Installing DOT/ICC Exchange or Stationary Cylinders

Slides:



Advertisements
Similar presentations
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Advertisements

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
4.2 Student Book © 2004 Propane Education & Research Council Preparing and Installing Vapor Distribution System Components 4.2.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5 Student Book © 2004 Propane Education & Research Council 2.5 Operating a Truck, Tank Trailer or Tractor/Trailer to Deliver or Relocate ASME Tanks.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Designing and Installing Exterior Vapor Distribution Systems INTRODUCTION Course Overview and Objectives.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Tank Car Specialist Training Support Package November 2014 Module 13: Transfers.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.6 Student Book © 2004 Propane Education & Research Council 3.6 Performing Railcar Product Transfers.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
3.6.6 Student Book © 2004 Propane Education & Research CouncilPage 1 In the wake of the September 11 th attack and continuing terrorist threats, shippers,
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.4.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Bulk Plant Security Procedures In the wake of the September 11 th,
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Preparing Foundations for Cylinders & ASME Tanks
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
MODULE 3 Bobtail Equipment and Systems.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Welding Safety Test.
Designing DOT Exchange and Stationary Cylinder Installations
SAFE WORK INSTRUCTIONS
Information to the Customer
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Installing DOT/ICC Exchange or Stationary Cylinders 4.2.7 Proper cylinder installations must meet code requirements and safe working practices for service employees. In this module you will learn to identify: Factors related to the installation of DOT cylinders Procedures for installing DOT cylinders 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 1

Factors Related to the Installation of Cylinders Safety Precautions The following safety precautions are based on NFPA 58 and OSHA safety standards. Wear vinyl safety gloves and safety shoes during the loading, delivery, and installation of cylinders. Because of the size and weight of DOT cylinders that contain propane, proper equipment should be used for lifting or moving the cylinders. Stationary cylinders filled on site should be handled with little or no liquid propane in them. Figure 1. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 1

Factors Related to the Installation of Cylinders Safety Precautions Electrical tools that are used for installation must be three-wire (grounded) or double-insulated as prescribed by NIOSH, ANSI and OSHA standards. When using electrical hand tools, always use three-wire electrical extension cords with proper ground lugs and a grounded power supply. When working with electrical tools, do not place any tools or extension cords in water puddles or damp grass. When transporting cylinders to a customer site, always use proper equipment (i.e. tie-down straps, chains, etc.) to minimize cylinder movement on the truck while in transit. 4.2.7 Student Book  © 2004 Propane Education & Research Council Pages 1 & 2

Factors Related to the Installation of Cylinders Safety Precautions Only authorized employees of the company should assist during installation. AVOID ASKING FOR OR ACCEPTING ASSISTANCE FROM A CUSTOMER WHEN CYLINDERS ARE BEING INSTALLED. Do not allow the customer or any children to be in the immediate work area during installation. Politely explain the possibility of injury and ask them to leave. Do not leave equipment unattended until all tools and equipment have been returned to the service truck and locked up. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 2

Factors Related to the Installation of Cylinders Customer Relations The installation requires personnel to talk with the customer, verifying their preferences and communicating safety information and product warnings. Installation Planning and Documentation Because code and specific installation site requirements must be met, it is a good practice to use a worksheet during planning and installation. Some states require a similar worksheet to be filed with the local authority having jurisdiction or a state regulatory agency in order to obtain a permit to install cylinders. Review company procedures to determine when and how a cylinder installation worksheet should be used. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 2

Factors Related to the Installation of Cylinders Figure 2. Sample Planning & Installation Worksheet for a DOT Cylinder Installation 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 3

Procedures for Installing DOT Cylinders Step1: Prepare the cylinder(s), tools, and equipment required for the installation. Be sure to check the manufacturer test date and/or requalification dates on the cylinder. Do not transport or install any cylinder that is in need of being requalified. Select the proper equipment for transporting and handling the cylinders. Select appropriate cylinder foundation materials. Figure 3. Solid Masonry Block Foundations Two 100-Pound Exchange Cylinders or a Single 200-Pound Stationary Cylinder Single 420-Pound Stationary Cylinder 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 4

Procedures for Installing DOT Cylinders Multiple Cylinder Installations When more than two cylinders are installed, it is a recommended practice to install at least two cylinders on each masonry foundation. Concrete Foundations Check company procedures and state and local codes for requirements on concrete foundations Figure 4. Placing Vehicle Chock Blocks 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 4

Procedures for Installing DOT Cylinders Step 2: Verify the proper location for the cylinder(s) on the customer site. Figure 5. Distance Requirements for DOT Cylinders 4.2.7 Student Book  © 2004 Propane Education & Research Council Pages 5 & 6

Procedures for Installing DOT Cylinders Do not sacrifice or ignore any safety requirements for a location preferred by the customer! If another location cannot be found that meets all distance requirements, politely explain to the customer the reasons for the location. Figure 6. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 7

Procedures for Installing DOT Cylinders Figure 7. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 8

Procedures for Installing DOT Cylinders Figure 7. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 8

Procedures for Installing DOT Cylinders Step 3: Prepare the foundation for the cylinders. Step 4: Properly unload and install the cylinder(s) on the foundation and prepare the cylinder(s) for service. Figure 8. Masonry Block Foundation 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 9

Procedures for Installing DOT Cylinders Figure 9. Unloading and Installing Exchange Cylinders 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 10

Procedures for Installing DOT Cylinders Step 5: Explain any maintenance or safety precautions to the customer. The area 10 feet in any direction from the cylinders must be kept clear of loose or stored combustible materials. Sources of ignition must be kept at least 10 feet from the cylinders. Any valve or cylinder leaks must immediately be reported to the company. Explain the operation and function of the shutoff valve. Instruct the customer to close the shutoff valve in the event of any unusual odors or emergency conditions. Vent a small quantity of propane from the maximum fixed liquid level gauge. Ask the customer to “sniff” the vapor after the gauge is closed to determine if the customer can smell propane odorant. Explain the function of the relief valve. Provide the customer with copies of all applicable company safety information and product warning notices. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 11

Procedures for Installing DOT Cylinders IMPORTANT: If the cylinders installation includes installation of new vapor distribution lines, the new or modified lines must be pressure tested as required by NFPA 58 and 54. Prior to placing the distribution system into service, a leak check should be completed and documented as well. Follow your company’s procedures for completing & documenting all tasks you perform related to cylinder installation. 4.2.7 Student Book  © 2004 Propane Education & Research Council Page 12

Time to See If You Got the Key Points of This Module… Complete the Review on page 13. See if you are ready for the Certification Exam by checking off the performance criteria on page 14. 4.2.7 Student Book  © 2004 Propane Education & Research Council Pages ? & ?