calibrated – All instrument artifacts removed Derived – Scientific Results Minimum acceptable level for final archive is Calibrated

What will be Generated at ROCC? Raw: Micro-Omega (Raw Image Cube) WISDOM (Raw Sounding) Partially Processed: Adron (Data frames) ISEM (Partially Processed Spectrum) Calibrated: Clupi (Calibrated image, but also as secondary products) Ma_Miss (Acquired science spectra represented as physical quantities) MOMA (Contents of bins/sec) RLS (Calibrated Spectrum with Raman Shift vector and corrected in intensity) Derived: PanCam (not all Products) Colours reflect extent to which PI definitions agree with PDS definitions

So…. Only products selected by PI’s in ROCC archive will be selected for archival at ESAC Most products are generated outside of ROCC and not on tactical timescales These have to be delivered to ROCC, ingested into the ROCC system then manually selected for archiving at ESAC

Challenges for ESAC of this Approach Lack of Data Consistency Potentially inconsistent data processing Potential gaps Potential lack of continuity between data processing levels Inconsistent versioning between products in archive Duplicate products Not all data delivered… a lot of manual chasing… Keeping track of what we have and don’t have Version Control Overall Knowing when to conduct a data review Keeping track of proprietary status with an inconsistent data set Explaining these inconsistencies to the community

Mitigation Allow ESAC to view the ROCC DAR to see what products are present Ideally the DAR could indicate which have/have not been delivered Also allowing access to metadata would help ensure continuity ahead of delivery Track pipeline changes at ROCC Persuade PIs to allow deliveries to be as automatic as possible Ensure that the DAR can support this Keep up to date with secondary product generation, PI pipelines and plans Ensure delivery procedures from PIs to ROCC are well understood and tested

Rover Data Arrival At ESAC Bundle increments will arrive to a staging area These will be inspected by the AS and approved for ingestion These will then be ingested into the archive and re-validated on ingestion All data is ingested as proprietary Technically, within PSA, data release can be on a six month rolling basis or on request from PI via AS or PS An operational understanding for data release is not yet in place for EMRSP

These are normal work Open Issues Delivery schedule – current working assumption is monthly ESAC handling of deliveries Instrument Data Dictionaries Proprietary Handling – from an organisational standpoint What happens post-mission? These are normal work

Questions?