Whole Building Retro-Commissioning at BU’s Photonics Center

Slides:



Advertisements
Similar presentations
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Advertisements

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?
Presenters: Bob Kilgore Matthew McReynolds Brenna Goode CHEMISTRY BUILDING RCX.
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
NARAGHI HALL 3 rd FLOOR VENTILATION MANAGEMENT IMPROVEMENT BEST PRACTICE AWARD HVAC DESIGN/RETROFIT 2014 CALIFORNIA HIGHER EDUCATION SUSTAINABILITY CONFERENCE.
Toward a Sustainable Campus Part II: Improving the Efficiency of the CNS Building Energy Systems Nitin Rajan ‘07 Physics Department Ithaca College.
Energy Valve Delta T Manager
2011 National Grid Energy Expo Proprietary & Confidential 1 Energy Management Systems 2011 National Grid Energy Expo April 7, 2011 Assis Flores Account.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
A Business Case for Multi-Tenanted Office Buildings Creating a Win for Owners, Managers and Tenants BOMA: Achieving High Performance Through Innovation.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Phoenix Convention Center Phoenix, Arizona What We’ve Learned From a Challenging Efficiency Goal Solution ShowcaseBetter Buildings Wendell Brase University.
Name of Building(s) or Project Speaker(s) Organization(s)
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Marriott Corporate Headquarters
Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
A Simple Path to Sustainability Presented by:. Steven P. Driver, Ph.D. Genzyme Energy Program Manager February
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Successful Energy Conservation Projects at University Research Labs
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
National Grid Your Partner in Energy Solutions
2017 Commercial Energy Efficiency Program
Integrating a Data Center into an Engineering Laboratory Building
Objectives Talk about the final projects Discuss HW2 and HW3 problems
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Variable Frequency Drive Savings Calculator Tools
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Efficiency in District Coiling System
Iron Forge Educational Center: U. S
Chilled Beam Performance:
pplelectric.com/businessrebates
Application of High Efficiency Chillers in Hong Kong Baptist Hospital
The Benefit of Including Energy Recovery System Analysis
Abbas Shirian, PE Certified GeoExchange Designer
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
LED Savings and Simple Payback at the Music Building
ESCO Project 5 – Lab Building Upgrades
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Exhaust Hood and Makeup Air Optimization
Maintenance at ALBA facility: Strategy for the conventional services
2018 Retro-Commissioning (RCx) Program
Calibrated Energy Models: One New Change
Alabama Industrial Assessment Center
‘‘ BUILDING AUTOMATION’’
Presentation transcript:

Whole Building Retro-Commissioning at BU’s Photonics Center March 15, 2016

Photonics Center Built in 1995 275,000 sq ft B-9 Floors Mixed use: Presentation Title 5/20/2018 Photonics Center Built in 1995 275,000 sq ft B-9 Floors Mixed use: Wet labs Dry labs Clean Rooms Classrooms Offices

Base Case Building-wide simultaneous heating/cooling Presentation Title 5/20/2018 Base Case Building-wide simultaneous heating/cooling High air changes per hour (12-16+ ACH) No further capacity of exhaust system on West Side 500 1st generation VAV controllers limited memory Controllers attached to 10MB Network Controllers

Keys to Success Buy-in from upper management Presentation Title 5/20/2018 Keys to Success Buy-in from upper management Support from, and partner with, BU EHS Coordination of day-to-day space access

Technical Assistance Study Presentation Title 5/20/2018 Technical Assistance Study Eversource funded 25% National Grid funded 25% Boston University funded 50%

Technical Assistance Study Presentation Title 5/20/2018 Technical Assistance Study ECMs Identified: AHU Optimization Conference, Classroom, & Office Ventilation Reduction Lab Hood and Make-up Air Reduction Strobic Fan Motor Replacement and VFD Retrofit Boiler Controls Upgrade Chiller Plant Integration and Optimization Process Free Cooling

Savings Summary 2.2M kWh or 20% 90K Therms or 25% IRR +/- 25% Presentation Title 5/20/2018 Savings Summary 2.2M kWh or 20% 90K Therms or 25% IRR +/- 25% Savings realized by going beyond “typical” RCx and incorporate “fundamental” design changes/optimizations

Benefits Occupant comfort Operational improvements Presentation Title 5/20/2018 Benefits Occupant comfort Operational improvements “New” capacity for the future lab expansion