Project : Student Residence

Slides:



Advertisements
Similar presentations
Look what I did! date page began___________ Dr. Foxs signature and date: ________________ time:_____.
Advertisements

MULTICULTURAL LITERACY February 10, INTRODUCTION  1. What is jazz music?  2. Can you name anyone involved in jazz music?  3. Can you name major.
Sediment Concentration to Water Discharge Ratio Along the Mississippi (and Missouri) River CE 397 Statistics of Water Resources Yao You.
THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials.
 My favorite player is Andrew McCutchen.  My other favorite player is Pedro Alvarez.  Another favorite is Jason Grilli.  Also I like Russell Martin.
Things to do with Hedonic Prices © Allen C. Goodman, 2000.
3,000Ft 4,000Ft 5,000Ft O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2.
1 of 30 1 st Derivative The formula for the 1 st derivative of a function is as follows: It’s just the difference between subsequent values and measures.
European Immigration to the U.S. Honors Seminar Prof. Barr.
Chapter 2 Solution of Differential Equations Dr. Khawaja Zafar Elahi.
EXAMPLE 1 Simplify ratios SOLUTION 64 m : 6 m a. Then divide out the units and simplify. b. 5 ft 20 in. b. To simplify a ratio with unlike units, multiply.
Exam Cram. 2 | SharePoint Saturday St. Louis 2013.
The Episcopal (Anglican) Church of St. John the Evangelist St. John the Evangelist Springfield Gardens, New York.
TOO, TOO, TOO MUCH SNOW !! Global Warming = Greater Extremes and Less Predictability in Weather.
Mrs. Rivas International Studies Charter School..
Tutorial 2, Q1 solution The five scales: 1.Nominal scale serves only for classification. The order of the classes is unimportant as is the difference between.
J.G. Real Estate Development Group. Appraisal: $250,000 Offer: $240,000 Improvements: $15,000 Adjusted market value: $275, NW 12 Dr. Deerfield.
Work Breakdown Structure WBS
A cost index is a ratio of the cost of something now to its cost at some time in the past General equation is: C t = C 0 (I t /I o ) Example: The construction.
Section 1.3 Subtraction (know these terms) Section 1.31.
10-8 Areas and Volumes of Similar Solids
Surface Area of Triangular Prisms. A triangular prism has 5 faces. FRONT BACK RIGHT LEFT BOTTOM.
Worktext p. 181 Worktext p ___ units × ___ units = ___ square units 1 6 units
Lesson 8-2: Similar Polygons Similar: “Same _______ – different ______” –Think of it is ______________________ A B C X Y Z Look for properties.
Hedging and speculative strategies using index futures Short hedge: Sell Index futures - offset market losses on portfolio by generating gains on futures.
Acquisition/ Rehabilitation.  There are two types of acquisition/rehabilitation properties: Vacant  Vacant acq/rehabs are similar to new construction.
DR. Nabil Dmaidi Structural Steel. DR. Nabil Dmaidi Type of Steel n Designated by the letter “A” followed by the American Society for Testing and Materials.
Objective: I can solve problems using ratios and proportions.
Similar Ratios Are the following similar and if so what is their ratio? / 6 1 / 2 2 / 4 1 / 2 3 / 6 1 / 2 Yes, 1:2.
TEAM ZONING RESEARCH R.A. G ROUP II M EMBERS Cynthia Persaud Yefeng YanAbdelsalam Mali Richard Arenas R.A.
Prof Awad S. Hanna Project : Student Residence  New Project  Desired Capacity = 750,000 sq. ft  Expected Completion = End of 1998  Location = St. Louis,
Teton Basin Study Teton Lake vs Teton Dam.
Geometry/Trig 2 Unit 10 – Total Area and VolumeName: ____________________________________ page 1.
Policy Pillars: Environmental Stewardship, Economic Resiliency & Equity ENTERPRISE SCALE & BALANCE SHEET ON-THE-GROUND AND ON CAPITOL HILL REPUTATION &
The National Weather Service has recorded tornadoes in all months of the year for the St. Louis area. Historically there is “peak” of activity in early.
CVE 4070 Construction Engineering Estimating-2 Prof. Ralph V. Locurcio, PE.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Chem. 133 – 5/2 Lecture.
Estimating and Scheduling CEE 492
Area and Perimeter of Similar Figures
SOURCES OF ESTIMATION DATA
Solving Linear Inequalities in One Unknown
FORMWORK DR. Nabil Dmaidi.
Equipment Costs and Sources of EQUIPMENT COST
1. Find and Interpret the Regression line 2. Interpret the R-squared
1. EVYOM TECHNOLOGIES LLC 2. EVYOM TECHNOLOGIES PVT LTD 99 Wall St #217 E 59-60, 1st Floor, Sector 3, Noida New York, NY 10005, USA U.P ,
BACK SOLUTION:
Measurement GTT – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Adjusted odds ratio 95% CI Diagnostic angiography PCI CABG
ABC PE 4 Provides most information for utilities cost—buildings
Systems of Inequalities
בטיחות בתעשייה בהיבט חברות הביטוח
به نام خدا به نام خدا.
Concrete Structures DR. Nabil Dmaidi.
ABC PE 3 1. What is the best cost driver for overhead cost related to the utilities portion?   a. Number of buildings b. Number of vehicles c. Number.
Images from the Life of Dred Scott
ABC PE 1 Provides most information for utilities cost—buildings
MEASUREMENT.
Section 8.5 Proving Triangles are Similar
MEASUREMENT.
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Volume ratios of similar solids
Project Nexus Workgroup
Surface Area of Triangular Prisms
Missing Lengths of Similar Figures Practice
Proportion Guided Notes
Thing / Person:____________________ Dates:_________________
Similarities Differences
Mystery Picture ????????????.
MEASUREMENT.
Presentation transcript:

Project : Student Residence New Project Desired Capacity = 750,000 sq. ft Expected Completion = End of 1998 Location = St. Louis, Missouri Similar Project Capacity = 360,000 sq. ft Completion Date = Jan 1, 1993 Location = New York, NY Cost = 23,000,000 DR. Nabil Dmaidi

Information What is the expected cost in St. Louis? Cost Index New York Jan 1993 = 2603 Cost Index New York Jan 1997 = 3076 Cost Index St. Louis Jan 1997 = 2390 What is the expected cost in St. Louis? DR. Nabil Dmaidi

Solution Cost Unit Cost (New York) UP1 = = = $63.89/sq. ft. 1. Time Adjustment New York  Ratio = = 1.18 Assuming escalation rate at 3% / year Project unit cost at the end of 1998 = 63.89 (1+0.03)2 x 1.18 = $79.98 Area 23,000,000 360,000 3076 2603 DR. Nabil Dmaidi

Solution (cont.) 2. Location Latest CI for NY = 3076 Latest CI for St. Louis = 2390 Ratio = = 0.78 Base Unit Cost (St. Louis) = 79.98 x 0.78 = 62.38 2390 3076 DR. Nabil Dmaidi

Solution (cont.) 3. Size UP2 = UP1 ( )x-1 = 62.38 ( )0.6 -1 Q2 Q1 = 62.38 ( )0.6 -1 = 62.38 x 1.16 = 72.36 Q2 Q1 250,000 360,000 DR. Nabil Dmaidi